Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-460, Forwards Class I & III Fees for Proposed License Amend Re Radiological Effluent Tech Specs + (17:19:17, 7 January 2025)
- L-82-461, Forwards Check in Payment of Proposed License Amend Turbine Runback Sys, Representing Class I & Class III Amend + (17:19:22, 7 January 2025)
- ML17341B447 + (17:19:27, 7 January 2025)
- L-82-456, Forwards Revised Pump & Valve Inservice Test Program for Unit 3,applicable for 821214 to 921214.Revised Inservice Test Program for Unit 4 Will Be Submitted by 830307 + (17:19:28, 7 January 2025)
- ML17341B444 + (17:19:30, 7 January 2025)
- ML17341B442 + (17:19:35, 7 January 2025)
- L-82-452, Forwards Revision 1 to 10CFR50 App R Fire Protection Review. Revision Corrects Typographical Errors in 820701 Submittal + (17:19:39, 7 January 2025)
- ML17341B440 + (17:19:39, 7 January 2025)
- L-82-451, Forwards Util Containing Payment of License Amend Fee Re Redundancy in RHR Sys Requested in NRC + (17:19:41, 7 January 2025)
- L-82-445, Advises That Procedures/Plans Submitted for Unit 3 for Steam Generator Repair Project Apply to Unit 4 & Need Not Be Resubmitted + (17:19:43, 7 January 2025)
- L-82-437, Forwards Payment of Proposed License Amend Fee Re Redundancy in RHR Sys + (17:19:44, 7 January 2025)
- L-82-438, Extends Invitation to Observe 821019 Demonstration of Emergency Response Sys at Technology for Energy Corp,Knoxville,Tn + (17:19:51, 7 January 2025)
- L-82-436, Advises That Util Review of Current Nuclear Plant Staff Working Hours Indicates That Overtime Restrictions Meet Intent of Revised NRC Policy.Requirements Incorporated in Administrative Procedures & Need Not Be Added to Tech Specs + (17:20:03, 7 January 2025)
- L-82-412, Forwards Public Version of Emergency Plan Implementing Procedures 20104, Emergency Roster, 20101, Duties of Emergency Coordinator, 20107, Fire/Explosion Emergencies & 20127 Duties of Assembly Area Supervisor + (17:20:07, 7 January 2025)
- ML17341B422 + (17:20:11, 7 January 2025)
- ML17341B419 + (17:20:14, 7 January 2025)
- ML17341B418 + (17:20:15, 7 January 2025)
- L-82-435, Revised Application for Amends 87 & 81 to Licenses DPR-31 & DPR-41,respectively,correcting Typographical Errors Re DHR Sys + (17:20:16, 7 January 2025)
- ML17341B415 + (17:20:21, 7 January 2025)
- 05000250/LER-1982-012, Forwards LER 82-012/01T-0 + (17:20:25, 7 January 2025)
- ML17341B411 + (17:20:27, 7 January 2025)
- L-82-423, Forwards Revised Schedule for Providing Final Response Re Control of Heavy Loads on Guideline 4 (Special Lifting Devices) & Guideline 7 (Crane Design).Only Manufacturers Can Obtain Requested Info + (17:20:28, 7 January 2025)
- ML17341B403 + (17:20:32, 7 January 2025)
- L-82-413, Forwards Response to NRC Requesting Addl Info Re Environ Qualification of TMI Action Items Contained in NUREG-0737 + (17:20:33, 7 January 2025)
- ML17341B400 + (17:20:34, 7 January 2025)
- L-82-407, Forwards Response to Request for Addl Info Re Purge & Vent Valve Operability + (17:20:35, 7 January 2025)
- L-82-361, Forwards Public Version of Emergency Plan Implementing Procedures,Including Procedures 20101 Re Duties of Emergency coordinator,20105 Re Onsite Support Ctrs & 20106 Re Natural Emergencies + (17:20:39, 7 January 2025)
- ML17341B379 + (17:20:44, 7 January 2025)
- L-82-388, Forwards Final Response to NUREG-0737,Item II.D.1 Re PWR Relief & Safety Valve Testing.Evaluations of Pressurizer Safety Valves & Pressurizer Safety & Relief Piping Encl + (17:20:45, 7 January 2025)
- L-82-389, Forwards Responses to Questions Re Adequacy of Station Electric Distribution Sys Voltages,Per 820809 Telcon. Explanation of Compliance W/General Design Criteria 17 Encl + (17:20:49, 7 January 2025)
- ML17341B376 + (17:20:50, 7 January 2025)
- L-82-405, Forwards Inservice Insp Rept Per 820422 Commitment.Rept Consists of Class 1 & 2 Summary Exam Tables for Third Period of Program + (17:20:51, 7 January 2025)
- ML17341B373 + (17:20:56, 7 January 2025)
- ML17341B372 + (17:20:57, 7 January 2025)
- L-82-403, Application to Amend Licenses DPR-31 & DPR-41,revising App a to Radiological Effluent Tech Specs Per NUREG-0472.Offsite Dose Calculation Manual for Gaseous & Liquid Effluents Forwarded + (17:21:01, 7 January 2025)
- ML17341B364 + (17:21:07, 7 January 2025)
- L-82-398, Requests That Last Sentence in Final Paragraph of 820810 Proposed Mod to Turbine Runback Sys Be Replaced W/Listed Sentence + (17:21:09, 7 January 2025)
- L-82-382, Forwards Comparison of Design Basis Max Fast Neutron Flux W/Actual Eight Cycle Average Flux Distribution at Reactor Pressure Vessel Inner Radius.Suppls 820503 Response to 820316 Request for Addl Info + (17:21:11, 7 January 2025)
- ML17341B361 + (17:21:16, 7 January 2025)
- ML17341B360 + (17:21:17, 7 January 2025)
- ML17341B359 + (17:21:18, 7 January 2025)
- ML17341B348 + (17:21:20, 7 January 2025)
- ML17341B357 + (17:21:20, 7 January 2025)
- L-82-342, Application for Amend of Licenses DPR-31 & DPR-41,changing Tech Specs 6.5.2.3,6.5.2.4,6.5.2.5,6.5.2.6 & Figure 6.2-1 to Update Offsite Organization + (17:21:21, 7 January 2025)
- L-82-349, Advises That Final Heat Tracing Components Necessary for Completion of Containment Hydrogen Monitor,Per NUREG-0737, Item II.F.1.6,received from Manufacturer on 820801.Estimated Completion of Installation Rescheduled Until 820930 + (17:21:23, 7 January 2025)
- L-82-347, Advises That NUREG-0737,Item II.D.1.B, PWR Relief & Safety Valve Testing Is Satisfied by Submittal of PORV Block Valve Info Package & Listed Info + (17:21:27, 7 January 2025)
- ML17341B343 + (17:21:36, 7 January 2025)
- ML17341B342 + (17:21:40, 7 January 2025)
- ML17341B341 + (17:21:41, 7 January 2025)
- ML17341B336 + (17:21:45, 7 January 2025)
- ML17341B335 + (17:21:49, 7 January 2025)