April 30, 1990 Docket No. 50-400 Mr. Lynn W. Eury Executive Vice President Power Supply Carolina Power 8 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602
Dear Mr. Eury:
SUBJECT:
WAKESOUTH REGIONAL AIRPORT AIRCRAFT HAZARDS STUDY REVIEW SHEARON HARRIS NUCLEAR POWER PLANT, UNIT I (TAC NO. 74338)
By letter dated April ll, 1990, Mr. Steven Varga informed you that we were reviewing the data and methodology of the hazards study used in your January 17, 1990, submittal and that when we had completed our review that we would forward our comments to you.
We have completed our review and our comments are enclosed.
Briefly, the results of our review may be summarized as follows.
Our review focused on the probability of aircraft'crashes damaging the safety-related facilities at the Shearon Harris Nuclear Power Plant, Unit 1 (Harris).
Our review indicates that the Harris site meets the acceptance criteria in Section 3.5.1.6 of the Standard Review Plan, provided that the operational levels of the proposed airport will not significantly exceed the 10-year projection described in the study.
However, there is a concern with respect to the potential for future growth of aviation activities after the proposed airport begins to operate.
Our review indicates that an expansion, involving more frequent flights and heavier aircraft, could increase the risks of aircraft crashes well above the risks that are currently projected and could have a significant impact on the continued safe operation of Harris.
Therefore, you are expected to assess.
the impact of projected changes and update the FSAR when such projections'ignificantly exceed that described in the present study.
9005030380 9'00430 PDR eoocK OSOoozOO P
Enclosure:
As stated cc:
w/enclosure:
See next page DISTRIBUTION BH p g
Sincerely, Ronnie H. Lo/for Richard A. Becker, Project Manager Project Directorate II-I Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
- SEE PREVIOUS CONCURRENCE C
- LA:
~
~ PD 0ATE
- 4/ )90
+4/
90 NAME
- PAnd RB cker:sw WWWWWW
~
~
WW W
WWW
~
~
D
]
a 0
~
A ensam
- JMoore W
WM\\0
- 4/ /90:4/30/90
- A n
s
/9 ar
/90 C
A
- RECORD, Document Name:
LTR LYNN W.
EURY 74338 COPY
, Jr
~
<<<<<<,I u
Hli M
t H I
- V I
P'I
~
4 I
Il "
I V
H JAM!I ~ <<
t H
~
t<<
M HP M' II M
H HJ 1
r I) Y t t
~
A H
H H
4 lt 4
IJ I,,
It,)
4 II "
~ H
<< ~
~
li
'i
)! )
t I
H H
I lt WA M
It I
~ I It,,
H I
H t
I I 4 t)
J J
'4H H I I
It I
4
~.>', I I
I H
'I
'I
<<J H
I H
"1 ltt T
tl Iil
)L 4
j J' 'l
, ~
Hl I'J'<<
I
~
I 4
~
')
4 u r
~
t u
I H
AH l,
4 h
Itt'I =) ~
DISTRIBUTION NRC PDR Local PDR J. Partlow S.
Varga G. Lainas E. Adensam P. Anderson R. Becker OGC (For inform. Only)
E. Jordan ACRS (10)
HARRIS FILE 14>>E-4 14-H-3 14-B-20 14-B-20 14-8-20 15-B-18 MNBB-3302 P-315
Mr. L. ll. Eury Carolina Power
& Light Company Shearon Harr i s CC:
Mr.
R.
E. Jones, General Counsel Carolina Power
& Light Company P.
0.
Box 1551
- Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.
S.
Nuclear Regulatory Comni ssion Poute 1,
Box 315B New Hill, North Carolina 27562 Mr.
R.
B. Richey, Manager Harris f/uclear Project Harri s th c le ar P 1 ant P.
0.
Box 165 hew Hill, North Carolina 27562 Mr.
H.
A. Cole Special Deputy Attorney General State of North Carolina P.
0.
Box 629
- Raleigh, North Carolina 27602 Regional Administrator, Region II U.S.
Nuclear Regulatory Commission 101 Mariett a Street Suite 2900 Atlanta, Georgia 30323 Mr.
C.
S.
Hinnant Plant General Manager Harris Nuclear Plant P.
0.
Box 165 New Hill, North Carolina 27562 Mr.
Dayne H.
Brown, Director Division of Radiation Protection N.
C.
Department of Environmental,
~
Commerce
& Natural Resources P.
0.
Box 27687 Ra leigh, North Carolina 27611-7687
~i n
~
~ '