Forwards IE Insp Repts 50-250/80-16 & 50-251/80-14 on 800401-30 & Notices of Violation & Deviation
ML17339B201
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/29/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17339B199 List:
References
NUDOCS 8007240266
Download: ML17339B201 (4)


See also: IR 05000250/1980016

Text

~S RKOIr

I

"o

OO

I

~II

4'

~O

++*++

In Reply Refer To:

RII:RVL

50-250/80-16

50-251/80-14

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

105 MARIETTAST., N,W., SUITE 3100

ATLANTA,GEORGIA 30303

MAY 2

9 1980

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. O. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the

inspection

conducted

by R. Vogt-Lowell of this office on

April 1 through 30,

1980 of activities authorized by NRC Operating License Nos.

DPR-31

and

DPR-41 for the Turkey Point facility, and to the discussion of our

findings held with H. E. Yeager at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

We have

examined

actions

you have .taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

One

new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

l-

During the inspection, it was

found that certain activities under your license

appear

to be in noncompliance

with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section

2.201 requires

you to submit to this office, within 20 days 'of

your receipt of this notice,

a written statement or explanation in reply including:

(1) corrective steps

which have been taken by you and the results

achieved;

(2)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the

date when full compliance willbe achieved.

During the inspection it was

found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

This item is identified in the Notice of Deviation enclosed herewith as Appendix B.

Please

provide us in writing within 20 days of your receipt of this letter your

comments including a description of corrective actions that have been or will be

taken,

corrective actions

which will be taken to avoid further deviations,

and

the date corrective actions were or willbe completed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

800V2402&'(p

I

e

0

Florida Power and Light Company

MAYS 9 1980

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in

a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

E:c.

R.

C. L wis, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-250/80-16

and 50-251/80-14

cc w/encl:

H. E. Yaeger,

Plant Manager

P. 0.

Box 013100

Miami, FL

33101