Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-461, Forwards Check in Payment of Proposed License Amend Turbine Runback Sys, Representing Class I & Class III Amend + (17:19:22, 7 January 2025)
- ML17341B447 + (17:19:27, 7 January 2025)
- L-82-456, Forwards Revised Pump & Valve Inservice Test Program for Unit 3,applicable for 821214 to 921214.Revised Inservice Test Program for Unit 4 Will Be Submitted by 830307 + (17:19:28, 7 January 2025)
- ML17341B444 + (17:19:30, 7 January 2025)
- ML17341B442 + (17:19:35, 7 January 2025)
- L-82-452, Forwards Revision 1 to 10CFR50 App R Fire Protection Review. Revision Corrects Typographical Errors in 820701 Submittal + (17:19:39, 7 January 2025)
- ML17341B440 + (17:19:39, 7 January 2025)
- L-82-451, Forwards Util Containing Payment of License Amend Fee Re Redundancy in RHR Sys Requested in NRC + (17:19:41, 7 January 2025)
- L-82-445, Advises That Procedures/Plans Submitted for Unit 3 for Steam Generator Repair Project Apply to Unit 4 & Need Not Be Resubmitted + (17:19:43, 7 January 2025)
- L-82-437, Forwards Payment of Proposed License Amend Fee Re Redundancy in RHR Sys + (17:19:44, 7 January 2025)
- L-82-438, Extends Invitation to Observe 821019 Demonstration of Emergency Response Sys at Technology for Energy Corp,Knoxville,Tn + (17:19:51, 7 January 2025)
- L-82-436, Advises That Util Review of Current Nuclear Plant Staff Working Hours Indicates That Overtime Restrictions Meet Intent of Revised NRC Policy.Requirements Incorporated in Administrative Procedures & Need Not Be Added to Tech Specs + (17:20:03, 7 January 2025)
- L-82-412, Forwards Public Version of Emergency Plan Implementing Procedures 20104, Emergency Roster, 20101, Duties of Emergency Coordinator, 20107, Fire/Explosion Emergencies & 20127 Duties of Assembly Area Supervisor + (17:20:07, 7 January 2025)
- ML17341B422 + (17:20:11, 7 January 2025)
- ML17341B419 + (17:20:14, 7 January 2025)
- ML17341B418 + (17:20:15, 7 January 2025)
- L-82-435, Revised Application for Amends 87 & 81 to Licenses DPR-31 & DPR-41,respectively,correcting Typographical Errors Re DHR Sys + (17:20:16, 7 January 2025)
- ML17341B415 + (17:20:21, 7 January 2025)
- 05000250/LER-1982-012, Forwards LER 82-012/01T-0 + (17:20:25, 7 January 2025)
- ML17341B411 + (17:20:27, 7 January 2025)
- L-82-423, Forwards Revised Schedule for Providing Final Response Re Control of Heavy Loads on Guideline 4 (Special Lifting Devices) & Guideline 7 (Crane Design).Only Manufacturers Can Obtain Requested Info + (17:20:28, 7 January 2025)
- ML17341B403 + (17:20:32, 7 January 2025)
- L-82-413, Forwards Response to NRC Requesting Addl Info Re Environ Qualification of TMI Action Items Contained in NUREG-0737 + (17:20:33, 7 January 2025)
- ML17341B400 + (17:20:34, 7 January 2025)
- L-82-407, Forwards Response to Request for Addl Info Re Purge & Vent Valve Operability + (17:20:35, 7 January 2025)
- L-82-361, Forwards Public Version of Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20105 Re Onsite Support Ctrs & 20106 Re Natural Emergencies + (17:20:39, 7 January 2025)
- ML17341B379 + (17:20:44, 7 January 2025)
- L-82-388, Forwards Final Response to NUREG-0737,Item II.D.1 Re PWR Relief & Safety Valve Testing.Evaluations of Pressurizer Safety Valves & Pressurizer Safety & Relief Piping Encl + (17:20:45, 7 January 2025)
- L-82-389, Forwards Responses to Questions Re Adequacy of Station Electric Distribution Sys Voltages,Per 820809 Telcon. Explanation of Compliance W/General Design Criteria 17 Encl + (17:20:49, 7 January 2025)
- ML17341B376 + (17:20:50, 7 January 2025)
- L-82-405, Forwards Inservice Insp Rept Per 820422 Commitment.Rept Consists of Class 1 & 2 Summary Exam Tables for Third Period of Program + (17:20:51, 7 January 2025)
- ML17341B373 + (17:20:56, 7 January 2025)
- ML17341B372 + (17:20:57, 7 January 2025)
- L-82-403, Application to Amend Licenses DPR-31 & DPR-41,revising App a to Radiological Effluent Tech Specs Per NUREG-0472.Offsite Dose Calculation Manual for Gaseous & Liquid Effluents Forwarded + (17:21:01, 7 January 2025)
- ML17341B364 + (17:21:07, 7 January 2025)
- L-82-398, Requests That Last Sentence in Final Paragraph of 820810 Proposed Mod to Turbine Runback Sys Be Replaced W/Listed Sentence + (17:21:09, 7 January 2025)
- L-82-382, Forwards Comparison of Design Basis Max Fast Neutron Flux W/Actual Eight Cycle Average Flux Distribution at Reactor Pressure Vessel Inner Radius.Suppls 820503 Response to 820316 Request for Addl Info + (17:21:11, 7 January 2025)
- ML17341B361 + (17:21:16, 7 January 2025)
- ML17341B360 + (17:21:17, 7 January 2025)
- ML17341B359 + (17:21:18, 7 January 2025)
- ML17341B348 + (17:21:20, 7 January 2025)
- ML17341B357 + (17:21:20, 7 January 2025)
- L-82-342, Application for Amend of Licenses DPR-31 & DPR-41,changing Tech Specs 6.5.2.3,6.5.2.4,6.5.2.5,6.5.2.6 & Figure 6.2-1 to Update Offsite Organization + (17:21:21, 7 January 2025)
- L-82-349, Advises That Final Heat Tracing Components Necessary for Completion of Containment Hydrogen Monitor,Per NUREG-0737, Item II.F.1.6,received from Manufacturer on 820801.Estimated Completion of Installation Rescheduled Until 820930 + (17:21:23, 7 January 2025)
- L-82-347, Advises That NUREG-0737,Item II.D.1.B, PWR Relief & Safety Valve Testing Is Satisfied by Submittal of PORV Block Valve Info Package & Listed Info + (17:21:27, 7 January 2025)
- ML17341B343 + (17:21:36, 7 January 2025)
- ML17341B342 + (17:21:40, 7 January 2025)
- ML17341B341 + (17:21:41, 7 January 2025)
- ML17341B336 + (17:21:45, 7 January 2025)
- ML17341B335 + (17:21:49, 7 January 2025)
- L-82-343, Proposes Mod to Turbine Runback Sys,Deleting Flux Rate Input.Sys Prone to Spurious Runbacks Due to Single Failure of Electrical Component.Encl Safety Evaluation Discusses Consequences of Single Dropped Rod Control Cluster Assembly + (17:21:53, 7 January 2025)