Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203N192 + (02:08:58, 8 December 2024)
- ML20203N188 + (02:09:02, 8 December 2024)
- ML20203N187 + (02:09:04, 8 December 2024)
- ML20203N186 + (02:09:04, 8 December 2024)
- ML20203N185 + (02:09:05, 8 December 2024)
- PNO-I-86-074, on 860916,tool Box Containing Radioactive Matl Stolen from Siemens Gammasonics Field Svc Engineer Parked Automobile.Box Contained 2 Mci Am-241 Sealed Source & Two Co-57 Sources of 236 & 27 Uci.Local Police Notified + (02:09:08, 8 December 2024)
- ML20203N182 + (02:09:09, 8 December 2024)
- ML20203N179 + (02:09:10, 8 December 2024)
- ML20203N178 + (02:09:11, 8 December 2024)
- PNO-V-86-064, on 860918,licensee Declared Unusual Event Due to High Winds of 85 Mph.Svc Water Pump B out-of-svc Resulting in Emergency Diesel Generator B Being out-of-svc. Rupture in Low Pressure Fire Main Also Reported + (02:09:12, 8 December 2024)
- ML20203N176 + (02:09:13, 8 December 2024)
- ML20203N174 + (02:09:14, 8 December 2024)
- ML20203N172 + (02:09:15, 8 December 2024)
- RBG-24385, Application for Amend to License NPF-47,revising Tech Spec Table 3.3.2-2, Isolation Actuation Instrumentation Setpoints, by Changing to Four Setpoints Instead of One + (02:09:15, 8 December 2024)
- ML20203N171 + (02:09:16, 8 December 2024)
- ML20203N170 + (02:09:17, 8 December 2024)
- ML20203N167 + (02:09:18, 8 December 2024)
- TXX-5017, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 860806.Evaluation Continuing.Next Rept Expected by 861003 + (02:09:18, 8 December 2024)
- ML20203N166 + (02:09:19, 8 December 2024)
- ML20203N165 + (02:09:20, 8 December 2024)
- ML20203N164 + (02:09:22, 8 December 2024)
- ML20203N163 + (02:09:23, 8 December 2024)
- ML20203N161 + (02:09:24, 8 December 2024)
- ML20203N159 + (02:09:26, 8 December 2024)
- ML20203N158 + (02:09:27, 8 December 2024)
- ML20203N157 + (02:09:28, 8 December 2024)
- ML20203N155 + (02:09:35, 8 December 2024)
- ML20203N153 + (02:09:36, 8 December 2024)
- ML20203N151 + (02:09:37, 8 December 2024)
- ML20203N150 + (02:09:38, 8 December 2024)
- ML20203N149 + (02:09:40, 8 December 2024)
- PNO-V-86-065, on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation + (02:09:40, 8 December 2024)
- ML20203N147 + (02:09:43, 8 December 2024)
- ML20203N145 + (02:09:45, 8 December 2024)
- ML20203N144 + (02:09:46, 8 December 2024)
- ML20203N143 + (02:09:46, 8 December 2024)
- ML20203N142 + (02:09:47, 8 December 2024)
- ML20203N141 + (02:09:48, 8 December 2024)
- ML20203N138 + (02:09:49, 8 December 2024)
- ML20203N140 + (02:09:49, 8 December 2024)
- ML20203N137 + (02:09:50, 8 December 2024)
- ML20203N135 + (02:09:50, 8 December 2024)
- ML20203N134 + (02:09:51, 8 December 2024)
- ML20203N131 + (02:09:52, 8 December 2024)
- ML20203N133 + (02:09:52, 8 December 2024)
- ML20203N129 + (02:09:53, 8 December 2024)
- ML20203N127 + (02:09:56, 8 December 2024)
- ML20203N125 + (02:09:57, 8 December 2024)
- IR 05000334/1986018 + (02:10:24, 8 December 2024)
- ML20203N122 + (02:10:24, 8 December 2024)
- ML20203N120 + (02:10:25, 8 December 2024)