Text
cpa.<OR.n Y Z REGULATOR'8 Ct@Rf&L5MNE555RAEBTION SYSTEM
( RIDS )
ACCESSION NBR:9505180021 DOC.DATE: 95/04/28 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION VERRELLI,D.M.
Region 2 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION ROBINSON,W.R.
Carolina Power s Light Co.
DOCKET N
05000400
SUBJECT:
Advises of results of recent performance review at plant to determine if present planned insp effort for rest of current SALP cycle should be revised before end date of 960316.List of plant scheduled insps encl.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR I ENCL SIZE:
I TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN2 FILE 01 EXTERNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEODp4PP ILE CENTE NRR DORS OEAB NUDOCS-ABSTRACT OGC/HDS2 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 VOTE TO ALL"RIDS" RECIPIENTS:,
PLEASE HELP US TO REDUCE i'PASTE! COi'TACTTHE DOCL'~IEi'TCONTROL DESK, ROOiI PI -37 (EXT. 504-0033 I TO ELIi!IRATE YOUR i'AWE FROiI DISTRIIIUTI04 LISTS FOR DOCUNIEATS YOL'Oi "I' EED!
TOTAL NUMBER OF COPIES REQUIRED: ITTR 19 ENCL 19
April 28, 1995 Carolina Power
& Light Company ATTN:
Nr. M. R. Robinson Vice President
- Harris Plant Shearon Harris Nuclear Power Plant P. 0.
Box 165, Hail Code:
Zone 1
New Hill, NC 27562-0165
SUBJECT:
PLANT PERFORMANCE REVIEW - HARRIS
Dear Hr. Robinson:
On March 13,
- 1995, NRC managers met to review recent performance at the Harris facility to determine if our present planned inspection effort for the rest of the current SALP cycle should be revised before its end date of March 16, 1996.
The purpose of this letter is to advise you of the results of that review.
At Harris we determined that an additional ALARA unscheduled inspection should be conducted based on recent events which included movement of incore detectors without evacuating personnel from containment, control of high radiation area locked doors and a contamination event outside the Radiological Control Area.
This inspection was conducted on April 10-14, 1995.
Enclosure 1 is a list of all planned inspection activities for the remainder of the SALP cycle which ends Narch 16, 1995.
It is our intent to continue semiannual performance reviews in addition to SALP and advise you of the results.
Should you have any questions concerning this letter, please contact us.
Sincerely, Docket No.:
50-400 License No.:
NPF-63 David H. Ver elli, Chief Reactor Projects Branch lA Division of Reactor Projects
Enclosure:
Inspection Plans cc w/encl:
(See page 2) 9505i8002i 950428 PDR ADOCK 05000400 8
CPKL cc w/encl:
H.
W. Habermeyer, Jr.
Vice President Nuclear Services Department Carolina Power 5 Light Company P. 0.
Box 1551
- Hail OHS7
- Raleigh, NC 27602 J.
W. Donahue Plant Hanager
- Harris Plant Carolina Power 5 Light Company Shearon Harris Nuclear Power Plant P. 0.
Box 165, NC:
Zone 1
New Hill, NC 27562-0165 R.
E. Jones General Counsel
- Legal Department Carolina Power and Light Co.
P. 0.
Box 1551
- Raleigh, NC 27602 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Commerce
& Natural Resources P. 0.
Box 27687
- Raleigh, NC 27611-7687 Karen E.
Long Assistant Attorney General State of North Carolina P. 0.
Box 629
- Raleigh, NC 27602 Public Service Commission State of South Carolina P. 0.
Box 11649
- Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. 0.
Box 29510
- Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC P. 0.
Box 29520
- Raleigh, NC 27626 Distribution w/encl:
(See page 3)
CP&L Distribution w encl:
D. Verrelli, RII N. Le, NRR G. A. Hallstrom, RII PUBLIC NRC Resident Inspector U. S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, NC 27562-9998 OFFICE RII:DRP SIGNATURE DVerrelli:tj NAME 04/
/95 YES NO DATE 04 /
/95 YES NO 04/
/95 YES NO COPY)
OFFICIAL RECORD COPY OOCUIIEIIT IIAHE:
P: iHARRIS. PPR 04/
/95 YES NO 04/
/95 04/
/95 YES NO YES NO
HARRIS SCHEDULED INSPECTIONS SALP CYCLE 12 Two Resident Inspectors
- Routine Monthly Inspections Radiological Effluents and Chemistry (May 15-19, 1995)
Risk-based Operational Safety and Performance Assessment (May 22-26, 1995)
Initial Exams (June 26-30, 1995)
Emergency Planning (October 16-20, 1995)
Engineering Physical Security ISI (during 9/95 outage)
Date To Be Determined ENCLOSURE