Docket Nos, 50-250=
PP'c'1 LICENSEE:
Florida Power and Light Company (FPL)
FACILITIES: Turkey Point Plant Unit'op.
3 ay~ 4
SUMMARY
OF EXIT INTERVIEW FOLLOWING THE AUDIT OF PRESSURIZED THERMAL SHOCK (PTS)
IN-PLANT TRAINING PROGRAMS AND OPERATING PROCEDURES ON JULY 13~15, 1982 Back round On April 26, 1982 a letter was sent to PPL notifying them that we would conduct an audit of the procedures and training with regard to PTS at the Turkey Point facilities.
The Robinson 2 audit report was enclosed for guidance.
In addition the agenda (attachment 1)IH@s sent to FPL.
FPL sent dertain applicable proce-dures to Pacific Northwest, Laboratory (PNL) (the. contractor) for review prior to the audit.
The attendance at the extt interview is given in attachment 2.
Meetin Summar Les Defferding (PNL) summarized the results of the audit.
He indicated that the procedures received for advanced study were evidence that FPL was well prepared.
The audit substantiated this belief.
No Negative findings resulted from the auQit.
Some minor details were cleared up at the exit interview.
The PNL audit group will issue a report early in August with details of the audit.
Enclosures:
As stated cc w/enclosures:
See next page Marshall Grotenhuis, Project IIanager Operating Reactors Branch 81 Division of Licensing 8210120621 820915
'PDR ADOCK 05000250
< P PDR
~ e OFFICE/
SURNAME1 DATE$
ORBA'1:DL MGrotenhuis 09/['I/82:ds 8 Pl!:
~ ~
r 0
82 NRC FORM 318 (10-80) NRCM 0240.
OFFICIAL RECORD COPY USO PO: 1991-335-990
igi 0
C o',
~
t
~
r<
MEETING
SUMMARY
DISTRIBUTION OPERATING REACTORS BRANCH NO.
1 Docket/Central'ile NRC'DR.'ocal PDR ORBPl Rdg J. Heltemes, AEOD B. Grimes (Emergency Preparedness)
S.
Varga Project Manager OELD.
&E-1'CRS-10 NRC Participants cc: Licensee w/short cc list
'G..Vissing R.
Wood L. Lois
i5 0
t Robert E. Uhrig Florida Power and Light Company cc:
Harold. F. Reis, Esquire Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut Avenue, N.M.
Suite 1214 Mashington, D. C.
20036
'Environmental and Urban, Affairs Library Florida International University Miami, Florida 33199 Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Fl'orida,33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P'. 0.
Box 013100 Miami, Florida 33101.
Mr; Jack Shreve Office of the Public Counsel Room 4, Holland 'Bu'ilding Tal 1 ahassee, Fl ori da 32304 Administrator Department, of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road:
Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U.
S'. Nucl'ear Regu'latory Commission Post Office Box 1207 Homestead, Florida 33030 James P. O'Reilly Regional Administrator -.Region II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303
C J
ENCLOSURE 1
Tentative Agenda PTS Review
- Tuesda, Jul 13, 1982 MORNING Entrance interview with plant management to outline purpose of visit.
Meet with training staff to review PTS training outline, and review PTS training program.
AFTERNOON Review Procedures.
Review plant's operating history of thermal transients and PTS precursors.
Schedule interviews with operations personnel; Minimum of 2 RO's, 2 SRO's (one of which is a shift supervisor),
and 2 STA's.
Tour control room.
Mednesda
, Jul 14, 1982
,Interview operators personnel.
Complete review of procedures.
Discuss questions on procedures, Discuss thermal transients.
Thur sda, Jul 15, 1982 MORNING Complete operations interviews (i'f needed).
Meet with Project Manager, Resident Inspector, and a member of plant staff, to summarize review for exit interview.
AFTERNOON Exit interyiew.
0 ENCLOSURE 2 PTS -'XIT INTERVIBI NAME Shannon Crowel 1ou Bender H. E. Yaeger D.
14.
Haase.
John D. Smith Leo J. 'Defferding Vito A. Kaminskas Marshall Grotenhuis R. A. Kaminsky S.
M. Feith Don; Grandage.
Bill Miller V. B. Mager D.
W. Jones
'ORGANIZATION Battelle Northwest NRC/NRR/DHFS Site Manager Acting Plant Manager -
N PNL
'NL Acting Ops. Supt. -
N NRC/NRR/PM FPL, - Nuclear Licensing FPL - gA. Operations Supv.
FPL - Techni.cal~ Dept<;"Engr.'.
FPL - Nuclear Training Dept.
I E4
'I 0
r