Forwards Notice of Withdrawal for Amend to Licenses DPR-51 & NPF-6,respectively.Proposed Change Would Have Extended AOT for EDG at Arkansas Nuclear One,Units 1 & 2 to 7 Days with Addl,Once Per Refueling Cycle
ML20203G764
Person / Time
Site: Arkansas Nuclear  
Issue date: 12/23/1998
From: Nolan M
NRC (Affiliation Not Assigned)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20203G769 List:
References
TAC-M95330, TAC-M95331, NUDOCS 9902220054
Download: ML20203G764 (3)


Text

-

December 23. 1998 Mr. C. Randy Hutchinson Vice President, Operations ANO

(

Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - WITHDRAWAL OF APPLICATION FOR LICENSE AMENDMENT TO FACILITY OPERATING LICENSE NOS. DRP-51 AND NPF-6 (TAC NOS. M95330 AND M95331).

Dear Mr. Hutchinson:

By "0CAN059603, Application for Amends to Licenses DPR-51 & NPF-6,revising ANO-1 TS 3.7.2 & ANO-2 [[TS" contains a listed "[" character as part of the property label and has therefore been classified as invalid. & 3.8.1.1 to Extend Allowed Outage Time for EDGs from 7 Days to Include Once Per Cycle Extension of Addl 7 Days Per Machine|letter dated May 2,1996]] (OCAN059603), as supplemented by letter dated November 7,1996 (OCAN119606), you applied for an amendment to Operating License Nos. DRP-51 and NPF-6.

The proposed change would have extended the allowed outage time (AOT) for the emergency diesel generators at Arkansas Nuclear One, Units 1 and 2 to 7 days with an additional, once per refuelir; cycle, extension of 7 more days for each machine. Subsequently, by letter dated December 11,1998 (OCAN129808), you withdrew the request. Therefore, the proposed change is considered to be withdrawn. If this information is not correct, please notify the IJC of your intended actions within 10 days of receipt of this letter.

The Commission has filed the enclosed Notice of Withdrawal of Application for Ame:idment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, Original Signed By:

M. Christopher Nolan, Project Manager Project Directorate IV-1 Division of Reactor Projects lil/lV Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368

Enclosures:

Notice of Withdrawal cc w/encts: See next page DISTRIBUTION:

Docket File PUBLIC PDIV-1 r/f C. Hawes ACRS OGC(15B18)

T. Gwynn, RIV J.Hannon C. Nolan E. Adensam (EGA1)

N. Hilton DOCUMENT NAME:G:\\ano2fina\\a2m95331.wdl To receive e copy of this document, indeste in the bar: *C* = Copy without enclosuresA*E*,= Copy with enclosures *N* = No copy OFFICE PM:PDIV-1 E

LA:PDIV-1 5

D:PDIV-1A%-

NAME CNolanH

/CRawestM JHannon' M i

DATE 12/LL /98 12/ *V>f98 12/>v/98

/C}

l OFFICIAL RECORD COPY d

m or o.3031 k'Y N"

I 99o222oos. 991223 pjgfjg PDR ADOCK O 3

L.

c uru o=

1 UNITED STATES j

]

NUCLEAR REGULATORY COMMISSION j'

WASHINGTON, D.C. 3000H001 December 23, 1998 Mr. C. Randy Hutchinson Vice President, Operations ANO Entergy Operations, Inc.

1448 S. R. 333 Russellville, AR 72801

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - WITHDRAWAL OF APPLICATION FOR LICENSE AMENDMENT TO FACILITY OPERATING LICENSE NOS. DRP-51 AND NPF-6 (TAC NOS. M95330 AND M95331).

Dear Mr. Hutchinson:

By "0CAN059603, Application for Amends to Licenses DPR-51 & NPF-6,revising ANO-1 TS 3.7.2 & ANO-2 [[TS" contains a listed "[" character as part of the property label and has therefore been classified as invalid. & 3.8.1.1 to Extend Allowed Outage Time for EDGs from 7 Days to Include Once Per Cycle Extension of Addl 7 Days Per Machine|letter dated May 2,1996]] (OCAN059603), as supplemented by letter dated November 7,1996 (OCAN119606), you applied for an amendment to Operating License Nos. DRP-51 and NPF-6.

The proposed change would have extended the allowed outage time (AOT) for the emergency diesel generators at Arkansas Nuclear One, Units 1 and 2 to 7 days with an additional, once per refueling cycle, extension of 7 more days for each machine. Subsequently, by letter dated December 11,1998 (OCAN129808), you withdrew the request. Therefore, the proposed change is considered to be withdrawn. If this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely, p,

h?

4=

M. Christopher Nolan, Project Manager Project Directorate IV-1 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368

Enclosures:

Notice of Withdrawal cc w/encis: See next page

Mr. C. Randy Hutchinson Entergy Operations, Inc.

Arkansas Nuclear One, Units 1 & 2 cc:

Executive Vice President Vice President, Operations Support

& Chief Operating Officer Entergy Operations, Inc.

Entergy Operations, Inc.

P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 Wise, Carter, Child & Caraway Director, Division of Radiation P. O. Box 651 Control and Emergency Management Jackson, MS 39205 Arkansas Department of Health 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005 3502 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident inspector U.S. Nuclear Regulatory Commission P. O. Box 310 London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County Pope County Courthouse Russellville, AR 72801