Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-85-340, Remits Fee for 850201 Submittal of Reanalysis of Spent Fuel Pool Storage Racks Re Liftoff During Seismic Events + (15:54:08, 7 January 2025)
- L-85-326, Responds to NRC Re Violations Noted in Insp Repts 50-250/85-21 & 50-251/85-21.Corrective Actions Re Security Plan Withheld (Ref 10CFR2.790 & 73.21) + (15:54:10, 7 January 2025)
- ML17346B138 + (15:54:14, 7 January 2025)
- IR 05000250/1985023 + (15:54:22, 7 January 2025)
- ML17346B133 + (15:54:24, 7 January 2025)
- L-85-312, Documents Util Understanding That Forwarding Written Response to Insp Repts 50-250/85-13 & 50-251/85-13 by 850823 Acceptable,Per 850809 Telcon.Response Delay Caused by Need for Addl Util Internal Coordination + (15:54:25, 7 January 2025)
- L-85-318, Responds to NRC Re Violations Noted in Insp Repts 50-250/85-09 & 50-251/85-09.Corrective Actions:Description of Existing Fastener Thread Engagement Insp Plan Encl. Results Will Be Submitted by 851122 + (15:54:27, 7 January 2025)
- L-85-329, Informs of Planned Alternate Shutdown Procedure Implementation Per Approved Schedule in in Accordance w/10CFR50,App R Section III.L.3.Fire Watches Planned During Implementation + (15:54:29, 7 January 2025)
- IR 05000250/1985022 + (15:54:48, 7 January 2025)
- ML17346B127 + (15:54:50, 7 January 2025)
- ML17346B125 + (15:54:51, 7 January 2025)
- ML17346B124 + (15:54:52, 7 January 2025)
- L-85-314, Application for Amends to Licenses DPR-31 & DPR-41,revising Offsite Organization & Reportable Events,Per Generic Ltr 83-43.Fee Paid + (15:54:56, 7 January 2025)
- L-85-306, Responds to Violations Noted in Insp Repts 50-250/85-17 & 50-251/85-17.Corrective Actions:Leaking Package Inspected & Repaired & Escorted to St Lucie.Wooden Container Suspended from Use + (15:55:00, 7 January 2025)
- L-85-308, Advises That Based on Preliminary ATWS Implementation Schedule,Mods Will Not Be Implemented by Winter 1986 for Unit 3 & Winter 1987 for Unit 4,per 10CFR50.62(d).Schedules Contingent on NRC Approval of Westinghouse Generic Design + (15:55:03, 7 January 2025)
- CAC:ME2979 + (15:55:08, 7 January 2025)
- ML17346B118 + (15:55:08, 7 January 2025)
- TAC:52810 + (15:55:10, 7 January 2025)
- ML17346B111 + (15:55:10, 7 January 2025)
- TAC:51263 + (15:55:12, 7 January 2025)
- ML17346B109 + (15:55:12, 7 January 2025)
- L-85-249, Advises That During Startup Testing of Two Redundant Safety Grade Channels Per Reg Guide 1.97,instruments Experienced Background Electrical Interference.Problems Resolved by Making Instrument Cable Shielding Mods & Tuning Electronics + (15:55:13, 7 January 2025)
- IR 05000250/1985015 + (15:55:20, 7 January 2025)
- L-85-221, Forwards Response to 850502 Request for Completion of Encl 2 to Generic Ltr 85-07 Re Implementation of Integrated Schedules for Plant Mods + (15:55:22, 7 January 2025)
- ML17346B105 + (15:55:22, 7 January 2025)
- IR 05000250/1985009 + (15:55:27, 7 January 2025)
- ML17346B102 + (15:55:29, 7 January 2025)
- ML17346B100 + (15:55:31, 7 January 2025)
- IR 05000250/1985016 + (15:55:33, 7 January 2025)
- ML17346B097 + (15:55:35, 7 January 2025)
- L-85-238, Forwards Response to Generic Ltr 85-02 Re Resolution of Unresolved Safety Issues Concerning Steam Generator Tube Integrity.Recommendations on Category C-2 Steam Generator Tube Insps Will Be Submitted by 850916 + (15:55:36, 7 January 2025)
- ML17346B093 + (15:55:38, 7 January 2025)
- IR 05000335/1985002 + (15:55:47, 7 January 2025)
- IR 05000250/1985001 + (15:56:08, 7 January 2025)
- ML17346B088 + (15:56:09, 7 January 2025)
- IR 05000250/1985006 + (15:56:14, 7 January 2025)
- IR 05000311/2004008 + (15:56:15, 7 January 2025)
- ML17346B084 + (15:56:17, 7 January 2025)
- TAC:45869 + (15:56:17, 7 January 2025)
- L-85-233, Responds to NRC Re Generic Ltr 83-28,Section 2.2.2 Concerning Implementation.Item Addressed in Util Re Implementation of Nutac Rept.Vendor Equipment Technical Info Program Adequate + (15:56:19, 7 January 2025)
- ML17346B080 + (15:56:20, 7 January 2025)
- L-85-227, Revised Application to Amend Licenses DPR-31 & DPR-41, Changing Tech Spec 3.3-2 Re Containment Air Lock + (15:56:21, 7 January 2025)
- L-85-225, Forwards Rev 8 to Topical QA Rept. Changes Do Not Reduce Commitments in Program Description Previously Accepted by NRC + (15:56:24, 7 January 2025)
- ML17346B076 + (15:56:24, 7 January 2025)
- L-85-207, Ack Receipt of 850104 Safety Evaluation & Technical Evaluation Rept Accepting Masonry Wall Design Mods & Requesting Notification of Mod Completion,Per IE Bulletin 80-11.Battery Room Walls to Be Completed by Dec 1985 + (15:56:32, 7 January 2025)
- L-85-218, Forwards Addl Info Re Relief Request 3,concerning Regenerative HX Second Insp Interval Inservice Insp.Relief from Code Vol & Surface Areas Required in Performance of Ultrasonic & Surface Exam Requested + (15:56:34, 7 January 2025)
- TAC:57677 + (15:56:36, 7 January 2025)
- L-85-215, Advises That Valves MOV-750 & MOV-751 Would Be Locked Closed During Normal Plant Operation & Following LOCA by Locking Breakers for Valves Open.Procedures to Be Revised to Require Breaker for Valve MOV-751 to Be Locked Open + (15:56:37, 7 January 2025)
- TAC:56806 + (15:56:39, 7 January 2025)
- ML17346B067 + (15:56:39, 7 January 2025)
- L-85-216, Forwards Response to 850416 Request for Addl Info on 850128 & 0302 Applications to Amend Licenses DPR-31 & DPR-41, Changing Tech Specs Re Containment Sys + (15:56:40, 7 January 2025)