ML17309A773
| ML17309A773 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/21/1995 |
| From: | Sager D FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17228B027 | List: |
| References | |
| L-95-47, NUDOCS 9502270257 | |
| Download: ML17309A773 (2) | |
Text
PR.IVOR.l EY' ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
DOCKET I 05000335 NOTES:
ACCESSION NBR:9502270257 DOC.DATE: 95/02/21 NOTARIZED: NO FACIL:50-335 St: Lucie Plant, Unit 1, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
Zpjg
SUBJECT:
Forwards Rev 0 to "Second ISI Interval Second Insp Period Third Outage 1994 Summary Rept Submittal."
DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTRl ENCL L SIZE:
P 50 TXTLE: OR Submittal: Xnservice/Testing/Relief from ASMMCode GL-89-04 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL:
CR XLE CE XER~Ol NRR7DE/EMEB OGC/HDS3 EXTERNAL: LITCO BROWN,B NOAC COPIES LTTR ENCL 1
1 1
1 6
6 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/SPD/RAB NRR/DE/EMCB NUDOCS-ABSTRACT RES/DSIR/EIB LITCO RANSOME I C NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1
.1 1
YOTE TO ALL"RIDS" RECIPIEYTS:
PLEASE HELP US TO REDUCE ~VASTE! COYTACT'I'HEDOCL'MIEN CONTROL DESK, ROON! PI -37 IEXT. 504-70S3
) TO E LIXII%ATEYOUR XAIIE PRO%I DISTRIBU'I'IONLISTS I'OR DOCI.'4!EX'I'SYOL'OY,"I'LI;D!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 19
Florida Power 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128 February 21, 1995 L-95-47 10 CFR 50.55a 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 Re:
St. Lucie Unit 1 Docket No. 50-335 1994 Fall Refueling Outage In-Service Ins ection Summar Re ort In accordance with Article IWA-6000 of ASME Section XI, enclosed is the In-Service Inspection (ISI) Summary Report for St.Lucie Unit 1 1994 Fall refueling outage.
IWA-6230 requires the report to be submitted to the authority having jurisdiction within 90 days of completing the in-service inspection conducted during the outage.
Included with the NIS-1 Report are several attachments that include the 1994 Eddy Current Summary
- Report, 1994 Outage Snubber Functional Testing Summary Report, and the NIS-2 Owners'eport for Repairs and Replacements performed since the preceding summary report submittal.
The Eddy Current Summary Report provides the information required by Sections 4.4.5.5.b and 6.9.2 of the St. Lucie Unit 1 Technical Specifications (TS).
The TS requires the submittal of the Steam Generator Tube In-Service Inspection Special Report within 12 months of completing the tube inspection.
Should there be any questions, please contact us.
Very truly yours, D. A.
Vice r St.
L er sident e Plant DAS/grm Enclosure cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 9502270257 950221 PDR ADOCK 05000335 9