ML18011A900
| ML18011A900 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/30/1995 |
| From: | CAROLINA POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML18011A899 | List: |
| References | |
| NUDOCS 9504240096 | |
| Download: ML18011A900 (4) | |
Text
ENCLOS TO SERIAL: HNP-95-039 SHEARON HARMS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 RADIOLOGICALEFFLUENT TECHNICALSPECIFICATIONS TECHNICALSPECIFICATION PAGES 950424009b 950330 PDR ADOCK 05000400 PDR'
~
~
A
~
Q rwv
~
LIHITING CONDITIONS FOR OPERATION AND SURVEILLANCE RE UIREHENTS SECTION TABLE 3.3-6 TABLE 4.3-3 TABLE 3.3-7 TABLE 4.3-4 TABLE 3.3-8 TABLE 4.3-5 TABLE 3.3-9 TABLE 4.3-6 TABL'E 3.3-10 TABLE 4.3-7 RADIATION MONITORING INSTRUHENTATION FOR PLANT OPERATIONS RADIATION MONITORING INSTRUMENTATION FOR PLANT OPERATIONS SURVEILLANCE REQUIREMENTS Movable Incore Detectors Seismic Instrumentation SEISMIC HONITORING INSTRUHENTATION.
SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS Heteorological Instrumentation METEOROLOGICAL MONITORING INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION SURVEI REQUIREMENTS Remote Shutdown System REMOTE SHUTDOWN SYSTEM REMOTE SHUTDOWN MONITORING INSTRUHENTATION SURVEILLANCE REQUIREMENTS Accident Monitoring Instrumentation ACCIDENT MONITORING INSTRUMENTATION ACCIDENT MONITORING INSTRUMENTATION SURVEILLANCE LLANCE PAGE 3/4 3-51 3/4 3-54 3/4 3-56 3/4 3-57 3/4 3-58 3/4 3-59 3/4 3-60 3/4 3-61 3/4 3-62 3/4 3-63 3/4 3-64 3/4 3-65 3/4 3-66 3/4 3-68 TABLE 3.3-11 TABLE 3.3-13 REQUIREMENTS (DELETED)
Metal Impact Monitoring System
~
~
(DELETED)
Explosive Gas Monitoring Instrumentation EXPLOSIVE GAS MONITORING INSTRUMENTATION 3/4 3-70 3/4 3-73 3/4 3-74 3/4 3-75 3/4 3-82 3/4 3-83 TABLE 4.3-9 EXPLOSIVE GAS MONITORING INSTRUMENTATION 3/4.3.4 SURVEILLANCE REQUIREMENTS DELETED 3/4 3-86 3/4 3-89 SHEARON HARRIS
- UNIT 1 vi Amendment No.
INSTRUMENTATION BASES 3/4.3.3.11 EXPLOSIVE GAS MONITORING INSTRUMENTATION This instrumentation provides for monitoring and controlling the concentrations of potentially explosive gas mixtures in the GASEOUS RADWASTE TREATMENT SYSTEM.
The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria 60, 63, and 64 of Appendix A to 10 CFR Part 50.
3/4.3.4 DELETED SHEARON HARRIS
- UNIT 1 B 3/4 3-6 Amendment No.