PRIORITY 1
ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9506200091 DOC.DATE: 9~
NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.
Carolina Power 6 Light Co.
ROBINSON,W.R.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000400 P
SUBJECT:
Mont operating rept for May 1995 for Shearon Harris NPP.
W 506 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR I ENCL I SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES:Application for permit renewal filed.
0 05000400 R
RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL:
CRS.
NZE~
NRR/DOPS/OECB EXTERNAL LITCO BRYCE IJ H
NRC PDR COPIES LTTR ENCL 1
1 10 10 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1
1 1
1
,1 1
1 1
1 1
D, 0
C U
N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCU~IENTCONTROL DESK, ROOM Pl-37 (EXT. S04-2083
) TO ELIhtlNATE YOUR NAME FROil DISTRIBUTIONLISTS I:OR DOCUMENTS YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 20
'4 CÃbKD Carolina Power R Light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant JUN 1 4'1995 File: HO950200 Serial HNP-95-057 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATIONS REPORT Gentlemen:
In accordance with Technical Specification 6.9.1.5 for the Shearon Harris Nuclear Power Plant, Carolina Power A Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1995.
Sincerely, W. R. Ro inson SGR/ljw Enclosure c:
Mr. S. D. Ebneter (NRC-RII)
Mr. S. A. Elrod (NRC-SHNPP)
Mr. N. B. Le (NRR) 9506200091 950531 PDR ADQCK 05000400 R
PDR MIS/MTH-OPR.RPT/1 State Road1134 NewHill NC Tel 919362-2502 Fax 919362-2095
f
~~y '
Enclosure to Serial HNP-95-057 Sheet 1 of 2 CP&L CO RUN DATE 06/08/95 RUN TIME 13:49:52 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1
RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHBZLA ROGERS TELEPHONB (919)362-2573
- 1. UNIT NAME:
HARRIS UNIT 1 NOTES I
2.
REPORTING PERIOD:
MAY 95 I
I 3 ~
LICENSED THERMAL POWER (MWT): 2775 I
I 4.
NAMEPLATE RATING (GROSS MWE): 950. 9 I
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 900. 0 I
6.
MAX DEPENDABLE CAPACITY (GROSS MWB): 920.0 I
7.
MAX DBPENDABLE CAPACITY (NET MWE): 860. 0
- 8. IP CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GZVB REASONS:
9.
POWBR LEVBL TO WHICH RESTRICTED IP ANY (NET MWB):
10.
REASONS FOR RESTRICTION IF ANY:
THIS MONTH YR TO DATE CUMUL ATIVB 11.
HOURS IN RBPORTING PERIOD 744.00 3623.00 70848.00 12.
NUMBER OP HOURS REACTOR CRITICAL 744.00 3623.00 59172.85 13.
REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00 14.
HOURS GENERATOR ON LINE 744.00 3623.00 58597.07 15.
UNIT RESERVE SHUTDOWN HOURS 00
.00
.00 16.
GROSS THERMAL ENERGY GEN.
(MWH) 2058885.72 9848255.22 156663546.30 17.
GROSS ELEC.
ENERGY GEN.
(MWH) 680149.00 3275062.00 52198588.00 18 'ET ELEC.
ENERGY GENERATED (MWH) 639728.00 3073374.00 48664028.00
- 19. UNIT SERVICE FACTOR 100. 00 100. 00
- 82. 71
- 20. UNIT AVAILABILITYFACTOR 100.00 100. 00
- 82. 71
- 21. UNIT CAP.
FACIOR (USING MDC NBT) 99.98 98.64 79.87
- 22. UNIT CAP.
PACTOR (USING DER NET) 95.54 94.26 76.32 23.
UNZT FORCED OUTAGE RATE
.00
.00 2'4 24
~
SHUTDOWNS SCHED ~
OVER NEXT 6 MONTHS (TYPBg DATSUN AND DURATION OP EACH)
Unit scheduled for shutdown on September 2,
1995 for refueling outage number 6.
Planned duration of outage is 40 days.
25.
ZF SHUTDOWN AT END OF REPORT
- PERZOD, ESTIMATED DATB OP START UP:
26
~
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY
~CIAL OPERATION Nag/MTH-OPR.RPT/3
~
~
V j'
Enclosure to Serial HNP-95-057 Sheet 2 of 2 CPRL CO PLANT PBRFORMANCE DATA SYSTEM RUN DATE 06/08/95 APPENDIX B - AVERAGE DAILY POWER LEVEL RUN TIME 13:49:52 HARRIS UNIT 1 PAGE 1
RPD39-000 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362 2573 1995 DAY AVE DAILY POWER LEVEL (MWB NET)
DAY AVG. DAILY POWER LEVEL (MWB-NET) 870 17 853 872 18 848 873 19 857 868 20 868 862 21 865 22 862 867 23 861 866 24 858 860 25 855 10 853 26 855 851 861 12 862 28 865 13 860 29 853 837 30 855 15 854 31 862 16 858 Note:
There were no significant power reductions for the month of May.
HIS/HTH-OPR. RPT/4