Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202D464 + (08:12:57, 8 December 2024)
- ML20202D460 + (08:12:58, 8 December 2024)
- ML20202D455 + (08:12:59, 8 December 2024)
- PNO-IV-86-022, on 860708,plant Shut Down for More than 48 H Due to Continued Temp Rise in Leak Off Temp from Reactor Coolant Pump Seal 2B.Caused by Seal Deterioration.Seal Will Be Replaced During Outage + (08:12:59, 8 December 2024)
- ML20202D452 + (08:13:00, 8 December 2024)
- ML20202D450 + (08:13:05, 8 December 2024)
- ML20202D449 + (08:13:06, 8 December 2024)
- ML20202D445 + (08:13:06, 8 December 2024)
- PNO-II-99-003, on 990128,medical Misadministration Occurred. Eight Mci of I-131 Were Prescribed & 9.8 Were Actually Administered Resulting in 22% More Activity Administered than Planned.Nrc Will Conduct Insp to Review Event + (08:13:07, 8 December 2024)
- NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 + (08:13:08, 8 December 2024)
- ML20202D441 + (08:13:09, 8 December 2024)
- ML20202D439 + (08:13:09, 8 December 2024)
- ML20202D436 + (08:13:11, 8 December 2024)
- ML20202D437 + (08:13:11, 8 December 2024)
- ML20202D434 + (08:13:14, 8 December 2024)
- ML20202D432 + (08:13:15, 8 December 2024)
- ML20202D431 + (08:13:15, 8 December 2024)
- ML20202D430 + (08:13:16, 8 December 2024)
- ML20202D428 + (08:13:16, 8 December 2024)
- ML20202D424 + (08:13:18, 8 December 2024)
- ML20202D423 + (08:13:19, 8 December 2024)
- ML20202D417 + (08:13:20, 8 December 2024)
- W3P86-1640, Endorses NUMARC 860617 Comments on Proposed Rule on Station Blackout.Concerns More Appropriately Addressed Through Industry Initiatives to Enhance Ac Power Reliability & Station Blackout Coping Ability + (08:13:20, 8 December 2024)
- ML20202D416 + (08:13:21, 8 December 2024)
- ML20202D415 + (08:13:22, 8 December 2024)
- ML20202D413 + (08:13:23, 8 December 2024)
- ML20202D412 + (08:13:24, 8 December 2024)
- ML20202D409 + (08:13:24, 8 December 2024)
- ML20202D404 + (08:13:25, 8 December 2024)
- ML20202D402 + (08:13:25, 8 December 2024)
- 3F1297-25, Provides NRC W/Results of Integrated Safety Assessment Performed by multi-disciplined Team to Review Mods & EOPs Changes to Assess Impact on Fsar,Chapter 14 Accidents & Events Relative to Operator Actions,Burden & Safety Margins + (08:13:26, 8 December 2024)
- ML20202D394 + (08:13:29, 8 December 2024)
- ML20202D393 + (08:13:29, 8 December 2024)
- ML20202D392 + (08:13:30, 8 December 2024)
- ML20202D391 + (08:13:30, 8 December 2024)
- ML20202D389 + (08:13:31, 8 December 2024)
- ML20202D388 + (08:13:31, 8 December 2024)
- W3P86-1913, Responds to Generic Ltr 86-04 Re Engineering Expertise on Shift.All Shift Technical Advisors Work 8 H Day Normal Shift Rotation W/Licensed Operators & Have Engineering Degrees + (08:13:32, 8 December 2024)
- ML20202D386 + (08:13:33, 8 December 2024)
- ML20202D385 + (08:13:34, 8 December 2024)
- ML20202D383 + (08:13:35, 8 December 2024)
- ML20202D380 + (08:13:36, 8 December 2024)
- ML20202D379 + (08:13:36, 8 December 2024)
- 05000247/LER-1986-019, :on 860609,safety Injection Sys Actuated After Manual Reactor/Turbine Trip While One Main Boiler Feed Pump in Operation.Caused by Failed Bistable TC-412 I.Inoperable Pump Repaired & Bistable Replaced + (08:13:38, 8 December 2024)
- JPN-98-004, Forwards Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads + (08:13:39, 8 December 2024)
- ML20202D376 + (08:13:39, 8 December 2024)
- ML20202D372 + (08:13:40, 8 December 2024)
- ML20202D365 + (08:13:41, 8 December 2024)
- ML20202D363 + (08:13:42, 8 December 2024)
- ML20202D361 + (08:13:42, 8 December 2024)
- ML20202D360 + (08:13:43, 8 December 2024)
- ML20202D358 + (08:13:44, 8 December 2024)