Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000507/2006010 + (11:21:50, 7 January 2025)
- ML18011A953 + (11:21:52, 7 January 2025)
- ML18011A954 + (11:21:52, 7 January 2025)
- HNP-95-056, Provides Suppl Info Re CP&L 950330 Application for Amend to License NPF-63,revising EDG SRs to Address NRC Questions Communicated on 950510 + (11:21:53, 7 January 2025)
- HNP-95-063, Withdraws 930820 Request to Revise TS 3/4.4.5, SGs to Allow Repair of Degraded SG Tubes by Sleeving as Alternative to Removing Tube from Svc by Plugging + (11:21:55, 7 January 2025)
- ML18011A950 + (11:21:55, 7 January 2025)
- HNP-95-060, Responds to NRC Re Violation Noted in Insp Rept 50-400/95-08.Corrective Actions:Individual Involved in Incident Cited Received One on One Training on Plant Administrative Procedure AP-002,Section 5.32.3 + (11:21:57, 7 January 2025)
- ML18011A947 + (11:21:59, 7 January 2025)
- HNP-95-061, Forwards Plant IPEEE Final Rept in Response to GL 88-20, Suppl 4 + (11:22:00, 7 January 2025)
- HNP-95-059, Forwards Plant Response to GL 95-03, Circumferential Cracking of SG Tubes + (11:22:02, 7 January 2025)
- ML18011A941 + (11:22:04, 7 January 2025)
- 05000400/LER-1995-003-01, :on 950518,deficiency Identified in Testing Method for Cooling Water Supply Valves for ESW Intake Structure.Caused by Deficient TS Sps.Surveillance Test Procedures OST-1214 & OST-1215 Revised + (11:22:08, 7 January 2025)
- 05000400/LER-1995-004-01, :on 950524,identified Possibility That Blown Fuse in Control Power Circuit Could Affect Hydraulic Pump. Caused by Discrepancy Between Circuit Wiring & Diagrams for Control Board Alarm.Drawing Review Completed + (11:22:10, 7 January 2025)
- IR 05000400/1995009 + (11:22:19, 7 January 2025)
- ML18011A936 + (11:22:21, 7 January 2025)
- ML18011A935 + (11:22:21, 7 January 2025)
- ML18011A934 + (11:22:22, 7 January 2025)
- ML18011A931 + (11:22:25, 7 January 2025)
- IR 05000400/1995007 + (11:22:29, 7 January 2025)
- ML18011A928 + (11:22:31, 7 January 2025)
- ML18011A927 + (11:22:32, 7 January 2025)
- ML18011A926 + (11:22:33, 7 January 2025)
- IR 05000400/1995004 + (11:22:34, 7 January 2025)
- IR 05000400/1995006 + (11:22:38, 7 January 2025)
- ML18011A922 + (11:22:39, 7 January 2025)
- IR 05000305/2004008 + (11:22:47, 7 January 2025)
- HNP-95-048, Monthly Operating Rept for Apr 1995 for Shnpp + (11:22:49, 7 January 2025)
- ML18011A918 + (11:22:49, 7 January 2025)
- HNP-95-049, Forwards Rev to NPDES Permit,Changing Monitoring Frequency for Several Effluent Characteristics from Daily to Three Times Per Wk for Plant Outfall 002 + (11:22:52, 7 January 2025)
- ML18011A916 + (11:22:52, 7 January 2025)
- HNP-18-007, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Supplement Regarding De Minimis Penetrations + (11:22:54, 7 January 2025)
- HNP-95-050, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/95-04.Corrective Action:Procedure CM-10113 Was Revised on 950213 to Incorporate Line/Load Regulation & AC Ripple During Bench Testing of Sspc Power Supplies + (11:22:55, 7 January 2025)
- ML18011A908 + (11:22:57, 7 January 2025)
- ML18011A907 + (11:22:58, 7 January 2025)
- ML18011A904 + (11:22:59, 7 January 2025)
- ML18011A902 + (11:23:00, 7 January 2025)
- IR 05000400/1995002 + (11:23:01, 7 January 2025)
- ML18011A900 + (11:23:01, 7 January 2025)
- HNP-95-039, Forwards Revised TS Pages VI (Index) & B 3/4 3-6 (Bases), Reflecting Changes Issued W/Amend 55,as Well as Proposed Changes in CP&L 940819 Submittal Re Radiological Effluent Tech Specs + (11:23:02, 7 January 2025)
- HNP-95-038, Informs That CP&L Intends to Implement Formal Industry Position on Severe Accident Mgt at Shnpp.Cp&L Intends to Complete Assessment of Severe Accident Mgt Capabilities & Make Identified Enhancements by 981231 + (11:23:04, 7 January 2025)
- ML18011A894 + (11:23:06, 7 January 2025)
- ML18011A895 + (11:23:06, 7 January 2025)
- ML18011A893 + (11:23:07, 7 January 2025)
- ML18011A892 + (11:23:08, 7 January 2025)
- ML18011A890 + (11:23:09, 7 January 2025)
- ML18011A891 + (11:23:09, 7 January 2025)
- ML18011A889 + (11:23:10, 7 January 2025)
- ML18011A888 + (11:23:10, 7 January 2025)
- ML18011A886 + (11:23:11, 7 January 2025)
- HNP-95-040, Monthly Operating Rept for Mar 1995 for Shearon Harris Nuclear Power Plant + (11:23:12, 7 January 2025)
- ML18011A881 + (11:23:21, 7 January 2025)
- ML18011A878 + (11:23:22, 7 January 2025)