Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203N163 + (02:09:23, 8 December 2024)
- ML20203N161 + (02:09:24, 8 December 2024)
- ML20203N159 + (02:09:26, 8 December 2024)
- ML20203N158 + (02:09:27, 8 December 2024)
- ML20203N157 + (02:09:28, 8 December 2024)
- ML20203N155 + (02:09:35, 8 December 2024)
- ML20203N153 + (02:09:36, 8 December 2024)
- ML20203N151 + (02:09:37, 8 December 2024)
- ML20203N150 + (02:09:38, 8 December 2024)
- ML20203N149 + (02:09:40, 8 December 2024)
- PNO-V-86-065, on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation + (02:09:40, 8 December 2024)
- ML20203N147 + (02:09:43, 8 December 2024)
- ML20203N145 + (02:09:45, 8 December 2024)
- ML20203N144 + (02:09:46, 8 December 2024)
- ML20203N143 + (02:09:46, 8 December 2024)
- ML20203N142 + (02:09:47, 8 December 2024)
- ML20203N141 + (02:09:48, 8 December 2024)
- ML20203N138 + (02:09:49, 8 December 2024)
- ML20203N140 + (02:09:49, 8 December 2024)
- ML20203N137 + (02:09:50, 8 December 2024)
- ML20203N135 + (02:09:50, 8 December 2024)
- ML20203N134 + (02:09:51, 8 December 2024)
- ML20203N131 + (02:09:52, 8 December 2024)
- ML20203N133 + (02:09:52, 8 December 2024)
- ML20203N129 + (02:09:53, 8 December 2024)
- ML20203N127 + (02:09:56, 8 December 2024)
- ML20203N125 + (02:09:57, 8 December 2024)
- IR 05000334/1986018 + (02:10:24, 8 December 2024)
- ML20203N122 + (02:10:24, 8 December 2024)
- ML20203N120 + (02:10:25, 8 December 2024)
- ML20203N118 + (02:10:25, 8 December 2024)
- ML20203N116 + (02:10:26, 8 December 2024)
- ML20203N117 + (02:10:26, 8 December 2024)
- ML20203N115 + (02:10:27, 8 December 2024)
- ML20203N113 + (02:10:28, 8 December 2024)
- ML20203N114 + (02:10:28, 8 December 2024)
- ML20203N112 + (02:10:29, 8 December 2024)
- ML20203N110 + (02:10:30, 8 December 2024)
- ML20203N109 + (02:10:33, 8 December 2024)
- ML20203N108 + (02:10:34, 8 December 2024)
- 05000219/LER-1986-007-01, :on 860327,plant Shutdown Conducted Due to Repeatability/Drift Problems W/Reactor Low Water Level Scram Switches.Cause Unknown.Static O-ring Switches Replaced.W/ + (02:10:36, 8 December 2024)
- ML20203N105 + (02:10:37, 8 December 2024)
- ML20203N104 + (02:10:38, 8 December 2024)
- TAC:61866 + (02:10:38, 8 December 2024)
- ML20203N103 + (02:10:39, 8 December 2024)
- ST-HL-AE-1638, Responds to Potential Enforcement Actions Cited in Const Appraisal Team 851021-1101 & 1112-22 Insps & Items Mentioned in NRC & Executive Summary.Aggressive Action Taken in Areas Requiring Improvement,Per Util + (02:10:40, 8 December 2024)
- ML20203N101 + (02:10:41, 8 December 2024)
- PNO-V-86-063, on 860912,reactor Trip Occurred from Low Steam Generator Pressure When Four Channels of Steam Flow Lost. Caused by Shorting of Circuit Board.Outage Extended Past 48 H to Rebuild four-way Valve.Reactor Restarted on 860914 + (02:10:41, 8 December 2024)
- ML20203N098 + (02:10:42, 8 December 2024)
- ML20203N094 + (02:10:43, 8 December 2024)
- PNO-III-86-099, on 860917,licensee Shut Reactor Down to Permit Cleaning of Main Condenser.Condenser Tubes Became Partially Blocked by Clams/Clam Shells.Other Maint Work Also Planned.Restart Expected No Earlier than 860919 + (02:10:43, 8 December 2024)