ML17292A531
| ML17292A531 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/08/1996 |
| From: | Dyer J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17292A532 | List: |
| References | |
| NUDOCS 9610150020 | |
| Download: ML17292A531 (6) | |
See also: IR 05000397/1996017
Text
e%
1
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9610150020
DOC.DATE: 96/10/08
NOTARIZED: NO
DOCKET
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
05000397
~
~
~
~
AUTH.NAME
AUTHOR AFFILIATION
YERPJ.E.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT: Forwards insp rept 50-397/96-17
on 960804-0914.No violations
observed.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR J
ENCL
I
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD4-2
INTERNAL: ACRSon/m
FILE CENT
RR DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
COLBURN,T
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
1
1
1,
1
1
1
1
1
1
1
1
1
0
ERNAL: LITCO BRYCEPJ
H
NRC
1
1
1
1
NOAC
1
1
D
U
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
UN I T E0 STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
OCT
8
F995
J. V. Parrish, Chief Executive Officer
Washington Public Power Supply System
3000 George Washington Way
P.O. Box 968, MD 1023
Richland, Washington
99352
SUBJECT:
NRC INSPECTION REPORT 50-397/96-17
Dear Mr. Parrish:
An NRC inspection was conducted August 4 through September
14, 1996, at your
Washington Nuclear Project-2 reactor facility. The enclosed report presents the scope and
results of that inspection.
p
cu
e ted In the enclosed report.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be placed in the NRC Public Document Room (PDR).
Areas examined during the inspection are identified in the report.
Within these areas, the
inspection consisted of selective examinations of procedures
and representative
records,
interviews with personnel,
and observation of activities in progress.
The results of this
ins ection are do
m n
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
J. E. Dyer, Director
Division of Reactor Projects
Docket No.: 50-397
License No.:
Enclosure:
NRC Inspection Report
50-397/96-1 7
96iOi50020 96i008
ADQCK 05000397
8
Washington Public Power
Supply System
cc w/enclosure:
Frederick S. Adair, Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Chairman
Benton County Board of Commissioners
P.O. Box 69
Prosser, Washington
99350-0190
Mr. Paul R. Bemis (Mail Drop PE20)
Vice President,
Nuclear Operations
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President,
Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Al E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Washington Public Power
Supply System
-3-
Ms. Lourdes C. Fernandez
(Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Malcolm H. Phillips, Jr., Esq.
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
OCT
8 896
Washington Public Power
Supply System
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
bcc to DMB (IE01)
bcc distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
- Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:i WN2ttWN617RP.RCB
To receive copy of document,
Indicate in box: "C""-Copy without enclosures
"E" = Copy with enciosures
"N" = No copy
RIV:RI:DRP/E
RCBarr
10/04/96
AC:DRP/E
FRHuey
10/04/96
D:DRP
JEDyer
10/ /96
OFFICIAL RECORD COPY
OCT
8 f996
Washington Public Power
Supply System
-4-
E-Mail report to D. Nelson (DJN)
E-Mail report to NRR Event Tracking System (IPAS)
.MWIEOR'g~'cc
distrib. by RIV:
L. J. Callan
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:lt WN2'tWN617RP.RCB
To receive copy of document,
indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures
"N" = No copy
RIV:RI:DRP/E
RCBarr
10/04/96
AC:DRP/E
FRHuey
1 0/04/96
D:DRP
JEDyer
10/ /96
OFFICIAL RECORD COPY
15'og