~S RKOIr
I
"o
OO
I
~II
4'
~O
++*++
In Reply Refer To:
RII:RVL
50-250/80-16
50-251/80-14
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
105 MARIETTAST., N,W., SUITE 3100
ATLANTA,GEORGIA 30303
MAY 2
9 1980
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. O. Box 529100
Miami, FL
33152
Gentlemen:
This refers
to the
inspection
conducted
by R. Vogt-Lowell of this office on
April 1 through 30,
1980 of activities authorized by NRC Operating License Nos.
and
DPR-41 for the Turkey Point facility, and to the discussion of our
findings held with H. E. Yeager at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
We have
examined
actions
you have .taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
One
new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item will be examined during subsequent
inspections.
l-
During the inspection, it was
found that certain activities under your license
appear
to be in noncompliance
with NRC requirements.
This item and references
to pertinent requirements
are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions.
Section
2.201 requires
you to submit to this office, within 20 days 'of
your receipt of this notice,
a written statement or explanation in reply including:
(1) corrective steps
which have been taken by you and the results
achieved;
(2)
corrective steps
which will be taken to avoid further noncompliance;
and (3) the
date when full compliance willbe achieved.
During the inspection it was
found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix B.
Please
provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken,
corrective actions
which will be taken to avoid further deviations,
and
the date corrective actions were or willbe completed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
800V2402&'(p
I
e
0
Florida Power and Light Company
MAYS 9 1980
necessary
that you make
a written application within 20 days to this office to
withhold such
information from public disclosure.
Any such application
must
include
a full statement
of the reasons
on the basis of which it is claimed that
the information is proprietary,
and should be prepared
so that proprietary infor-
mation identified in the application is contained in
a separate
part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
E:c.
R.
C. L wis, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-250/80-16
and 50-251/80-14
cc w/encl:
H. E. Yaeger,
Plant Manager
P. 0.
Box 013100
Miami, FL
33101
4