ML20203G771

From kanterella
Jump to navigation Jump to search
Notice of Withdrawal of Application for Amend to FOLs DPR-51 & NPF-6,respectively.Proposed Amend Would Have Extended AOT for EDG at Arkansas Nuclear One,Units 1 & 2 to 7 Days with Addl,One Per Refueling Cycle
ML20203G771
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 12/23/1998
From: Nolan M
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20203G769 List:
References
NUDOCS 9902220056
Download: ML20203G771 (2)


Text

_

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTER 6Y OPERATIONS. INC, DOCKET NOS. 50-313 AND 50-368 ARKANSAS NUCLEAR ONE. UNIT NOS.1 AND 2 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Entergy Operations, Inc. (the licensee) to withdraw its May 2,1996, application for proposed amendment to Facility Operating License Nos. DRP-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, located in Pope County, Arkansas.

The proposed amendment would have extended the allowed outage time (AOT) for the emergency diesel generator's at Arkansas Nuclear One, Units 1 and 2 to 7 days with an additional, once per refueling cycle, extension of 7 more days for each machine.

The Commission had previously issued a proposed no significant hazards consideration determination published in the FEDERAL REGISTER on May 22,1996 (61 FR 25703).

However, by i ttter dated December 11,1998, the licensee withdrew the proposed change.

For further details with respect to this action, see the application for amendment dated May 2,1996, as supplemented by letter dated November 7,1996, and the licensee's letter dated December 11,1998, which withdrew the application for the license amendment. The 9902220056 991223 PDR ADOCK 05000313 P PDR

c7, e, , ;*

e 2-above documents are available for public inspection at the Commission's Public Document Room, the Gelman Building,2120 L Street, N. W. Washington, DC, and at the Tomlinson Library, Arkansas Tech University, RusseMlle, AR 72801.

Dated at Rockville, Maryland, December 23. 1998.

FOR THE NUCLEAR REGULATORY COMMISSION W.8 b .M M. Christopher Nolan, Project Manager Project Directorate IV 1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation

'/

l a,__- ,e. mu,m --m ---*- nm.- ~

4y-y+- w-- m ,ww--