Forwards Summary of 900220 Meeting to Discuss SALP Rept 50-400/89-33 in Functional Areas of Maint Training & Root Cause of Turbine Area Fire.Viewgraphs Encl
ML18009A473
Person / Time
Site: Harris 
Issue date: 04/11/1990
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9004250070
Download: ML18009A473 (55)


See also: IR 05000400/1989033

Text

Docket No. 50-400

License

No. NPF-63

Carolina

Power

and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

(NRC INSPECTION

REPORT

NO. 50-400/89-33)

This refers to the

NRC's Systematic

Assessment

of Licensee

Performance

(SALP)

Report for your Shearon

Harris Nuclear

Power Plant which was sent to you on

February 8,

1990;

our meeting

on February

20,

1990, at which we discussed

this

report;

and your written comments

in a letter dated

March 22,

1990.

The

SALP

Board

has

considered

your two comments

in the functional

area of Maintenance

with the following conclusions:

a

~

Maintenance

Training -

The

SALP

Report

acknowledged

a satisfactory

maintenance

training program,

but described

lack of documented

training

for

some

specialized

tasks

and

waiving refresher

training for

some

experienced

craftsmen

as

weaknesses.

Your

response

states

that

a

significant

amount of refresher

training

was

conducted

and that waivers

were justified.

Our

assessment

was

based

upon

a

Maintenance

Team

Inspection

which identified

the

small

number

and

general

nature

of

qualification cards

as

a weakness.

This inspection

also

noted that the

program for requalification

of craftsmen

could

be

strengthened

by

requiring

a test to be passed

or refresher training to be scheduled

as

a

condition for waiving recertification training.

We

acknowledge

the

program attributes

cited in your

response,

but

we continue

to believe

that the conclusions

stated

in the Maintenance

Team Inspection

and

SALP

Reports

are valid.

The Board

recommended

no change

to the Initial Salp

Report.

b.

Root

Cause

of Turbine Area Fire - The

Board determination that

damaged

parts

were inadvertently left in the bus duct was

based

on your presenta-

tion at the peeting

held in Rockville, Maryland

on December

20,

1989.

A

summary of your presentation

was

forwarded to you

by

NRC letter dated

January

10,

1990.

Your information relative to limited access,

and your

subsequent

disassembly

and cleaning of the

bus duct cooling damper

does

not alter the root cause of the turbine area fire.

The Board

recommended

~

~

~

no change to the Initial SALP Report.

I concur with the

Board's

disposition

of your

comments.

The enclosures

consist

of

a meeting

summary

and

SALP slides;

an errata

coversheet

which

constitutes

our Final

SALP Report;

and

a copy of your written comments.

p()(jQ JIM( )p)7Q ++04 Ii

eD~

~

-

FrC:

~jggK n-000400

C0

Carolina

Power and Light Company

APR 11 fggP

The performance

at your Harris facility has

been superior

and I encourage

you

to strive for excellence

in all

SALP functional areas.

No reply to this letter is required;

however,

should you have

any questions,

I

will be pleased

to discuss

them with you.

Sincerely,

(Original signed

by JLMilhoan/for)

Enclosures:

1.

Meeting Summary dated 2/20/90

w/Slides

2.

Errata Sheet

3.

CPRL Comments

dated 3/22/90

cc w/encls:

, R.

B. Richey,

Manager

-Harris Nuclear Project

Box 165

New Hill, NG

27562

C.

S. Hinnant

Plant General

Manager

Harris Nuclear Project

Box 165

New Hill, NC

27562

D. L. Tibbitts, Director

Regulatory

Compliance

Harris Nuclear Project

P. 0.

Box 165

New Hill, NC

27562

Richard

E. Jones

General

Counsel

Carolina

Power

8 Light Company

P. 0.

Box 1551

Raleigh,

NC

27602

Dayne

H. Brown, Director

Division of Radiation Protection

N.

C. Department of Environment,

Health

& Natural

Resources

P. 0.

Box 27687

Raleigh,

NC

27611-7687

bcc w/encl:

(See

page

3)

Stewart

D. Ebneter

Regional Administrator

i4

Carolina

Power and Light Company

APR 11 1990

bcc w/encls:

K. M. Carr,

Chairman

T.

M. Roberts,

Commissioner

F. J.

Remick,

Commissioner

K. C. Rogers,

Commissioner

J.

R. Curtiss,

Commissioner

J.

M. Taylor,

EDO

H. L. Thompson, Jr.,

EDO

R.

W. Borchardt,

Regional

Coordinator,

EDO

T. E. Murley,

NRR

S. Varga,

NRR

E.

G. Adensam,

NRR

R. A. Becker,

NRR

R.

Nease,

SALP Coordinator,

NRR

Regional Administrators,

RI, RIII

RIV, and

RV

K. Clark,

RII,

PAO

D.

M. Verrelli, DRP, RII

H.

C. Dance,

DRP, RII

R..E. Carroll,

DRP, RII

K. Landis, Chief,

TSS

NRC Resident

Inspector

DRS and

DRSS Branch Chiefs,

and Section Chiefs

INPO

IMPELL

Document Control

Desk

ger

)

(4r(

RII:D P

)

DVerrel 1 i

04/

/90

RII'

LReyes

04/~o/90

RII:

S

04

90

tohr

04//@ 90

J li 1 hoan

04'>00

ENCLOSURE

1

A.

A meeting

was held at 1:00 p.m.

on February

20,

1990, at the Harris

Energy

and

Environmental

Center,

near

New Hill, North Carolina, to

discuss

the

SALP Board Report for the Harris facility.

B.

Licensee Participants

S.

H. Smith, Jr., President

8 Chief Executive Officer

L.

W. Eury, Executive Vice President

R. A. Watson,

Senior Vice President

C.

D. Barhom, Jr., Senior Vice President

R.

B. Richey,

Manager Harris Project

S. Hinnant, Plant Manager

The list of licensee 'ttendees

above

does

not include

the large

number of Carolina

Power

and

Light

Company

employees

that

were

present

at the

SALP presentation.

The personnel

were supervisors,

plant operators,

maintenance

personnel,

and

various

plant staff.

This large turnout was beneficial

to the

SALP process

and is highly

recommended for future presentations.

C.

NRC Participants

S.

D. Ebneter,

Regional Administrator

J.

P. Stohr, Director, Division of Radiation Safety

and Safeguards

E.

G. Adensam,

Director., Project Directorate II-1, Office of

Nuclear Reactor Regulation

(NRR)

R. A. Becker, Project Manager,

NRR

H.

C. Dance,

Chief, Reactor Projects

Section

1A, Division of

Reactor Projects

(DRP)

J.

E. Tedrow, Senior Resident

Inspector - Harris,

DRP

M. C.

Shannon,

Resident

Inspector - Harris,

DRP

SYSTEMATIC ASSESSMENT

OF

LICENSEE PERFORMANCE

SALP

SALP PERIOD

JULY 1, 1988

THROUGH NOVEMBER 30,

1989

HARRIS UNIT

1

FEBRUARY 20, 1990

NEW HILL, NORTH CAROLINA

SALP PROGRAM OBJECTlVES

$ . IDENTIFY TRENDS

IN LICENSEE PERFORMANCE

2.

PROVIDE A BASIS FOR ALLOCATION

OF NRC RESOURCES

3.

IMPROVE NRC REGULATORY PROGRAM

MET OE KFADlNEiTffKE

ADMINISTRATOR

S. EBNETER

DEPUTY

J. MILHOAN

DIVISION OF

REACTOR PROJECTS

DIR.

L. REYES

DEPUTY

C. HEHL

DIVISION OF

REACTOR SAFETY

DIR.

A. GIBSON

DEPUTY E. MERSCHOFF

DIVISION OF

RADIATION SAFETY

AND SAFEGUARDS

DIR.

J.

STOHR

DIVISION OF REACTOR PROJECTS

ORGANIZATION

DKSION OP

RELCTOR PROJECTS

DIE.

L RElES

DEPUTY

C. HEHL

RECTOR PROJECTS

BMNCH NO. i

CHIEF

D. VBRRELU

PROJECTS

SECTION

NO. IA

CHIEF H. DANCE

PROJECTS

SECTION

NO. 18

CHIEF

F. CANTREU

BRUNSWICK

HARRIS

RQBINSQN

FARLEY

GRAND GULF

SUMMER

OFFICB OF

NUCLEAR RIhCTOR

REGULATION

DHL THOKS B. MtJRLEY

ASSOC. DIRECTOR FOR

PROKCTS

J. PARTLY

ASSOC. DIRECTOR FOR

INSPECTION 0

TECHNICAL ASSESSMENT

DIV. OP ENGINIEBIN

AND SHIRR

YIlCHNOIOCV

av~ m.rjh

k LBNHAM, ML E"1

I. MX%, HNM. RGL

HiRRN

DK Of

OPIATIC,meS/

DK OF REACTOR

INBPECTION AND

8APEGUARDS

DKHNN Ot

amies mu. m/spr

IXf.IIitjMN

PROSC5N AND

l5$ROCKN PQSPLiRSRSN

DK Ot QtINR!

PIRNIMNCR Ml

gUkLEK NAIBEFSN

4.

Eg

.

MAJOR CHANGES TO THE

SALP PROGRAM CONSIST OF...

~ Redefinition of Functional Areas

'eduction

in Number of Separate

unc iona

reas

~ Two New Functional Areas

Engineering/Technical

Support

Safety Assessment/Quality

Verification

~ Attributes Addressing

Human Performance

and Self-Assessment

~ Emphasis

on Analysis

PERFORMANCE ANALYSIS AREAS

FOR OPERATING REACTORS

\\

A. PLANT OPERATIONS

B. RADIOLOGICAL CONTROLS

C. MAINTENANCE/ SURVEILLANCE

D. EhERGENCY PREPAREDNESS

E. SECURITY / SAFEGUARDS

F. ENGINEERING / TECHNICAL SUPPORT

G. SAFETY ASSESShlENT / EQUALITY VERIFICATION

P

ENGINEERING

TECHNICAL SUPPORT

The purpose

of this functional area

is to address

the adequacy

of technical

an

en

ineerin

su

o

or a

an

ac ivi ies.

inc u es

a

icensee

Activities associated

with the design

of plant modifications; engineering

and

technical support for operations,

outages,

maintenance,

testing,

surveillance;

and

procurement

activities; training; and

configuration management

(including

main ainin

esi

n

ases

an

mar ins,

SAFETY ASSESSMENT/QUALITY VERIFICATION

The purpose

of this funtional area

is to address

the

technical adequacy

and completeness

of the licensee's

approach

toward

a variety of activities associated

with

the implementotion of licensee

safety policies and

licensee

activities related to amendment

requests,

exemption

requests,

relief requests,

response

to generic letters,

bulletins, and information notices

and resolution of TMI

items and other regulatory initiatives.

It also includes

licensee

activities related to the resolution of safe

issues,

10 CFR 50.59

reviews,

10 CFR 21 assessments,

safety

committee

amd self-assessment

activities, analysis of

industry's operational

experience,

root cause

analyses

of

plant events,

use of feedback from plant quality assurance/

quality control (QA/QC) reviews,

and participation

in self-

improvement programs.

It includes the effectiveness

of the

licensee's

quality verification function in identifying

substandard

or anomalous

performance

In monitoring the

overall performance

of the plant.

l

CATEGORY 1

LICENSEE MANAGEMENT ATTENTION AND INVOLVEMENT

ARE READILY EVIDENT AND PLACE EMPHASIS ON SUPERIOR

PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS

ACTIVTIES, WITH THE RESULTING PERFORMANCE SUB-

STANTIALLY EXCEEDING REGULATORY REQUIREMENTS.

LICENSEE

RESOURCES

ARE AMPLE AND EFFECTIVELY USED SO THAT

A HIGH LEVEL OF PLANT AND PERSONNEL PERFORMANCE IS

BEING ACHEIVED.

REDUCED NRC ATIENTION MAY BE

APPROPRIATE,

LICENSEE MANAGEMENT ATTENTION AND INVOLVEMENT

I

IN THE PERFORMANCE OF NUCLEAR SAFElY OR SAFEGUARDS

ACTIVITIES ARE GOOD.

THE IJCENSEE

HAS ATTAINED A

LEVEL OF PERFORMANCE ABOVE THAT NEEDED TO MEET

REGULATORY REQUIREMENTS.

LICENSEE RESOURCES

ARE

ADEQUATE AND REASONABLY ALLOCATED SO THAT GOOD PLANT

AND PERSONNEL PERFORMANCE IS BEING ACHEIVED.

NRC

ATTENTION MAY BE MAINTAINEDAT NORMAL LEVELS.

LICENSEE MANAGEMENT ATTENTION AND INVOLVEMENT

IN THE PERFORMANCE OF NUCLEAR SAFETY OR SAFEGUARDS

ACTIVITIES ARE NOT SUFFICIENT.

THE LICENSEE'S

PERFORMANCE DOES

NOT SIGNIFICANTLY EXCEED THAT NEEDED

TO MEET MINIMALREGULATORY REQUIREMENTS.

LICENSEE

RESOURCES

APPEAR TO BE STRAINED OR NOT EFFECTIVELY

P

USED.

NRC ATTENTION SHOULD BE INCREASED ABOVE

NORMAL LEVELS.

'

.1. MANAGEMENT INVOLVEMENT IN ASSURING QUAUTY

2; APPROACH TO RESOLUTION OF TECHNICAL ISSUES

FROM A SAFElY STANDPOINT

3. RESPONSIVENESS

TO NRC INITIATIVES

4. ENFORCEMENT HISTORY

5.

REPORTING AND ANALYSIS OF REPORTABLE EVENTS

6. STAFFING (INCLUDING MANAGEMENT)

7. TRAINING EFFECTIVENESS AND QUALIFICATION

C

VIOLATION SUMMARY

JV1Y 1, 1988 through

NOYEMBER 30,

$ 9&9

IV

V

HARRIS

1

0

0

2

19

0

'EGION

II AVE.

PER

OPERATING

UNIT

0

.0

2

17

4

JULY 1, 1988 through

NOVEMSER 30, 1989

(ever 8)

0

20

Z )5

16

LEGEND

PERSONNEL

other

= 7

PERSONNEL

test

cal

=

1

PERSONNEL

maintenance

= 4

PERSONNEL

operating

= 4

OTHER = 0

COMPONENT FAILURE = 9

DESIGN

CONST. -" 11

.PERSONNEL

total

= 16

PLANT

PERSONNEL

JULY 1, 1987 through

JUNE 30, 1988

{CYCLE 7)

LEGEND

PERSONNEL

other

= 4

PERSONNEL

test

cal

= 7

PERSONNEI.

maintenance

= 5

PERSONNEL

operating

= 7

OTHER = 3

COMPONENT FAILURE = 10

DESIGN

CONST. = 7

PERSONNEL

total

= 25

PLANT

PERSONNEL

FUNCT ONAL AREA COMPARISON

FOR

ELEVEN REGION

II SITES

N SALP CYCLE 8

.

Z

Ng

Og

5

Z

bJ g

>0

g

Q hl

Z~

LEGEND

t

CATEGORY

1

CATEGORY 2

CATEGORY 3

o

OPS

RAD

M/S

EP

SEC

E/TS

SA/GY

FUNCTiONAL AREA

OPERATIONS

(CATEGORY 1)

r

OVERALL PERFORMANCE

IN OPERATIONS

WAS EXCELLENT

STRENGTHS

MANAGEMENT !NVOLVEMENT IN

DAY-TO "DAY ACTIVITIES

PROFESSIONAL,

MOTIVATED, NfELL

QUALIFIED STAFF

SHIFT TURNOVER PROCESS

PLANT HOUSEKEEPING

INTERFACING WITH OTHER SITE

ORGANIZATIONS

PROFESSIONAl

FIRE BRIGADE AND-

EFFECTIVE TRAINING PROGRAM

CONTROL ROOM DRANflNGS

CLEARANCE CENTER

WEAKNESSES

ALL EIGHT REACTOR TRIPS

FROM

SECONDARY PLANT TRANSIENTS

SECONDARY PLANT KNOWLEDGE

RADIOLOGICALCONTROLS

(CATEGORY 1)

OVERALL PERFORMANCE

IN RADIOLOGICAL

CONTROLS

WAS EXCELLENT

~

STRENGTHS

Al ARA PROGRAM

CONTROL OF CONTAMINATED AREA

FLOOR

SPACE

RADIATION MONITORING SYSTEM

RELIABILITY IMPROVEMENT EF FORT

PRIMARY AND SECONDARY CHEMISTRY

RADWASTE MANAGEMENT AND CONTROL

~

WEAKNESSES

PERSONNEL

CONTAMINATIONS

RESULTING FROM INADEQUATE

CONTROLS

MAINTENANCE/SURVEILLANCE

(CATEGORY 2)

~

OVERALL PERFORMANCE

IN MAINTENANCE/

SURVEILLANCE DECLINFD

~

STREN GTHS

t

AUTOMATED MAINTENANCE MANAGEMENT

SYSTEM

MAINTENANCE PLANNING FEEDBACK

SYSTEM

MATERIALS AND CONTROL SYSTEM

INSTRUMENT AND CONTROL PROGRAM

SWITCH GEAR PREVENTIVE

MAINTENANCE PROGRAM

WELL QUALIFIED STAFF

MAINTENANCE/SURVEILLANCE

(CATEGORY 2)

(CONT'D)

WEAKNESSES

SIGNIFICANT EVENTS RESULTING,

FROM INADEQUATE MAINTENANCE

ACTIVITIES

MAINTENANCE TRAINING

DOCUMENTATION

INCl USION OF VENDOR

RECOMMENDATIONS

CONTROL OF OVERTIME

CONSUMABLES IDENTIFICATION

IN WORK PACKAGES

EMERGENCY PREPAREDNESS

(CATEGORY 1)

~

OVERALL PERFORMANCE

IN EMERGENCY

PREPAREDNESS

WAS EXCELLENT

~

STRENGTHS

COMPREHENSIVE AND DETAILED AUDITS

STRONG MANAGEMENT COMMITMENT

I

EFFECTIVE TRACKING SYSTEM

4

WELL TRAINED ONSITE EMERGENCY

ORGANIZATION

~

WEAKNESSES

'I

NONE (MINOR AREAS FOR IMPROVEMENT)

SECURIT Y

(CATEGORY 2)

~

OVERALL PERFORMANCE

IN SECURITY

DECLINED

~

STRENGTHS

STRONG

INTERFACE AMONG CP8L

SECURlTY PROGRAMS

ENHANCED PROTECTION

OF FACILITY

THROUGH SELF ASSESSMENTS

~

WEAKNESSES

PROGRAM DEFICIENCIES

IN MAINTAINING

ADEQUATE BARRIERS

SECURlTY OFFICER

INATTENTIVENESS

ACCESS

CONTROL PROBLEMS

~

~

l

ENGINEERING/TECHNICAL SUPPORT

(CATEGORY ~)

~

OVERALL PERFORMANCE

IN ENGINEERING/

TECHNICAL SUPPORT

WAS EXCELLENT

~

STRENGTHS

EFFECTIVE TECHNICAL SUPPORT

GROUP

STRONG

DESIGN CHANGE DEVELOPMENT

PROGRAM

EFFECTIVE COORDINATION OF

CORPORATE

AND ONSITE ENGINEERING RESOURCES

EFFECTIVE ENVIRONMENTAL QUALIFICATION

{EQ) PROGRAM

WEAKNESSES

EQ CRAFT LEVEL TRAINING

COMMERCIAL GRADE DEDICATION

SAFETY ASSESSMENT/

UALITY

VERIFICATION (CATEGORY 1)

~

OVERALL P ERFORMANCE

IN SAF ETY

ASSESSMENT/QUALITY VERIFICATION

WAS EXCELLENT

~

STRENGTHS

MANAGEMENT INVOLVEMENT IN SAFETY

REVIEWS

STRONG SAFETY CULTURE

EFFECTIVE USE

OF OVERSIGHT GROUPS

10

CFR 50.59

REVIEWS

HUMAN PERFORMANCE EVALUATION

SYSTEM

ROOT CAUSE INVESTIGATION

~

WEAKNESSES

FOLLOWING CHANGES EXTERNAL TO THE

SITE

ENCLOSURE 2

ERRATA SHEET

~Pa

e

coversheet

Line

Initial Re ort Reads

INITIAL SALP

REPORT

Final

Re ort Reads

FINAL SALP

REPORT

ENCLOSURE

INITIAL SALP

REPORT

U. S.

NUCLEAR REGULAT

Y COMMISSION

R

0

II

SYSTEMATIC ASSE@

T OF LICENSEE

PERFORMANCE

INSk

ION REPORT

NUMBER

50-400/89-33

CAROLI

POWER

AND LIGHT COMPANY (CP8IL)

SHEARON HARRIS

1

JULY 1,

1988 -

NOYEMBER 30,

1989

ENCLOSURE

FINAL SALP

REPORT

U.

S.

NUCLEAR REGULATORY COMMISSION

REGION II

SYSTEMATIC ASSESSMENT

OF LICENSEE

PERFORMANCE

INSPECTION

REPORT

NUMBER

50-400/89-33

CAROLINA POWER

AND LIGHT COMPANY (CP&L)

SHEARON HARRIS

1

JULY 1,

1988 -

NOVEMBER 30,

1989