Forards IE Insp Rept 50-251/80-16 on 800515-16. No Noncompliance Noted
ML17339B163
Person / Time
Site: Turkey Point 
Issue date: 05/29/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17339B164 List:
References
NUDOCS 8007100055
Download: ML17339B163 (4)


See also: IR 05000251/1980016

Text

~llRfoy

P

~4

0

Oj

Cl

C

O

I

o

o~

++**+

In Reply Refer To:

RII:BRC

50"251/80-16

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

MAY 28 880

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers

to the inspection

conducted

by B.

R.

Crowley of this office on

May 15 through

16,

1980 of activities authorized

by

NRC Operating

License No.

DPR-41 for the Turkey Point facility, and to the discussion of our findings held

with J.

K. Hayes at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Title

10,

Code of Federal Regulations,

a copy of thxs letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application must

include

a full statem'ent of the reasons

on the basis of which it is claimed that

the

information is proprietary,

and

should

be prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room,

t

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murph ,

Ch ef

Reactor Constructio

Support Branch

nd Engineering

l

Enclosure:

Inspection Report No. 50-251/80-16

cc wgencl:

See

Page

2

I

Florida Power and Light Company

cc w/encl:

H. E. Yaeger, Plant Manager

P. 0. Box 013100

Miami, FL

33101

0