Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-96-221, Discusses Nov 1995 Meeting W/Nrc & Util Re Progress Made in Completing Activities Outlined in St Lucie Plan to Improve Operational Performance.Key Performance Indicators,Encl + (05:59:11, 8 January 2025)
- L-96-212, Forwards Rev 30 to Radiological Emergency Plan for St Lucie Plant & Revised EPIPs + (05:59:15, 8 January 2025)
- L-96-193, Forwards Matls Reviewed During 960719 FPL St. Lucie Status Meeting Including Key Performance Indicators for Plant + (05:59:17, 8 January 2025)
- ML17309A846 + (05:59:20, 8 January 2025)
- ML17309A844 + (05:59:22, 8 January 2025)
- TAC:M95274 + (05:59:22, 8 January 2025)
- ML17309A843 + (05:59:24, 8 January 2025)
- ML17309A840 + (05:59:25, 8 January 2025)
- ML17309A838 + (05:59:26, 8 January 2025)
- L-96-105, Annual Environ Operating Rept + (05:59:27, 8 January 2025)
- ML17309A833 + (05:59:29, 8 January 2025)
- ML17309A832 + (05:59:30, 8 January 2025)
- ML17309A830 + (05:59:31, 8 January 2025)
- ML17309A831 + (05:59:31, 8 January 2025)
- ML17309A829 + (05:59:32, 8 January 2025)
- ML17309A828 + (05:59:33, 8 January 2025)
- 05000389/LER-1996-001-01, :on 960105,reactor Manually Tripped Due to High Main Generator Cold Gas Temp.Caused by Failure of Hydrogen Cooler Temp Cv Controller to Maintain TCV in Proper Position.Tcv Setting adjusted.W/960312 Resubmitted Ltr + (05:59:35, 8 January 2025)
- ML17309A826 + (05:59:36, 8 January 2025)
- ML17309A824 + (05:59:56, 8 January 2025)
- ML17309A822 + (05:59:57, 8 January 2025)
- ML17309A821 + (05:59:58, 8 January 2025)
- IR 05000335/1995099 + (05:59:59, 8 January 2025)
- L-95-342, Forwards Rev 29 to Radiological Emergency Plan for St Lucie Plant. Attachment 1 Contains Listing of Pages W/Description of Changes Made to Plan + (06:01:06, 8 January 2025)
- L-95-339, Advises That Util,In Cooperation W/State of Fl,St Lucie County & Martin County Will Conduct Exercise of Emergency Plan on 960207 + (06:01:44, 8 January 2025)
- 05000389/LER-1995-005-02, :on 951120,2A EDG Relay Socket Failures Occurred Due to High Cycle Fatigue.Replaced Degraded Relay Sockets & 2A & 2B EDGs Run for 24 H Each,At Full Load After Replacement of Degraded Relay Sockets + (06:01:48, 8 January 2025)
- L-95-320, Forwards Rev 0 to Plant Administrative Procedure 2-0010024, Inservice Testing Program for Pumps & Valves + (06:01:50, 8 January 2025)
- L-95-150, Forwards Info Copy of NPDES Permit FL0002208 Mod,Issued by EPA on 941025 + (06:01:52, 8 January 2025)
- IR 05000333/1995014 + (06:02:02, 8 January 2025)
- 05000335/LER-1995-004-01, :on 950801,controlled Shutdown of Unit 1 & 2 Was Performed & Security Safeguards Partially Suspended Due to Indication That Hurricane Force Winds Imminent at Plant. Reinstated Safeguard Measures + (06:02:04, 8 January 2025)
- 05000335/LER-1995-005, :on 950809,pressurizer PORV Inoperable Due to Personnel Error.Removed & Reassembled Pressurizer Porvs + (06:02:06, 8 January 2025)
- 05000335/LER-1995-006, :on 950810,reactor Coolant Inventory Through Shutdown Cooling Relief Valve Was Lost Due to Lack of Design Margin.Increased Lift Setpoint Pressure & Reduced Minimum Required Blowdown + (06:02:09, 8 January 2025)
- L-95-220, Forwards Suppl to ISI Plan Second ten-yr Interval Revised Stress & Fracture Mechanics Evaluations Pressurizer Instrument Nozzles + (06:02:11, 8 January 2025)
- L-95-133, Application for Amends to Licenses DPR-67 & NPF-16.Amends Would Allow Up to Seven Days to Restore an Inoperable LPSI Train to Operable Status + (06:02:15, 8 January 2025)
- L-95-180, Forwards Fl Dept of Environ Protection 950601 Order Combining NPDES Permit W/State Wastewater Permit + (06:02:18, 8 January 2025)
- L-95-158, Rept of Changes Made to Facility Under Provisions of 10CFR50.59 for Period 930618-941201 + (06:02:22, 8 January 2025)
- ML17309A787 + (06:02:30, 8 January 2025)
- L-95-113, 1994 Annual Radiological Environ Operating Rept St Lucie Plant Units 1 & 2 + (06:02:31, 8 January 2025)
- 05000335/LER-1994-009, :on 941122,inadvertent SI Actuation Signal/ Containment Isolation Signal Due to Failed Pressure Transmitters.Util QA Performed Record Search W/Rosemount to Identify Affected Transmitters + (06:03:36, 8 January 2025)
- ML17309A779 + (06:03:38, 8 January 2025)
- ML17309A773 + (06:03:38, 8 January 2025)
- ML17309A771 + (06:03:40, 8 January 2025)
- IR 05000335/1994405 + (06:03:43, 8 January 2025)
- ML17309A765 + (06:03:44, 8 January 2025)
- L-94-280, Forwards Rev 27 to Radiological Emergency Plan for St Lucie Plant, Per Commitment Re Dose Limits to Emergency Workers Detailed in Item 1 of NRC + (06:03:45, 8 January 2025)
- L-94-295, Confirms That Util Replaced 15 Leaking Westinghouse Mechanical Tube Plugs in Rows 5 or Greater & Has Preventatively Replaced Only Two Mechanical Tube Plugs in Row 4 or Less,Per NRC Bulletin 89-001 + (06:03:50, 8 January 2025)
- ML17309A762 + (06:03:50, 8 January 2025)
- IR 05000335/1994300 + (06:03:53, 8 January 2025)
- ML17309A757 + (06:03:54, 8 January 2025)
- ML17309A756 + (06:03:56, 8 January 2025)
- L-94-291, Forwards Relief Request 13A,requesting Approval for Alternative non-code Repair to Correct Through Wall Leakage & Corrosion on Refueling Water Tank Bottom.Rev 1,Suppl 1 to Plant Change/Mod (Pc/M) 128-194 Also Encl + (06:03:57, 8 January 2025)
- L-94-198, Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Encl Administrative Changes + (06:04:01, 8 January 2025)