ML17292A522

From kanterella
Jump to navigation Jump to search
Notification of 961022 Predecisional Enforcement Conferences in Arlington,Tx to Discuss Apparent Violations Re Command & Control Issues & Missed Surveillances
ML17292A522
Person / Time
Site: Columbia 
Issue date: 10/04/1996
From: Brockman K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
EA-96-327, EA-96-343, NUDOCS 9610080194
Download: ML17292A522 (6)


Text

~pS RECq(

O~c i

+*~+"

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA ORIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 ocr -4 I996 NOTICE OF LICENSEE MEETING Name of Licensee:

Name of Facility:

Docket:

EA Nos.:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

Washington Public Power Supply System Washington Nuclear Project No. 2 (WNP-2) 50-397 C

96-343 and 96-327 October 22, 1996, at 9 a.m. and 1 p.m. CDT Region IV, Arlington, Texas 4th Floor Training Conference Room Predecisional Enforcement Conferences to Discuss Apparent Violations Related to Command and Control Issues and Missed Surveillances T. GAIynn, Acting Deputy Regional Administrator J. Dyer, Director, Division of Reactor Projects D. Chamberlain, Acting Deputy Director, Division of Reactor Projects K. Brockman, Acting Director, Division of Reactor Safety G. Vasquez, Acting Regional Enforcement Officer G. Johnston, Senior Project Inspector, Project Branch E, Division of Reactor Projects R. Barr, Senior Resident Inspector, WNP-2 T. McKernon, Acting Chief, Operations Branch, Division of

, Reactor Safety V. Parrish, Chief Executive Officer, Washington Public Power Supply System P. Bemis, Vice President, Nuclear Operations, Washington Public Power Supply System R. Webring, Vice President, Operations Support, Washington Public Power Supply System G. Smith, Plant General Manager, WNP-2 J. Swailes, Director, Engineering, WNP-2 D. Swank, Manager, Regulatory Affairs, WNP-2 A. Langdon, Acting Manager, Operations, WNP-2 C. Townsend, Control Room Supervisor, WNP-2 D. Schumann, Control Room Supervisor, WNP-2 9610080194 961004 PDR ADOCK 05000397 6

PDR

Washington Public Power Supply Meeting October 22, 1996 NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Tom McKernon at 817-860-8153 by COB on October 17, 1996.

Approved By:

enneth E. Br m, Acting Director Division of Reactor Safety DISTRIBUTION:

See next page

Washington Public Power Supply Meeting October 22, 1996 CC:

J. V. Parrish, Chief Executive Officer Washington Public Power Supply System 3000 George Washington Way P.O. Box 968, MD 1023 Richland, Washington 99352 Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P.O. Box'43172 Olympia, Washington 98504-31 72 Chairman Benton County Board of Commissioners P.O. Box 69 Prosser, Washington 99350-0190 Mr. Paul R. Bemis (Mail Drop PE20)

Vice President, Nuclear Operations Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

Washington Public Power Supply Meeting October 22, 1996 Mr. Al E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Ms. Lourdes C. Fernandez (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Malcolm H. Phillips, Jr., Esq.

Winston 5 Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply Meeting October 22, 1996 E-Mail To:

FOR

(

)

PMNS SAM PAB WTR ACT RPZ TGC OEMAIL LJC GDR CAH DMK1 GFS BWH MFH2 JAC1, CMS, CJG LAT, DLF, CAM3 CLS1, LMB, CLG CAD, NLH, WSW LSO CC:

DMB (IE 45)

OEDO RIV Coordin Receptionist ORA File RIV File NRC Attendees Mtg Announcement Coordinator J. L. IVlilhoan, DEDR H. L. Thompson, DEDS W. T. Russell, D/NRR A. C. Thadani, ADT/NRR R. P. Zimmerman, ADP/NRR T. Colburn, Project Manager, NRR J. Lieberman, D/OE L. J. Chandler, OGC G. Replogle, Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO RA Secretaries DRP Division DRS Division DNMS Division Linda Ousley ator (17G21)

DOCUMENT NAME: G:iOB'tMTGNOTCE.TOM To receive copy of document, Indicate in box: "C" = Copy without enciosures "E" = Co y with enciosures "N" = No copy AC: OB E

AC PBE E

EO E

PAO E

RSLO

'fg E

TOMcKernon 0

6 FRHuey

/96 GFSanbor 09 96 BHenderson 09 96 CAHackn y 09/$ 96 D:DRP E

AD:DRS N

JEDyer

///96 KEBrockman

//6 OFFICIAL RECORD COPY

Washington Public Power Supply Meeting October 22, 1996 E-Mail To:

FOR

(

)

PMNS SAM PAB WTR ACT RPZ TGC OEMAIL LJC GDR CAH DMK1 GFS BWH MFH2 JAC1, CMS, CJG LAT, DLF, CAM3 CLS1, LMB, CLG CAD, NLH, WSW LSO cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File NRC Attendees Mtg Announcement Coordinator J. L. Milhoan, DEDR H. L. Thompson, DEDS W. T. Russell, D/NRR A. C. Thadani, ADT/NRR R. P. Zimmerman, ADP/NRR T. Colburn, Project Manager, NRR J. Lieberman, D/OE L. J. Chandler, OGC G. Replogle, Resident Inspector C. A. Hackney, RSLO D. M. Kunihiro, WCFO G. F. Sanborn, EO B. Henderson, PAO M. Hammond, PAO RA Secretaries DRP Division DRS Division DNMS Division Linda Ousley DOCUMENT NAME: G:iOBiMTGNOTCE.TOM To receive copy of document, indicate In box: "C" ~ Copy without endosures "E" = Co y with enctosures "N" = No copy AC: OB E

TOMcKernon 0

6 D:DRP E

JEDyer

///96 PAO E

BHenderson 09 96 FRHuey GFSanbor 09 96

/96 AD:DRS N

KEBrockman

//6 OFFICIAL RECORD COPY AC'PBE E

EO E

RSLO

'fq E

CAHackn y 09/$ 96