TABLE 4.1-2 (SHEET 2 OF 3)
MINIMUM,FREQUENCIES FOR EQUIPMENT AND SAMPLING TESTS 11.
Reactor Coolant System Leakage Evaluate Daily 12.
Diesel Fuel Supply 13.
Spent Fuel Pit 14.
Secondary Coolant'5.
Vent Gas 8 Particulates Fuel inventory Weekly 10 I-131 Concentration Weekly*+
& Particulate Weekly+
,Activity 10 10 Boron Concentration Prior to refueling NA 16.
Fire Protection Pump 5
Power Supply 17.
Turbine Stop and Control
- Valves, Reheater Stop and Intercept Valves 18.
LP Turbine Rotor Inspector (w/o rotor disassembly) 19.
Spent Fuel Cask Crane Interlocks Operable Closure V,MT,PT Functioning Monthly Monthly***
Every 5 Years Within 7 days 45 6 Years 7 days when crane ss being used to maneuver spent fuel cask 8210150413 821011 FDR RDOCK 05000250 P
PDR Amendments 87 5 81
igt 0
<<5 4.
ONE residual heat removal pump may be out of
- service, provided the pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
In addition the other residual heat removal pump shall be tested to demonstrate operability prior to initiating maintenance of the inoperable pump.'"
3.4-2 b