Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203B359 + (06:55:05, 8 December 2024)
- ML20203B356 + (06:55:06, 8 December 2024)
- ML20203B354 + (06:55:07, 8 December 2024)
- ML20203B352 + (06:55:07, 8 December 2024)
- ML20203B350 + (06:55:08, 8 December 2024)
- ML20203B351 + (06:55:08, 8 December 2024)
- NSD-NRC-97-5454, Discusses SSAR Rev,Proposing Suppl Criteria That Would Require Min Shear Reinforcement at Most Locations of AP600 Basemat.Draft SSAR Rev Encl + (06:55:09, 8 December 2024)
- ML20203B348 + (06:55:09, 8 December 2024)
- ML20203B345 + (06:55:15, 8 December 2024)
- ML20203B343 + (06:55:15, 8 December 2024)
- ML20203B342 + (06:55:16, 8 December 2024)
- 1CAN048605, Provides Info to Document 860327 Telcon Re Seismic Design Issue Noted in Insp Rept 50-313/86-01 on 860106-31.Disagrees W/Nrc Conclusion That Seismic Class 2 Structures Not Considered in Plant Design + (06:55:17, 8 December 2024)
- ML20203B336 + (06:55:17, 8 December 2024)
- ML20203B334 + (06:55:19, 8 December 2024)
- ML20203B333 + (06:55:19, 8 December 2024)
- ML20203B332 + (06:55:20, 8 December 2024)
- ML20203B330 + (06:55:22, 8 December 2024)
- B12002, Forwards Probabilistic risk-based Fire Analysis of internally-initiated Events.Fire Analysis Documented as Chapter 6 of Probabilistic Safety Study.W/Nine Oversize Encls + (06:55:24, 8 December 2024)
- ML20203B328 + (06:55:24, 8 December 2024)
- U-600534, Forwards Addendum Info Re Power Ascension Program Acceleration Test Package STP 8.0, Control Rod Sequence Exchange Test Deletion. Info Provides Examples of Startup Test Programs Using GE Procedures + (06:55:25, 8 December 2024)
- ML20203B323 + (06:55:26, 8 December 2024)
- U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 + (06:55:26, 8 December 2024)
- ML20203B321 + (06:55:27, 8 December 2024)
- NRC-86-9043, Forwards Update of All Commitments Made in Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Post-trip & post-maint Operability Testing Review Completed + (06:55:28, 8 December 2024)
- ML20203B319 + (06:55:28, 8 December 2024)
- ML20203B316 + (06:55:29, 8 December 2024)
- ML20203B314 + (06:55:30, 8 December 2024)
- ML20203B313 + (06:55:30, 8 December 2024)
- ML20203B312 + (06:55:31, 8 December 2024)
- ML20203B311 + (06:55:31, 8 December 2024)
- ML20203B309 + (06:55:32, 8 December 2024)
- ML20203B307 + (06:55:36, 8 December 2024)
- HL-5558, Edwin I Hatch Nuclear Plant,Unit 1,Power Uprate Startup Test Rept for Cycle 18 + (06:55:37, 8 December 2024)
- ML20203B304 + (06:55:37, 8 December 2024)
- ML20203B303 + (06:55:38, 8 December 2024)
- ML20203B301 + (06:55:38, 8 December 2024)
- ML20203B300 + (06:55:39, 8 December 2024)
- ML20203B298 + (06:55:40, 8 December 2024)
- ML20203B296 + (06:55:40, 8 December 2024)
- ML20203B295 + (06:55:41, 8 December 2024)
- ML20203B294 + (06:55:41, 8 December 2024)
- ML20203B290 + (06:55:42, 8 December 2024)
- ML20203B288 + (06:55:43, 8 December 2024)
- U-602940, Ro:On 980213,alert Emergency Classification Was Declared IAW EPIP EC-02, Emergency Classifications. Caused by Tripped Inverter.Rhr a Was Restored at Approx 0945 H & Emergency Terminated at 1004 H Per EPIP EC-04, Alert + (06:55:43, 8 December 2024)
- ML20203B285 + (06:55:44, 8 December 2024)
- ML20203B283 + (06:55:45, 8 December 2024)
- PNO-II-99-007, on 990205,licensee Reported to Tn Div of Radiological Health That Resin Spill Occurred in Facility. There Were No Personnel Exposures & No Release Outside Bldg. Contamination Was Still Being Cleaned Up on 990208 + (06:55:45, 8 December 2024)
- L-97-070, Forwards Response to Violations Noted in Integrated Insp Repts 50-334/97-07 & 50-412/97-07.Corrective Actions:Qsu Performed 10CFR50.54(a)(3) Evaluation Re Reassignment of Quality Control Receiving Insp Function from Qsu + (06:55:46, 8 December 2024)
- ML20203B282 + (06:55:46, 8 December 2024)
- ML20203B278 + (06:55:47, 8 December 2024)
- ML20203B277 + (06:55:48, 8 December 2024)
- ML20203B275 + (06:55:49, 8 December 2024)