Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17342A237 + (17:13:11, 7 January 2025)
- L-85-389, Forwards 1985 Inservice Insp Summary Rept for Turkey Point Nuclear Power Plant Unit 3, Per ASME Code.Owner Data Rept of Repairs or Replacement & Data Rept for Eddy Current Exam Results Included + (17:13:12, 7 January 2025)
- L-85-346, Withdraws Part of 840402 Application for Amends to Licenses DPR-31 & DPR-41,dealing W/Operability/Surveillance Requirements Referencing Inservice Test Programs.Revised Pages Encl + (17:13:14, 7 January 2025)
- L-85-393, Advises of Need to Evaluate NRC SER Impact Re Westinghouse Owners Group ATWS Mitigating Sys Actuation Circuitry Generic Design Program to Determine Best Logic.Implementation Schedule Will Be Submitted 90 Days After SER Issuance + (17:13:16, 7 January 2025)
- L-85-381, Advises That Response to Generic Ltr 85-12 Re Implementation of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps & Safety Evaluation Will Be Provided by 851220 + (17:13:18, 7 January 2025)
- ML17342A218 + (17:13:20, 7 January 2025)
- L-85-364, Forwards Addl Response to Generic Ltr 83-28,Item 1.2 Re post-trip Review,Data & Info Capability,Per 850815 Telcon & NRC 850719 Draft Technical Evaluation Rept.Reliability of Digital Data Processing Sys Also Discussed + (17:13:21, 7 January 2025)
- ML17342A211 + (17:13:23, 7 January 2025)
- L-85-368, Forwards Reactor Containment Bldg Integrated Leak Rate Test,Types A,B & C Periodic Test, Per 10CFR50 App J + (17:13:24, 7 January 2025)
- L-85-361, Forwards Revised Rev 8 to Fpltqar 1-76A, Topical QA Rept + (17:13:26, 7 January 2025)
- ML17342A206 + (17:13:26, 7 January 2025)
- L-85-353, Responds to Violations Noted in Insp Repts 50-250/85-22 & 50-251/85-22.Corrective Actions:Administrative Procedures & Electrical Dept Guidelines Revised to Provide Detailed Instructions & Increased Use of Supervisory Hold Points + (17:13:28, 7 January 2025)
- ML17342A201 + (17:13:30, 7 January 2025)
- L-85-363, Requests Deferral of 1-wk Maint & Surveillance Insps Until After Unit 4 Refueling Outage,Scheduled to Begin in Jan 1986.Deferral Necessary Due to Other Insps Scheduled & Impact Insps May Have on Key Plant Personnel + (17:13:31, 7 January 2025)
- L-85-338, Semiannual Radioactive Effluent Release Rept,Jan-June 1985 + (17:13:33, 7 January 2025)
- IR 05000515/2006005 + (17:13:35, 7 January 2025)
- ML17342A194 + (17:13:37, 7 January 2025)
- ML17342A192 + (17:13:41, 7 January 2025)
- IR 05000708/2008019 + (17:13:43, 7 January 2025)
- ML17342A189 + (17:13:44, 7 January 2025)
- L-85-342, Responds to Violations Noted in Insp Repts 50-250/85-24 & 50-251/85-24.Corrective Actions:Operating Procedures 0205.1 & 0205.2 Revised & Rod Drop Times for Shutdown Bank a Recalculated + (17:13:45, 7 January 2025)
- L-85-327, Responds to Violations Noted in Insp Repts 50-250/85-13 & 50-251/85-13.Corrective Actions:Requirement Will Be Added to Maint Procedure (MP)1407.7 for Reactor Vessel Stud Detensioning & Removal + (17:13:47, 7 January 2025)
- TAC:56177 + (17:13:49, 7 January 2025)
- L-85-348, Informs That 851025 Deadline for Submittal of Dcrdr Supplemental Summary Rept Will Not Be Met Due to Delayed Work on Task Analysis.Rept Will Be Submitted by 860331,as Agreed Upon During 850801 Meeting W/Nrc + (17:13:50, 7 January 2025)
- L-85-345, Notifies That Response to 850719 Request for Addl Info Re NUREG-0737,Item II.D.1, Performance Testing of Relief & Safety Valves, Will Be Submitted by 860530 + (17:13:51, 7 January 2025)
- L-85-351, Forwards Application Fee for NRC Review of 850520 Rev to Inservice Test Program for Pumps & Valves,Per 850903 Request + (17:13:56, 7 January 2025)
- ML17342A179 + (17:13:58, 7 January 2025)
- IR 05000250/1985027 + (17:14:01, 7 January 2025)
- ML17342A174 + (17:14:02, 7 January 2025)
- ML17342A173 + (17:14:04, 7 January 2025)
- IR 05000610/2007008 + (17:14:06, 7 January 2025)
- ML17342A170 + (17:14:07, 7 January 2025)
- ML17342A169 + (17:14:08, 7 January 2025)
- L-85-298, Responds to Violations Noted in Insp Repts 50-250/85-20 & 50-251/85-20.Corrective Actions:Procedures 4-ONOP-003.6 & 3-ONOP-003.6 Revised to Identify Instrumentation Affected by Loss of 120-volt Vital Panel + (17:14:09, 7 January 2025)
- ML17342A165 + (17:14:12, 7 January 2025)
- L-85-292, Advises That Westinghouse Notrump Model in WCAP-10079 & WCAP-10054 Will Be Used in Future Plant Analyses,Per Resolution of TMI Action Item II.K.3.30.Item II.K.3.31 Will Be Resolved by Listed Generic Studies by 860603 + (17:14:14, 7 January 2025)
- ML17342A164 + (17:14:14, 7 January 2025)
- ML17342A160 + (17:14:16, 7 January 2025)
- ML17342A158 + (17:14:17, 7 January 2025)
- ML17342A155 + (17:14:19, 7 January 2025)
- IR 05000408/2005020 + (17:14:22, 7 January 2025)
- ML17342A152 + (17:14:23, 7 January 2025)
- L-85-128, Requests Extension Until 850415 to Respond to Notice of Violation EA-84-121,per 850328 Telcon.Extension Needed Due to Complexity & Multitude of Problems & to Allow for Internal Util Review + (17:14:25, 7 January 2025)
- ML17342A150 + (17:14:25, 7 January 2025)
- L-85-271, Suppls 850514 Response to 850304 Request for Addl Info Re SPDS Variable Selection.Phase a & B Containment Isolation Indicated by Matrix of Valve Position Status Lights Located on Vertical Panel B + (17:14:30, 7 January 2025)
- L-85-177, Discusses Response to Action Items of IE Bulletin 83-06. Tube Line Matl Supplied by Gulfalloy Acceptable.Qa Vendor Audit Checklists Revised + (17:14:32, 7 January 2025)
- ML17342A134 + (17:14:35, 7 January 2025)
- ML17342A129 + (17:14:36, 7 January 2025)
- ML17342A123 + (17:14:37, 7 January 2025)
- ML17342A121 + (17:14:38, 7 January 2025)
- L-85-231, Responds to Violations Noted in Insp Repts 50-250/85-09 & 50-251/85-09.Corrective Actions:Addl Time Required for Response to Finding 1 Re Procedural Requirements for Thread Engagements.Evaluation to Resolve Finding Initiated + (17:14:39, 7 January 2025)