Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18009A515 + (11:55:55, 7 January 2025)
- ML18009A513 + (11:55:56, 7 January 2025)
- ML18009A512 + (11:55:57, 7 January 2025)
- ML18009A511 + (11:55:58, 7 January 2025)
- ML18009A508 + (11:55:59, 7 January 2025)
- ML18009A507 + (11:56:00, 7 January 2025)
- 05000400/LER-1990-007, :on 900321,waste Gas Decay Tanks Noble Gases Miscalculated.Caused by Inaccurate Interpretation of Term in Tech Spec.Procedure Revised to Incorporate Approximate Xe-133 Dose Equivalency Weighting Factors + (11:56:02, 7 January 2025)
- ML18009A503 + (11:56:03, 7 January 2025)
- 05000400/LER-1990-009, :on 900324,containment Sump Leak Rate Sys Declared Inoperable Due to Frequent Invalid Alarms & Manual Logging Commenced.Caused by Procedural Weakness.Surveillance Test Re RCS Leakage Evaluation Revised + (11:56:04, 7 January 2025)
- 05000400/LER-1990-008, :on 900314,discrepancy in Amperage Rating of Circuit Breaker Providing Overcurrent Protection for Containment Penetration Conductor Discovered.Caused by Use of Oversized Breaker.Breaker Upsized + (11:56:12, 7 January 2025)
- ML18009A499 + (11:56:13, 7 January 2025)
- ML18009A497 + (11:56:15, 7 January 2025)
- ML18009A498 + (11:56:15, 7 January 2025)
- ML18009A496 + (11:56:16, 7 January 2025)
- ML18009A494 + (11:56:17, 7 January 2025)
- ML18009A490 + (11:56:18, 7 January 2025)
- ML18009A491 + (11:56:18, 7 January 2025)
- ML18009A488 + (11:56:19, 7 January 2025)
- ML18009A487 + (11:56:20, 7 January 2025)
- ML18009A484 + (11:56:20, 7 January 2025)
- ML18009A483 + (11:56:21, 7 January 2025)
- ML18009A482 + (11:56:22, 7 January 2025)
- ML18009A480 + (11:56:23, 7 January 2025)
- ML18009A474 + (11:56:23, 7 January 2025)
- ML18009A473 + (11:56:25, 7 January 2025)
- CP-201701002, Revised Completion Date for the Multiple Spurious Operations Circuit Interactions Resolution Implementation Plan + (11:56:26, 7 January 2025)
- IR 05000400/1989023 + (11:56:27, 7 January 2025)
- ML18009A463 + (11:56:28, 7 January 2025)
- LIC-17-0076, EP-FC-1001 Revision 3, Post-Shutdown Radiological Emergency Response Plan for Fort Calhoun Station + (11:56:31, 7 January 2025)
- ML18009A461 + (11:56:32, 7 January 2025)
- ML18009A460 + (11:56:33, 7 January 2025)
- ML18009A459 + (11:56:33, 7 January 2025)
- ML18009A458 + (11:56:34, 7 January 2025)
- ML18009A453 + (11:56:35, 7 January 2025)
- ML18009A451 + (11:56:36, 7 January 2025)
- IR 05000400/1990004 + (11:56:38, 7 January 2025)
- ML18009A446 + (11:56:39, 7 January 2025)
- CP-201700976, Active Safety Function Anchor Darling Double Disc Gate Valves + (11:56:40, 7 January 2025)
- CP-201701010, Special Report 1-SR-17-001-00 for Comanche Peak Nuclear Power Plant, Unit 1 Regarding Inoperable Post Accident Monitoring Instrument Report + (11:56:41, 7 January 2025)
- ML18009A444 + (11:56:41, 7 January 2025)
- CP-201700985, Correction Regarding Relief Request 1/2B3-2 for the Units 1 and 2 Third Ten Year Inservice Inspection Interval + (11:56:42, 7 January 2025)
- 05000400/LER-1990-006, :on 900309,discovered That Evolution Violated Requirements of FSAR to Keep Individual Tanks Isolated from Another Tank.Caused by Failure to Address Evolution in Operating Procedure.Procedure Revised + (11:56:43, 7 January 2025)
- ML18009A439 + (11:56:45, 7 January 2025)
- ML18009A438 + (11:56:46, 7 January 2025)
- 05000219/LER-1917-005, Regarding Failure of the Emergency Diesel Generator 2 During Surveillance Testing Due to a Broken Electrical Connector + (11:56:51, 7 January 2025)
- 05000400/LER-1990-005-01, :on 900307,engineered Safety Sys Feature Actuation Occurred Due to Radiation Monitor Spike.Caused by Loose Pin Connection in Coaxial Cable Connector.Maint Surveillance Test Revised + (11:56:53, 7 January 2025)
- ML18009A425 + (11:56:54, 7 January 2025)
- ML18009A434 + (11:56:54, 7 January 2025)
- ML18009A423 + (11:56:55, 7 January 2025)
- ML18009A422 + (11:56:56, 7 January 2025)
- 05000400/LER-1990-004-01, :on 900227,Tech Spec Violation Due to Missed Leak Rate Evaluation.Caused by Procedural Weakness.Procedure to Be Revised to Ensure Leak Rate Evaluation Will Be Completed within Required Time Span + (11:56:58, 7 January 2025)