Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A011 + (17:52:36, 7 January 2025)
- ML17340A010 + (17:52:37, 7 January 2025)
- ML17340A009 + (17:52:39, 7 January 2025)
- ML17340A004 + (17:52:40, 7 January 2025)
- ML17340A003 + (17:52:41, 7 January 2025)
- ML17340A002 + (17:52:42, 7 January 2025)
- ML17339B228 + (17:52:43, 7 January 2025)
- IR 05000250/1980022 + (17:52:44, 7 January 2025)
- ML17339B225 + (17:52:46, 7 January 2025)
- ML17339B223 + (17:52:47, 7 January 2025)
- ML17339B222 + (17:52:47, 7 January 2025)
- L-80-220, Advises That Final Response to IE Bulletin 80-10 Will Be Submitted by 800801 + (17:52:49, 7 January 2025)
- ML17339B221 + (17:52:49, 7 January 2025)
- L-80-229, Responds to Requesting Info on Auxiliary Feedwater Sys.Attachment 2 Provides Addl Info to Suppl 791220 Response + (17:52:51, 7 January 2025)
- ML17339B217 + (17:52:53, 7 January 2025)
- ML17339B218 + (17:52:53, 7 January 2025)
- L-80-231, Forwards Responses to Questions Re Proposed Installation of Condensate Polishing Demineralizers.Responses Suppl Info Previously Submitted in 800318 & 0527 Ltrs.Oversize Drawings Encl + (17:52:54, 7 January 2025)
- L-80-218, Responds to IE Bulletin 80-11, Masonry Wall Design. Rept Not Complete But safety-related Walls Have Been Identified & re-evaluation Program Developed.Rept Will Be Submitted by 800723 + (17:52:56, 7 January 2025)
- IR 05000250/1980016 + (17:52:58, 7 January 2025)
- ML17339B203 + (17:53:00, 7 January 2025)
- ML17339B202 + (17:53:01, 7 January 2025)
- L-80-202, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-16 & 50-251/80-14.Corrective Actions:Tracked Open Noncompliance Items & Hired Addl QC Personnel + (17:53:02, 7 January 2025)
- ML17339B201 + (17:53:02, 7 January 2025)
- ML17339B197 + (17:53:05, 7 January 2025)
- ML17339B198 + (17:53:05, 7 January 2025)
- ML17339B195 + (17:53:06, 7 January 2025)
- L-78-285, Forwards Semiannual Radioactive Effluent & Environ Monitoring Repts for Jan-June 1978.W/o Environ Monitoring Rept + (17:53:07, 7 January 2025)
- ML17339B194 + (17:53:07, 7 January 2025)
- L-80-226, Forwards Facility Evacuation Time Estimates in Response to NRC 791129 Request + (17:53:09, 7 January 2025)
- ML17339B190 + (17:53:11, 7 January 2025)
- ML17339B188 + (17:53:11, 7 January 2025)
- 05000250/LER-1980-014-01, /01T-0:on 800626,AE Advised That Insp/Evaluation in Progress Per IE Bulletin 79-14,revealed Deficiency Involving Auxiliary Feedwater Sys Pump Suction Piping.Cause Not Stated + (17:53:13, 7 January 2025)
- 05000250/LER-1980-014, Forwards LER 80-014/01T-0 + (17:53:14, 7 January 2025)
- L-80-223, Advises That Henry Pratt Co Torque & Stress Analyses Re Containment Purge Have Been Delayed.Upon Completion & Receipt of Analyses,Util Will Review & Prepare Response Demonstrating Valve Ability to Close During DBA-LOCA + (17:53:15, 7 January 2025)
- ML17339B181 + (17:53:18, 7 January 2025)
- ML17339B183 + (17:53:18, 7 January 2025)
- ML17339B180 + (17:53:20, 7 January 2025)
- ML17339B177 + (17:53:21, 7 January 2025)
- L-80-210, Forwards Two Vol Phase II Response to IE Bulletin 79-01B Re Environ Qualification of Class IE Equipment.Supersedes 800602 Phase I Response.W/O Encl + (17:53:22, 7 January 2025)
- ML17339B171 + (17:53:24, 7 January 2025)
- L-80-217, Advises That Addl Info Re Inservice Insp Will Be Submitted by 800915 Per NRC 800414 Request + (17:53:28, 7 January 2025)
- ML17339B169 + (17:53:33, 7 January 2025)
- ML17339B168 + (17:53:34, 7 January 2025)
- L-80-211, Notifies That Commitment Date for Completion of Plant Parameter Display in Interim Technical Support Ctr Is Revised to 800831 + (17:53:35, 7 January 2025)
- L-80-213, Advises That Westinghouse Submittal of WCAP-9748 & WCAP-9749 Completes Phase C Asymmetric LOCA Loads Analysis. WCAP-9558 & WCAP-9570 Provide Addl Info Requested at 800226 Meeting + (17:53:36, 7 January 2025)
- IR 05000251/1980016 + (17:53:38, 7 January 2025)
- L-80-199, Forwards Response to IE Bulletin 80-06, Engineered Safety Features (ESF) Reset Controls. Lists Equipment Which Does Not Remain in Emergency Mode Upon Reset of ESF Signal. Followup Response Will Be Sent by 800801 + (17:53:40, 7 January 2025)
- ML17339B163 + (17:53:40, 7 January 2025)
- L-80-206, Requests Permission to Delay Scheduled Shutdown for Steam Generator Insp Until 801006.Delay Needed to Accomodate Peak Load Demand for Jul-Aug 1980.Updated Generating Capacity, Expected Load Demand Info & Class III Fee Encl + (17:53:42, 7 January 2025)
- ML17339B159 + (17:53:44, 7 January 2025)
- ML17339B158 + (17:53:45, 7 January 2025)
- ML17339B155 + (17:53:46, 7 January 2025)