ML17342A152
| ML17342A152 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/10/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Williams J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17342A153 | List: |
| References | |
| NUDOCS 8508010771 | |
| Download: ML17342A152 (4) | |
See also: IR 05000250/1985013
Text
J.UI. 1 0. l985
~Florida
Power
and Light Company
ATTN:
Mr. J.
W. Williams, Jr.
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
REPORT
NOS.
50"250 85-1
AND 50-251/85-13
On April 8
May 20,
1985,
NRC inspected activities authorized
by
NRC Operating
License
Nos.
and
DPR-41 for your Turkey Point facility. At the conclusion
of the inspection,
the findings were di scussed
with those
members
of your staff
identified in the enclosed
inspection report.
a
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
inter views with personnel
and observation
of activities
in progress.
t
The inspection
findings indicate that certain activities violated
NRC require-
ments.
The violations, references
to pertinent requirements,
and elements
to be
included in your response
are presented
in the enclosed
Since "similar violations",
as described
in the
NRC Enforcement
Policy,
are of
significant concern
to the
NRC, in your response,
please
give particular atten-
tion to the identification and
remedy of the root cause
of the violation so that
its recurrence
may be precluded.
Your attention is invited to unresolved
items .identified in the inspection
report.
These matters will be pursued
during future inspections.
The
responses
directed
by this letter and the enclosures
are not subject to the
clearance
procedures
of the Office of Management
and
Budget
issued
under
the
Paperwork Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
please
contact
us.
- A
~ 8807lO-
85pspg
8
"D<<< psooopsp
Pa@.
I Enclosures:
1.
2.
Inspection
Report Nos. 50-250/85-13
and 50-251/85-13
Sincerely,
Original Signed by
Roger D. Walker
Roger
D. Walker, Director
Division of Reactor Projects
cc w/encls:
(See
page
2)
7 &Dlpo,
l
CUD, 10
1S85
Florida Power
and Light Company
'/encls:
C.
M. Wethy, Vice President
Turkey Point Nuclear Plant
~C. J.
Baker, Plant Manager
Turkey Point Nuclear Plant
, M J. Acosta,
Plant
gA Superintendent
bgc w/encls:
tARC Resident
Inspector
Document Control
Desk
State of Florida
~
RII
k:sa
0$/oK/85
/
/85
VBrownlee
/5/0</85
l
f
))
g "If[.