Docket No. 50-400
License
No. NPF-63
Carolina
Power
and Light Company
ATTN:
Mr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
(NRC INSPECTION
REPORT
NO. 50-400/89-33)
This refers to the
NRC's Systematic
Assessment
of Licensee
Performance
(SALP)
Report for your Shearon
Harris Nuclear
Power Plant which was sent to you on
February 8,
1990;
our meeting
on February
20,
1990, at which we discussed
this
report;
and your written comments
in a letter dated
March 22,
1990.
The
Board
has
considered
your two comments
in the functional
area of Maintenance
with the following conclusions:
a
~
Maintenance
Training -
The
Report
acknowledged
a satisfactory
maintenance
training program,
but described
lack of documented
training
for
some
specialized
tasks
and
waiving refresher
training for
some
experienced
craftsmen
as
weaknesses.
Your
response
states
that
a
significant
amount of refresher
training
was
conducted
and that waivers
were justified.
Our
assessment
was
based
upon
a
Maintenance
Team
Inspection
which identified
the
small
number
and
general
nature
of
qualification cards
as
a weakness.
This inspection
also
noted that the
program for requalification
of craftsmen
could
be
strengthened
by
requiring
a test to be passed
or refresher training to be scheduled
as
a
condition for waiving recertification training.
We
acknowledge
the
program attributes
cited in your
response,
but
we continue
to believe
that the conclusions
stated
in the Maintenance
Team Inspection
and
Reports
are valid.
The Board
recommended
no change
to the Initial Salp
Report.
b.
Root
Cause
of Turbine Area Fire - The
Board determination that
damaged
parts
were inadvertently left in the bus duct was
based
on your presenta-
tion at the peeting
held in Rockville, Maryland
on December
20,
1989.
A
summary of your presentation
was
forwarded to you
by
NRC letter dated
January
10,
1990.
Your information relative to limited access,
and your
subsequent
disassembly
and cleaning of the
bus duct cooling damper
does
not alter the root cause of the turbine area fire.
The Board
recommended
~
~
~
no change to the Initial SALP Report.
I concur with the
Board's
disposition
of your
comments.
The enclosures
consist
of
a meeting
summary
and
SALP slides;
an errata
coversheet
which
constitutes
our Final
SALP Report;
and
a copy of your written comments.
p()(jQ JIM( )p)7Q ++04 Ii
eD~
~
-
FrC:
~jggK n-000400
C0
Carolina
Power and Light Company
APR 11 fggP
The performance
at your Harris facility has
been superior
and I encourage
you
to strive for excellence
in all
SALP functional areas.
No reply to this letter is required;
however,
should you have
any questions,
I
will be pleased
to discuss
them with you.
Sincerely,
(Original signed
by JLMilhoan/for)
Enclosures:
1.
Meeting Summary dated 2/20/90
w/Slides
2.
Errata Sheet
3.
CPRL Comments
dated 3/22/90
cc w/encls:
, R.
B. Richey,
Manager
-Harris Nuclear Project
Box 165
New Hill, NG
27562
C.
S. Hinnant
Plant General
Manager
Harris Nuclear Project
Box 165
New Hill, NC
27562
D. L. Tibbitts, Director
Regulatory
Compliance
Harris Nuclear Project
P. 0.
Box 165
New Hill, NC
27562
Richard
E. Jones
General
Counsel
Carolina
Power
8 Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
Dayne
H. Brown, Director
Division of Radiation Protection
N.
C. Department of Environment,
Health
& Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
bcc w/encl:
(See
page
3)
Stewart
D. Ebneter
Regional Administrator
i4
Carolina
Power and Light Company
APR 11 1990
bcc w/encls:
K. M. Carr,
Chairman
T.
M. Roberts,
Commissioner
F. J.
Remick,
Commissioner
K. C. Rogers,
Commissioner
J.
R. Curtiss,
Commissioner
J.
M. Taylor,
H. L. Thompson, Jr.,
R.
W. Borchardt,
Regional
Coordinator,
T. E. Murley,
S. Varga,
E.
G. Adensam,
R. A. Becker,
R.
Nease,
SALP Coordinator,
Regional Administrators,
RI, RIII
RIV, and
RV
K. Clark,
RII,
PAO
D.
M. Verrelli, DRP, RII
H.
C. Dance,
DRP, RII
R..E. Carroll,
DRP, RII
K. Landis, Chief,
NRC Resident
Inspector
DRS and
DRSS Branch Chiefs,
and Section Chiefs
IMPELL
Document Control
Desk
ger
)
(4r(
RII:D P
)
DVerrel 1 i
04/
/90
RII'
LReyes
04/~o/90
RII:
S
04
90
tohr
04//@ 90
J li 1 hoan
04'>00
ENCLOSURE
1
A.
A meeting
was held at 1:00 p.m.
on February
20,
1990, at the Harris
Energy
and
Environmental
Center,
near
New Hill, North Carolina, to
discuss
the
SALP Board Report for the Harris facility.
B.
Licensee Participants
S.
H. Smith, Jr., President
8 Chief Executive Officer
L.
W. Eury, Executive Vice President
R. A. Watson,
Senior Vice President
C.
D. Barhom, Jr., Senior Vice President
R.
B. Richey,
Manager Harris Project
S. Hinnant, Plant Manager
The list of licensee 'ttendees
above
does
not include
the large
number of Carolina
Power
and
Light
Company
employees
that
were
present
at the
SALP presentation.
The personnel
were supervisors,
plant operators,
maintenance
personnel,
and
various
plant staff.
This large turnout was beneficial
to the
SALP process
and is highly
recommended for future presentations.
C.
NRC Participants
S.
D. Ebneter,
Regional Administrator
J.
P. Stohr, Director, Division of Radiation Safety
and Safeguards
E.
G. Adensam,
Director., Project Directorate II-1, Office of
Nuclear Reactor Regulation
(NRR)
R. A. Becker, Project Manager,
H.
C. Dance,
Chief, Reactor Projects
Section
1A, Division of
Reactor Projects
(DRP)
J.
E. Tedrow, Senior Resident
Inspector - Harris,
M. C.
Shannon,
Resident
Inspector - Harris,
SYSTEMATIC ASSESSMENT
OF
LICENSEE PERFORMANCE
SALP PERIOD
JULY 1, 1988
THROUGH NOVEMBER 30,
1989
HARRIS UNIT
1
FEBRUARY 20, 1990
NEW HILL, NORTH CAROLINA
SALP PROGRAM OBJECTlVES
$ . IDENTIFY TRENDS
IN LICENSEE PERFORMANCE
2.
PROVIDE A BASIS FOR ALLOCATION
OF NRC RESOURCES
3.
IMPROVE NRC REGULATORY PROGRAM
MET OE KFADlNEiTffKE
ADMINISTRATOR
S. EBNETER
DEPUTY
J. MILHOAN
DIVISION OF
REACTOR PROJECTS
DIR.
L. REYES
DEPUTY
C. HEHL
DIVISION OF
REACTOR SAFETY
DIR.
A. GIBSON
DEPUTY E. MERSCHOFF
DIVISION OF
RADIATION SAFETY
AND SAFEGUARDS
DIR.
J.
STOHR
DIVISION OF REACTOR PROJECTS
ORGANIZATION
DKSION OP
RELCTOR PROJECTS
DIE.
L RElES
DEPUTY
C. HEHL
RECTOR PROJECTS
BMNCH NO. i
CHIEF
D. VBRRELU
PROJECTS
SECTION
NO. IA
CHIEF H. DANCE
PROJECTS
SECTION
NO. 18
CHIEF
F. CANTREU
BRUNSWICK
HARRIS
RQBINSQN
FARLEY
GRAND GULF
SUMMER
OFFICB OF
NUCLEAR RIhCTOR
REGULATION
DHL THOKS B. MtJRLEY
ASSOC. DIRECTOR FOR
PROKCTS
J. PARTLY
ASSOC. DIRECTOR FOR
INSPECTION 0
TECHNICAL ASSESSMENT
DIV. OP ENGINIEBIN
AND SHIRR
YIlCHNOIOCV
av~ m.rjh
k LBNHAM, ML E"1
I. MX%, HNM. RGL
HiRRN
DK Of
OPIATIC,meS/
DK OF REACTOR
INBPECTION AND
8APEGUARDS
DKHNN Ot
amies mu. m/spr
IXf.IIitjMN
PROSC5N AND
l5$ROCKN PQSPLiRSRSN
DK Ot QtINR!
PIRNIMNCR Ml
gUkLEK NAIBEFSN
4.
Eg
.
MAJOR CHANGES TO THE
SALP PROGRAM CONSIST OF...
~ Redefinition of Functional Areas
'eduction
in Number of Separate
unc iona
reas
~ Two New Functional Areas
- Engineering/Technical
Support
- Safety Assessment/Quality
Verification
~ Attributes Addressing
Human Performance
and Self-Assessment
~ Emphasis
on Analysis
PERFORMANCE ANALYSIS AREAS
FOR OPERATING REACTORS
\\
A. PLANT OPERATIONS
B. RADIOLOGICAL CONTROLS
C. MAINTENANCE/ SURVEILLANCE
D. EhERGENCY PREPAREDNESS
E. SECURITY / SAFEGUARDS
F. ENGINEERING / TECHNICAL SUPPORT
G. SAFETY ASSESShlENT / EQUALITY VERIFICATION
P
ENGINEERING
TECHNICAL SUPPORT
The purpose
of this functional area
is to address
the adequacy
of technical
an
en
ineerin
su
o
or a
an
ac ivi ies.
inc u es
a
icensee
Activities associated
with the design
of plant modifications; engineering
and
technical support for operations,
outages,
maintenance,
testing,
surveillance;
and
procurement
activities; training; and
configuration management
(including
main ainin
esi
n
ases
an
mar ins,
SAFETY ASSESSMENT/QUALITY VERIFICATION
The purpose
of this funtional area
is to address
the
technical adequacy
and completeness
of the licensee's
approach
toward
a variety of activities associated
with
the implementotion of licensee
safety policies and
licensee
activities related to amendment
requests,
exemption
requests,
relief requests,
response
to generic letters,
bulletins, and information notices
and resolution of TMI
items and other regulatory initiatives.
It also includes
licensee
activities related to the resolution of safe
issues,
10 CFR 50.59
reviews,
10 CFR 21 assessments,
safety
committee
amd self-assessment
activities, analysis of
industry's operational
experience,
root cause
analyses
of
plant events,
use of feedback from plant quality assurance/
quality control (QA/QC) reviews,
and participation
in self-
improvement programs.
It includes the effectiveness
of the
licensee's
quality verification function in identifying
substandard
or anomalous
performance
In monitoring the
overall performance
of the plant.
l
CATEGORY 1
LICENSEE MANAGEMENT ATTENTION AND INVOLVEMENT
ARE READILY EVIDENT AND PLACE EMPHASIS ON SUPERIOR
PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS
ACTIVTIES, WITH THE RESULTING PERFORMANCE SUB-
STANTIALLY EXCEEDING REGULATORY REQUIREMENTS.
LICENSEE
RESOURCES
ARE AMPLE AND EFFECTIVELY USED SO THAT
A HIGH LEVEL OF PLANT AND PERSONNEL PERFORMANCE IS
BEING ACHEIVED.
REDUCED NRC ATIENTION MAY BE
APPROPRIATE,
LICENSEE MANAGEMENT ATTENTION AND INVOLVEMENT
I
IN THE PERFORMANCE OF NUCLEAR SAFElY OR SAFEGUARDS
ACTIVITIES ARE GOOD.
THE IJCENSEE
HAS ATTAINED A
LEVEL OF PERFORMANCE ABOVE THAT NEEDED TO MEET
REGULATORY REQUIREMENTS.
LICENSEE RESOURCES
ARE
ADEQUATE AND REASONABLY ALLOCATED SO THAT GOOD PLANT
AND PERSONNEL PERFORMANCE IS BEING ACHEIVED.
NRC
ATTENTION MAY BE MAINTAINEDAT NORMAL LEVELS.
LICENSEE MANAGEMENT ATTENTION AND INVOLVEMENT
IN THE PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS
ACTIVITIES ARE NOT SUFFICIENT.
THE LICENSEE'S
PERFORMANCE DOES
NOT SIGNIFICANTLY EXCEED THAT NEEDED
TO MEET MINIMALREGULATORY REQUIREMENTS.
LICENSEE
RESOURCES
APPEAR TO BE STRAINED OR NOT EFFECTIVELY
P
USED.
NRC ATTENTION SHOULD BE INCREASED ABOVE
NORMAL LEVELS.
'
.1. MANAGEMENT INVOLVEMENT IN ASSURING QUAUTY
2; APPROACH TO RESOLUTION OF TECHNICAL ISSUES
FROM A SAFElY STANDPOINT
3. RESPONSIVENESS
TO NRC INITIATIVES
4. ENFORCEMENT HISTORY
5.
REPORTING AND ANALYSIS OF REPORTABLE EVENTS
6. STAFFING (INCLUDING MANAGEMENT)
7. TRAINING EFFECTIVENESS AND QUALIFICATION
C
VIOLATION SUMMARY
JV1Y 1, 1988 through
NOYEMBER 30,
$ 9&9
IV
V
HARRIS
1
0
0
2
19
0
'EGION
II AVE.
PER
OPERATING
UNIT
0
.0
2
17
4
JULY 1, 1988 through
NOVEMSER 30, 1989
(ever 8)
0
20
Z )5
16
LEGEND
PERSONNEL
other
= 7
PERSONNEL
test
cal
=
1
PERSONNEL
maintenance
= 4
PERSONNEL
operating
= 4
OTHER = 0
COMPONENT FAILURE = 9
DESIGN
CONST. -" 11
.PERSONNEL
total
= 16
PLANT
PERSONNEL
JULY 1, 1987 through
JUNE 30, 1988
{CYCLE 7)
LEGEND
PERSONNEL
other
= 4
PERSONNEL
test
cal
= 7
PERSONNEI.
maintenance
= 5
PERSONNEL
operating
= 7
OTHER = 3
COMPONENT FAILURE = 10
DESIGN
CONST. = 7
PERSONNEL
total
= 25
PLANT
PERSONNEL
FUNCT ONAL AREA COMPARISON
FOR
ELEVEN REGION
II SITES
N SALP CYCLE 8
.
Z
Ng
Og
5
Z
bJ g
>0
g
Q hl
Z~
LEGEND
t
CATEGORY
1
CATEGORY 2
CATEGORY 3
o
RAD
M/S
SEC
E/TS
SA/GY
FUNCTiONAL AREA
OPERATIONS
(CATEGORY 1)
r
OVERALL PERFORMANCE
IN OPERATIONS
WAS EXCELLENT
STRENGTHS
MANAGEMENT !NVOLVEMENT IN
DAY-TO "DAY ACTIVITIES
PROFESSIONAL,
MOTIVATED, NfELL
QUALIFIED STAFF
SHIFT TURNOVER PROCESS
PLANT HOUSEKEEPING
INTERFACING WITH OTHER SITE
ORGANIZATIONS
PROFESSIONAl
FIRE BRIGADE AND-
EFFECTIVE TRAINING PROGRAM
CONTROL ROOM DRANflNGS
CLEARANCE CENTER
WEAKNESSES
ALL EIGHT REACTOR TRIPS
FROM
SECONDARY PLANT TRANSIENTS
SECONDARY PLANT KNOWLEDGE
RADIOLOGICALCONTROLS
(CATEGORY 1)
OVERALL PERFORMANCE
IN RADIOLOGICAL
CONTROLS
WAS EXCELLENT
~
STRENGTHS
Al ARA PROGRAM
CONTROL OF CONTAMINATED AREA
FLOOR
SPACE
RADIATION MONITORING SYSTEM
RELIABILITY IMPROVEMENT EF FORT
PRIMARY AND SECONDARY CHEMISTRY
RADWASTE MANAGEMENT AND CONTROL
~
WEAKNESSES
PERSONNEL
CONTAMINATIONS
RESULTING FROM INADEQUATE
CONTROLS
MAINTENANCE/SURVEILLANCE
(CATEGORY 2)
~
OVERALL PERFORMANCE
IN MAINTENANCE/
SURVEILLANCE DECLINFD
~
STREN GTHS
t
AUTOMATED MAINTENANCE MANAGEMENT
SYSTEM
MAINTENANCE PLANNING FEEDBACK
SYSTEM
MATERIALS AND CONTROL SYSTEM
INSTRUMENT AND CONTROL PROGRAM
SWITCH GEAR PREVENTIVE
MAINTENANCE PROGRAM
WELL QUALIFIED STAFF
MAINTENANCE/SURVEILLANCE
(CATEGORY 2)
(CONT'D)
WEAKNESSES
SIGNIFICANT EVENTS RESULTING,
FROM INADEQUATE MAINTENANCE
ACTIVITIES
MAINTENANCE TRAINING
DOCUMENTATION
INCl USION OF VENDOR
RECOMMENDATIONS
CONTROL OF OVERTIME
CONSUMABLES IDENTIFICATION
IN WORK PACKAGES
(CATEGORY 1)
~
OVERALL PERFORMANCE
IN EMERGENCY
PREPAREDNESS
WAS EXCELLENT
~
STRENGTHS
COMPREHENSIVE AND DETAILED AUDITS
STRONG MANAGEMENT COMMITMENT
I
EFFECTIVE TRACKING SYSTEM
4
WELL TRAINED ONSITE EMERGENCY
ORGANIZATION
~
WEAKNESSES
'I
NONE (MINOR AREAS FOR IMPROVEMENT)
SECURIT Y
(CATEGORY 2)
~
OVERALL PERFORMANCE
IN SECURITY
DECLINED
~
STRENGTHS
STRONG
INTERFACE AMONG CP8L
SECURlTY PROGRAMS
ENHANCED PROTECTION
OF FACILITY
THROUGH SELF ASSESSMENTS
~
WEAKNESSES
PROGRAM DEFICIENCIES
IN MAINTAINING
ADEQUATE BARRIERS
SECURlTY OFFICER
INATTENTIVENESS
ACCESS
CONTROL PROBLEMS
~
~
l
ENGINEERING/TECHNICAL SUPPORT
(CATEGORY ~)
~
OVERALL PERFORMANCE
IN ENGINEERING/
TECHNICAL SUPPORT
WAS EXCELLENT
~
STRENGTHS
EFFECTIVE TECHNICAL SUPPORT
GROUP
STRONG
DESIGN CHANGE DEVELOPMENT
PROGRAM
EFFECTIVE COORDINATION OF
CORPORATE
AND ONSITE ENGINEERING RESOURCES
EFFECTIVE ENVIRONMENTAL QUALIFICATION
{EQ) PROGRAM
WEAKNESSES
EQ CRAFT LEVEL TRAINING
SAFETY ASSESSMENT/
UALITY
VERIFICATION (CATEGORY 1)
~
OVERALL P ERFORMANCE
IN SAF ETY
ASSESSMENT/QUALITY VERIFICATION
WAS EXCELLENT
~
STRENGTHS
MANAGEMENT INVOLVEMENT IN SAFETY
REVIEWS
STRONG SAFETY CULTURE
EFFECTIVE USE
OF OVERSIGHT GROUPS
10
CFR 50.59
REVIEWS
HUMAN PERFORMANCE EVALUATION
SYSTEM
ROOT CAUSE INVESTIGATION
~
WEAKNESSES
FOLLOWING CHANGES EXTERNAL TO THE
SITE
ENCLOSURE 2
ERRATA SHEET
~Pa
e
coversheet
Line
Initial Re ort Reads
INITIAL SALP
REPORT
Final
Re ort Reads
FINAL SALP
REPORT
ENCLOSURE
INITIAL SALP
REPORT
U. S.
NUCLEAR REGULAT
Y COMMISSION
R
0
II
SYSTEMATIC ASSE@
T OF LICENSEE
PERFORMANCE
INSk
ION REPORT
NUMBER
50-400/89-33
CAROLI
POWER
AND LIGHT COMPANY (CP8IL)
SHEARON HARRIS
1
JULY 1,
1988 -
NOYEMBER 30,
1989
ENCLOSURE
FINAL SALP
REPORT
U.
S.
NUCLEAR REGULATORY COMMISSION
REGION II
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
INSPECTION
REPORT
NUMBER
50-400/89-33
CAROLINA POWER
AND LIGHT COMPANY (CP&L)
SHEARON HARRIS
1
JULY 1,
1988 -
NOVEMBER 30,
1989