ML17309A843
| ML17309A843 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/02/1996 |
| From: | Hebon F NRC (Affiliation Not Assigned) |
| To: | Jerrica Johnson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17309A839 | List: |
| References | |
| TAC-M95274, TAC-M95275, NUDOCS 9607080017 | |
| Download: ML17309A843 (3) | |
Text
Tl I
CATEGORY 2 REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:9607080017 'OC.DATE: 96/07/02 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.
AUTH.NAME AUTHOR AFFILIATION HEBONFF.J.
>RECIP.NAME RECIPIENT AFFILIATION JOHNSON,J.R.
Region 2 (Post 820201)
SUBJECT:
Forwards discussion of technical assistance request (TIA-96-007) regulatory acceptability of lubricating valves prior to surveillance testing l;
NRR response to questions contained in attached memo dtd 960624.
DISTRIBUTION CODE:
DFOID COPIES RECEIVED:LTR I
ENCL I
SIZE: IWG TITLE: Direct Flow Distribution:
50 Docket (PDR Avail)
NOTES:
DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME INTERNA
- FILE CENTER EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1
1 1
1 0
D 0
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 4
ENCL 4
4y'8 ~E00 'Ip
+
0 Cv OO IVl Cy
+**y4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 July 2, 1996 MEMORANDUM TO:
Jon R. Johnson, Acting Director Division of Reactor Projects, RII FROM:
SUBJECT:
Frederick J.
- Pebdon, Director Project Directorate II-3 Division of Reactor Projects I/II, NRR TECHNICAL ASSISTANCE REQUEST (TIA 96-007)
REGULATORY ACCEPTABILITY OF LUBRICATING VALVES PRIOR TO SURVEILLANCE TESTING (TAC NOS.
M95274 AND M95275)
In a memorandum dated April 12,
- 1996, as a result of valve stroke timing practices at the St. Lucie Plants, you requested NRR assistance in evaluating the acceptability of lubricating valves prior to the performance of stroke time testing.
You also asked NRR to resolve a question as to whether the purpose of the stroke time testing was to demonstrate current and past operability of a valve, current and future operability of a valve, or both.
The Mechanical Engineering Branch (EHEB),
- NRR, has completed its review of these issues.
A discussion of these issues and NRR's response to your questions is contained in the attached memorandum dated June 24, 1996.
Docket Nos.:
50-335 and 50-389
Attachment:
As Stated
'c w/attachment:
R. Cooper, RI W. Axelson, RIII J.
- Dyer, RIV
Contact:
L. Wiens, NRR)PDII-3 415-1495 1800
)g p7 OZQOI t I
no4 so-33K