Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011B085 + (11:19:18, 7 January 2025)
- HNP-95-118, Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant + (11:19:19, 7 January 2025)
- ML18011B083 + (11:19:19, 7 January 2025)
- HNP-95-093, Notifies of Intent to Convert Current TS for Plant to Improved STS Using NUREG-1431,STS Westinghouse Plants + (11:19:21, 7 January 2025)
- HNP-95-108, Forwards Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. Attachment to Ltr Provides Revised Pages W/Corrected Values + (11:19:23, 7 January 2025)
- ML18011B080 + (11:19:23, 7 January 2025)
- 05000400/LER-1995-012-01, :on 951110,containment pre-entry Purge Valve 1CP-1 Drifted Open During Mode-1 Power Operation.Caused by Inadequate Means to Ensure That Air Operated Valves Sealed Closed.Aligned Instrument Air Sys + (11:19:26, 7 January 2025)
- HNP-95-077, Provides Addl Info Re Removal of Some MOVs from GL 89-10 Program & Provides Change in HNP GL 89-10 Program Commitment Re Periodic Verification + (11:19:27, 7 January 2025)
- 05000400/LER-1995-011-01, :on 951105-06,reactor Trip/Si Signal Generated & Unplanned ESF Actuation Occurred During Troubleshooting. Reactor Trip Caused by Equipment Failure.Component Replaced + (11:19:29, 7 January 2025)
- IR 05000400/1995016 + (11:19:32, 7 January 2025)
- ML18011B072 + (11:19:33, 7 January 2025)
- HNP-95-116, Responds to NRC Re Violations Noted in Insp Rept 50-400/95-15.Corrective Actions:Revised Post Maint Inspection Procedure to Enhance Process for Administering Equipment Inoperable Records + (11:19:34, 7 January 2025)
- 05000400/LER-1995-006, :on 950824,ECCS Sys Piping Was Not Fully Contained within RAB Emergency Exhaust Sys Boundary Resulted in Condition Outside Design Basis.Periodically Inspected Affected Piping for Leakage + (11:19:36, 7 January 2025)
- ML18011B069 + (11:19:44, 7 January 2025)
- TAC:M94101 + (11:19:45, 7 January 2025)
- ML18011B067 + (11:19:45, 7 January 2025)
- HNP-95-107, Requests Approval to Use Amse Code Case N-416-1 + (11:19:46, 7 January 2025)
- HNP-95-100, Responds to GL 93-04 Re Rod Control Sys Current Order Timing Mod Installation & Testing Completion + (11:19:48, 7 January 2025)
- ML18011B064 + (11:19:48, 7 January 2025)
- HNP-95-101, Responds to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (11:19:50, 7 January 2025)
- 05000400/LER-1995-010-01, :on 951012,RT Occurred on Turbine Trip Due to Operator Error During Performance of Turbine Mechanical Overspeed Test.Enhanced Switch Marking & Addl Training for Operating Crews on Command,Control & Teamwork + (11:19:53, 7 January 2025)
- HNP-95-098, Provides Info Per 10CFR50.46(a)(3(ii) for HNP Re Change in ECCS Evaluation Model + (11:19:54, 7 January 2025)
- ML18011B059 + (11:19:56, 7 January 2025)
- IR 05000903/2010007 + (11:19:57, 7 January 2025)
- ML18011B055 + (11:19:59, 7 January 2025)
- IR 05000400/1995014 + (11:20:03, 7 January 2025)
- HNP-95-102, Monthly Operating Rept for Oct 1995 for Shearon Harris Nuclear Power Plant + (11:20:05, 7 January 2025)
- ML18011B050 + (11:20:05, 7 January 2025)
- 05000400/LER-1995-009-01, :on 951005,unanticipated Actuation of ESF Components While in Refueling Outage 6 Due to Defective Retest Procedure.Revised Temporary Procedure to Reset SI Signal + (11:20:08, 7 January 2025)
- RAIO-0118-58130, LLC Response to NRC Request for Additional Information No. 281 (Erai No. 9082) on the NuScale Design Certification Application + (11:20:09, 7 January 2025)
- HNP-95-096, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (11:20:11, 7 January 2025)
- PNO-II-95-064, on 951105,during Quarterly Testing of Automatic Actuation Logic & Relays of Main Steam Line Isolation Portion of ESF Instrumentation Test Relay Failure Caused Unexpected Closure of MSIV a + (11:20:14, 7 January 2025)
- ML18011B043 + (11:20:15, 7 January 2025)
- HNP-95-094, Informs That Personnel from Util Will Attend NRC GL 95-07 Meeting on 951024 in Atlanta,Ga to Discuss & Clarify Various Aspects Re Issue + (11:20:23, 7 January 2025)
- PNO-II-95-059, on 951020,Unit 1 Commenced Normal Shutdown in Excess of 72 H,To Repair body-to-bonnet Leak on Main Feedwater Isolation Valve.Resident Inspector Responded to Site & Monitored Activities Throughout Weekend + (11:20:23, 7 January 2025)
- HNP-95-085, Provides Addl Info Requested by NRC Re GL 95-03, Circumferential Cracking of SG Tubes + (11:20:25, 7 January 2025)
- ML18011B039 + (11:20:28, 7 January 2025)
- ML18011B038 + (11:20:29, 7 January 2025)
- HNP-95-089, Submits Plant Rev 1 to COLR in Support of Cycle 7 Operations Per Requirements of HNP TS 6.9.1.6.4 + (11:20:30, 7 January 2025)
- ML18011B037 + (11:20:30, 7 January 2025)
- ML18011B032 + (11:20:33, 7 January 2025)
- ML18011B031 + (11:20:33, 7 January 2025)
- HNP-95-090, Submits Addl Info Re RAB Emergency Exhaust Sys Design & Licensing Basis Issues + (11:20:34, 7 January 2025)
- ML18011B028 + (11:20:36, 7 January 2025)
- HNP-95-002, Monthly Operating Rept for Sept 1995 for Harris Nuclear Plant + (11:20:37, 7 January 2025)
- ML18011B027 + (11:20:37, 7 January 2025)
- ML18011B025 + (11:20:39, 7 January 2025)
- ML18011B023 + (11:20:40, 7 January 2025)
- ML18011B022 + (11:20:41, 7 January 2025)
- 05000400/LER-1995-006-01, :on 950824,determined Discrepancy Re Design of RAB EES Constituted Condition Outside Design Basis.Cause Still Under Investigation.Established Administrative Leakage Limit of 1 Gallon Per Hour + (11:20:42, 7 January 2025)
- HNP-95-083, Discusses Reactor Auxiliary Bldg Emergency Exhaust Sys Design & Licensing Basis Issues.Description of Proposed Changes to FSAR Which Incorporate Results of Dose Assessment Reanalysis & Details of Administrative Controls Encl + (11:20:43, 7 January 2025)
- ML18011B019 + (11:20:45, 7 January 2025)