Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20202H646 + (07:25:05, 8 December 2024)
- ML20202H642 + (07:25:06, 8 December 2024)
- ML20202H639 + (07:25:08, 8 December 2024)
- 05000412/LER-1998-001, :on 980112,failure to Perform Surveillance Testing of Ci Spring Loaded Check Valve Was Noted.Caused by Fact That Ci Spring Loaded Check Valve Was Not Uniquely identified.2CVS-93 Was Successfully Tested + (07:25:10, 8 December 2024)
- 05000277/LER-1985-019, :on 850919,RHR Pump Declared Inoperable.Caused by Low Flow in Low Head Region of Pump Performance Curve. Pump Removed from Svc & Inspected.Pump Determined to Be in Compliance W/Tech Spec Requirements + (07:25:12, 8 December 2024)
- ML20202H632 + (07:25:13, 8 December 2024)
- ML20202H631 + (07:25:14, 8 December 2024)
- ML20202H626 + (07:25:18, 8 December 2024)
- ML20202H627 + (07:25:18, 8 December 2024)
- ML20202H623 + (07:25:20, 8 December 2024)
- ML20202H624 + (07:25:20, 8 December 2024)
- ML20202H622 + (07:25:21, 8 December 2024)
- ML20202H620 + (07:25:22, 8 December 2024)
- 05000382/LER-1999-001, :on 990105,TS 3.0.3 Was Entered.Caused by Less than Adequate Chiller Thermostat Control.Placed Tamper Seal on Chiller Thermostat.With + (07:25:23, 8 December 2024)
- 3F1297-31, Confirms Conversations Between NRC EOP Insp Team Members & FPC on 971203 & 04 Re Status of EOP Insp.Info to Assist EOP Insp Team When Team Returns on 971208,provided + (07:25:24, 8 December 2024)
- ML20202H616 + (07:25:25, 8 December 2024)
- ML20202H612 + (07:25:26, 8 December 2024)
- ML20202H608 + (07:25:27, 8 December 2024)
- ML20202H611 + (07:25:27, 8 December 2024)
- ML20202H607 + (07:25:28, 8 December 2024)
- ML20202H606 + (07:25:29, 8 December 2024)
- 05000528/LER-1986-018, :on 860307,automatic Reactor Trip Occurred Due to Low Level Condition in Steam Generator 2.Caused by Anomaly in Speed Control Circuitry for Main Feedwater Pump A.Circuit Board Will Be Replaced + (07:25:30, 8 December 2024)
- ML20202H604 + (07:25:31, 8 December 2024)
- ML20202H602 + (07:25:32, 8 December 2024)
- ML20202H601 + (07:25:32, 8 December 2024)
- ML20202H599 + (07:25:33, 8 December 2024)
- ML20202H596 + (07:25:34, 8 December 2024)
- ML20202H597 + (07:25:34, 8 December 2024)
- ML20202H590 + (07:25:35, 8 December 2024)
- ML20202H591 + (07:25:35, 8 December 2024)
- ML20202H587 + (07:25:36, 8 December 2024)
- 05000423/LER-1998-002-01, :on 980112,verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Was Not Being Met.Caused by Personnel Not Considering ECCS cross-tie Piping as Discharge Piping. Revised ECCS Venting Sp + (07:25:38, 8 December 2024)
- ML20202H581 + (07:25:39, 8 December 2024)
- 1CAN129703, Requests Relief for RCS Weld Exam,From Requirements of 10CFR50.55(a)(g).Relief Request for 2 Welds Whose Volumes Could Not Be Examined 100%,encl + (07:25:40, 8 December 2024)
- ML20202H580 + (07:25:40, 8 December 2024)
- ML20202H574 + (07:25:41, 8 December 2024)
- ML20202H571 + (07:25:42, 8 December 2024)
- ML20202H569 + (07:25:43, 8 December 2024)
- ML20202H568 + (07:25:43, 8 December 2024)
- ML20202H567 + (07:25:44, 8 December 2024)
- ML20202H566 + (07:25:45, 8 December 2024)
- ML20202H562 + (07:25:46, 8 December 2024)
- ML20202H563 + (07:25:46, 8 December 2024)
- ML20202H557 + (07:25:47, 8 December 2024)
- ML20202H555 + (07:25:48, 8 December 2024)
- ML20202H553 + (07:25:49, 8 December 2024)
- ML20202H550 + (07:25:50, 8 December 2024)
- ML20202H545 + (07:25:54, 8 December 2024)
- ML20202H543 + (07:25:54, 8 December 2024)
- ML20202H542 + (07:25:55, 8 December 2024)
- ML20202H541 + (07:25:56, 8 December 2024)
- ML20202H538 + (07:25:56, 8 December 2024)