.- ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9004200543 DOC.DATE: ~46.~j 1
NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power
& Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENTj AFFILIATION DOCKET N
05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 PD 1
1 2
2 1
1 1
1 INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB1 0 NUDOCS-ABSTRACT RGN2
SUBJECT:
Monthly operatin t for Mar 1990 for Harris Nuclear Power I
Plant Unit 1.
0041 tr.
DISTRIBUTION CODE:
IE24D S RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Re~crt (per Tech Specs)
NOTES:Application for permit renewal filed.
RECIPIENT COPIES COPIES ID CODE/NAME LTTR ENCL LTTR ENCL PD2-1 LA 3
3 1
1 BECKER,D 1
1
.10 10 AEOD/DOA 1
1 IRM TECH ADV 1
1 DOEA OEAB11 1
1 REG ~
01 jl 1
EXTERNAL EG&G STUARTiV A NRC PDR LPDR NSIC 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP, US TO REDUCE WASTEI CONTACTTHE.DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT, 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YQU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 28 ENCL 28
0
~sr 4
J N
f 1
Carolina Power & Ught Company P. O. Box t65 ~ New Hill~ N. C. 27562 R. B. AICHEY Manager Harrts Nuclear Project
+APR 1
6 890 File Number.'SHF/10-15505 Letter Number:
HO-903014 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO ~
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1990.
Yours very truly, R. B. Richey Manager Harris Nuclear Project MWH:kdl Enclosure cc:
Messrs.
S.
D. Ebneter (NRC-RII)
R.
G. Oehl (DOE)
J.
E. Tedrow (NRC-SHNPP) 9004200 i43 900331 PDR ADOCK 05'000400 PDC MEM/DATAREPa/1/OS4
~6 P+
I/r
I' I
(
I
DOCKET NO 050-400 UNIT:
Harris Unit 1
DATE:
March 1990 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1
operated at a 100.00 percent Availability. Factor for the referenced month and a
91.70 percent Capacity Factor.
There were two load reductions.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 194 spent fuel assemblies in Spent Fuel Pool B.
90 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
MEM/DATAREPa/1/OS4
II M
('E"iNL CO RUH DATE 04/05/98 RUH TIHE 11:18:87 t PLAH1 PERFQRHAHCE DA'I'* SY~=H OPERATING DATA REPOI<T~
I-IARRIB UNXT PAGE 1
RPD36-800 OPERATXHG STATUS Docl<LT No. e5e-40e CQHFLETED K<Y HARI< M.
I-IALE 1'ELEF'HONE
< 91 9) 362-2944 1.
UHXT HANE:
I-IARRXS UNIT 2.
REPORTXHG PLRXQD:
HARCIR 98 3.
LXCENBFD Tl-IERHAL POWER (NWT): 2775 4.
NAHI=PLATE RATIH(i (GROSS HWL=): 950.9 5.
DESXGN ELECTRICAL RATXNG (NET HWE): 988.8 6.
HAX DI=PENDABLI= CAPACITY (GROSS HWE>: 928.8 7.
HAX DEPENDABLE CAPACITY <HFT HWE): 868.0 8.
II= Cl-IAHGLB OCCUR XH CAI-ACITY RATXNGS
( ITEHS GXVE REASONS:N/A I
NOIEB There are 157 fuel I
1 assemblies in the reactor, 194 I
Ispent fuel assemblies in Spent I
IFuel Pool B, 90 of the spent fuel I
lassemblies are BWR and were shippedl Ifrom Brunswick.
I 3
THRU 7)
SINCE LAST REPORT, POWER LEVEL TO WIIXCH RI=STRICTED IF AHY (HET HWE): None.
18.
REASONS FQR REBTRXCTXON IF ANY: N/A TIGRIS NON1'I-I YR TQ DA'I'E CUHUL ATIVE I-)OURS lN REF'ORTING PERIOD 12.
NUHeEr<
ol= I<Ques REAcTOR cRITIcAL 13.
REACTOR RESERVF Bl-IUTDOWN I-IRS 14.
IROUIRS GENERATOR ON LlNE 15.
UNXT RESERVE Sl-IUTDOMN I-IOURB 16 GROSS THEI<HAL I"NE'RGY GEN ~
(HWIH>
17.
GROSS ELEC.
ENERGY GEH
<HMI-I) 18.
Nl:-,T El EC.
EHERGY GENERATED (HMII) 19.
UNIT SERVICE FAcToR 28.
UNIT AVAlLADllXTY FACTOR 21.
UHXT CAP.
FACTOR (USXHI" HDC NFT) uNXT cAF.
I=ACTOR <usING DER Hl:-1>
23.
UNI1'ORI'ED OUTAGE RATE 24.
SHUTDOWNS BCISED.
OVER NLXT 6 NQNTHS r44.88 744.ee
.80 744.00
.08 1867637.16 628182.88 586753.08 100.80 188.00 91.78 87.63
.08 (TYPE,
- DATE, 2160. 80
~ 168. ee
.00 216e.ee
.08 56'l4246.80 1897585.88 1775284.00 188.88 100.00 95.57 91.32
.00 AHD DURATION 25561.88 28157.57
.00 1'9819.35
.88 52155925.20 17347767.08 1611345..ee 77.54 77.54 73.38 70.04 4.43 Ol= EACH):
25.
IF SIIUTDOWN AT LND OF REF'QRT
- PERXOD, EBTXHATED DATE OF S1'ART I JP:
26.
UNX'T' IN TEST TATUS (PIRXOIX TQ COHHERCIAL Ol ERATION):
I=ORECAST ACHXEVED XHITXAL CRITICALITY XNXTlAL ELECTRICITY CONHERCXAL OPERATION MEM/DATAREPa/2/OS4
~
~
(
CPhl Co liuN DATI'=-
enxeSZ9e
<<uN rXHE. -
< <: <e:ea
~ I"I.ANT PERF" 0<<HANCE DATA BY~EH A~NDrX r~
-- AVLRAGL DAZLV I ~l<
LI:-:Vl:-I HARRXS UNLT PAGE IRPD39-000 HA<<CI.I DAY AVG.
DA1LY P(3MER LEVEL
<HME-NET)
DOCI< ET N(3. 058-400 C(3HPLETE1>
X<Y HA<<I<
W.
I-IALE TELEPI-I(3NE-(9$ 9) 3d)2-2944 DAY AVG. DA1LY I OMEI( LEVEL
<HME-NET) 882 38(>
407 72()
P) Q 2$
P)7 2Q f887 MEM/DATAREPa/3/OS4
~
~
~
~
~ p
~ ~
~
~
I
~
~
~ ~
~ ~
~
~
I ~
~ ~
~
~
~
0
~
i
~
I
~ '
~
~
~
~
~
~
~
I
~
~ ~
I I
~
~ ~
~
~
~
~
~
~
~
I
~
~
~
~
~ ~
~
~
~
~
~
~
~ ~
~ ~
~
~
~
~
~
~
~
~
I
~
~
~
I
~ ~
I '-
~
~
I ~..
~
~
~
~
I
~
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
MARCH 1990 DOCKET NO:
050-400 UNIT NAME:
Har r Is DATE:
4/5/90 COMPLETED BY:.
M. W. Hale TELEPHONE:
(919) 362-2944
\\,
4 Date Tl y
p e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report f System Code 4
Component Code 5
Cause ll, Corrective Action to Prevent Recurrence 90-004 900330 0,0 N/A HH VALVE Load reduced to 14$ to perform maintenance on valve 1FW-232, a level transmitter root isolation valve on Steam Generator
>>IC.>>
The valve was leaking approximately 2 3 gpm, The valve was backseated and repacked to correct the leak.
In addition, to correct a high vibration problem that existed on Condensate Booster Pump <<IA>>, pump skid supports were added and additional vibration Instruments were installed to monitor the repair.
The maintenance activities were completed and the unit was restored to full load, F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) Flic (NUREG-0161)
Exhibit I Same Source MEM/DATAREPa/5/OS4