Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203G830 + (05:56:53, 8 December 2024)
- ML20203G829 + (05:56:54, 8 December 2024)
- ML20203G828 + (05:56:54, 8 December 2024)
- ML20203G825 + (05:56:55, 8 December 2024)
- ML20203G822 + (05:56:56, 8 December 2024)
- IR 05000454/1999001 + (05:56:57, 8 December 2024)
- ML20203G819 + (05:56:58, 8 December 2024)
- ML20203G814 + (05:56:58, 8 December 2024)
- ML20203G813 + (05:56:59, 8 December 2024)
- ML20203G811 + (05:57:01, 8 December 2024)
- 05000325/LER-1986-014-01, :on 860702,HPCI Turbine Steam Supply Primary Containment Inboard Isolation Valve E41-F002 Received Autoclose Signals.Caused by Failure of Resistor R1 of Temp Monitoring Module N603D.Module Replaced + (05:57:02, 8 December 2024)
- 05000414/LER-1986-027-01, :on 860627,containment Gas Monitor 2EMF39L Alarmed,Resulting in ESF Actuation That Terminated Containment Air Release.Caused by Spurious Alarm.Work Request Initiated to Resolve Alarm Problem + (05:57:04, 8 December 2024)
- TXX-4935, Interim Deficiency Rept CP-86-32 Re through-wall Embedded Conduit Sleeves Not Identified by Number & Possibly Overfilled.Initially Reported on 860421.Evaluation Continuing.Next Rept by 860919 + (05:57:06, 8 December 2024)
- ML20203G802 + (05:57:06, 8 December 2024)
- ML20203G798 + (05:57:07, 8 December 2024)
- TXX-4923, Interim Deficiency Rept CP-86-12 Re Attachments At,Or in Close Proximity To,Design Gaps Between Secondary Walls & Adjacent Walls/Floors.Initially Reported on 860227.Next Rept Expected by 860912 + (05:57:07, 8 December 2024)
- NRC-98-0022, Forwards semi-annual FFD Rept for Period from Jul-Dec 1997 + (05:57:08, 8 December 2024)
- ML20203G791 + (05:57:09, 8 December 2024)
- ML20203G787 + (05:57:10, 8 December 2024)
- ML20203G789 + (05:57:10, 8 December 2024)
- ML20203G784 + (05:57:12, 8 December 2024)
- 05000304/LER-1986-016-04, :on 860627,reactor Tripped from Approx 70% Power.Caused by Lightning Strike Which Hit One or More Containment Lightning Rods.Two New Mods Initiated to Enhance Existing Lightning Protection Sys + (05:57:14, 8 December 2024)
- ML20203G782 + (05:57:15, 8 December 2024)
- ML20203G781 + (05:57:15, 8 December 2024)
- ML20203G778 + (05:57:16, 8 December 2024)
- 05000272/LER-1986-011-01, :on 860627,continuous Fire Watch Not Maintained for Inoperable Fire Door,Contrary to Tech Specs.Caused by Personnel Error.Hourly Fire Watch Posted & Info Directive AP-25 Will Be Issued + (05:57:18, 8 December 2024)
- ML20203G771 + (05:57:19, 8 December 2024)
- ML20203G768 + (05:57:19, 8 December 2024)
- ML20203G762 + (05:57:24, 8 December 2024)
- ML20203G764 + (05:57:24, 8 December 2024)
- RC-98-0025, Informs That Plant Fulfilled Commitment as of 970630, Including Listed Elements Re Implementation of Severe Accident Mgt + (05:57:25, 8 December 2024)
- ML20203G756 + (05:57:26, 8 December 2024)
- ML20203G753 + (05:57:27, 8 December 2024)
- 05000250/LER-1986-030, :on 860627,reactor Trip & Subsequent Safety Injection Actuation Occurred,Due to Personnel Performing Sections of Operating Procedure 14004.1.Caused by Personnel Error.Affected Procedure Revised + (05:57:28, 8 December 2024)
- ML20203G749 + (05:57:32, 8 December 2024)
- TXX-4929, Interim Deficiency Rept CP-86-10 Re Defects Noted in Electrical Penetration Assemblies Supplied by Bunker Ramo. Initially Reported on 860424.Investigation & Evaluation in Progress.Next Rept Will Be Submitted by 860926 + (05:57:32, 8 December 2024)
- TXX-4924, Interim Deficiency Rept CP-86-35 Re Motor Operators for Several Valves in Main Steam Sys.Initially Reported on 860602.Complete Evaluation & Next Rept Expected by 860912 + (05:57:33, 8 December 2024)
- ML20203G742 + (05:57:34, 8 December 2024)
- ML20203G743 + (05:57:34, 8 December 2024)
- ML20203G741 + (05:57:35, 8 December 2024)
- 05000298/LER-1998-001, :on 980127,discovered That Closing SGTS Unit Crosstie Valve During Performance of Certain Surveillance Test Procedures Renders Both Trains Inoperable.Caused by Failure to Recognize.Procedures Revised + (05:57:37, 8 December 2024)
- TXX-4925, Interim Deficiency Rept CP-86-38 Re Failure of Project Procedures to Address Installation & Insp Criteria for Cable Runs Used as Device Pigtail Extensions.Initially Reported on 860527.Evaluation Underway.Next Rept by 860912 + (05:57:38, 8 December 2024)
- ML20203G734 + (05:57:39, 8 December 2024)
- TXX-4930, Interim Deficiency Rept CP-86-25 Re Concern That W/O Full Breaker/Fuse Coordination,Portions of Util Damage Study Could Be Incorrect.Initially Reported on 860410.Next Rept Expected by 860829 + (05:57:39, 8 December 2024)
- ML20203G726 + (05:57:41, 8 December 2024)
- ML20203G724 + (05:57:42, 8 December 2024)
- ML20203G725 + (05:57:42, 8 December 2024)
- ML20203G722 + (05:57:43, 8 December 2024)
- ML20203G717 + (05:57:44, 8 December 2024)
- PNO-II-93-030A, on 930726,NRC Was Notified That Nuclear Gauge Was Stolen Between 930707 & 22.NRC Inpectors Determined That Gauge Placed in Storage Bldg on 930510.Region II Will Continue to Follow Licensee Efforts to Locate Gauge + (05:57:44, 8 December 2024)
- ML20203G716 + (05:57:45, 8 December 2024)
- ML20203G714 + (05:57:46, 8 December 2024)