PRIORITY 1 (ACCELERATED RIDS PROCESSING)

RESULATORY INFORMATION DISTRIBUTION SYSTEM (RIBS)

ACCESSION NBR:9510180021 DOC.DATE: gl09fiÃi NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,S.G.

Carolina Power

& Light Co.

ROBINSON,W.R.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000400 P

SUBJECT:

Monthly ing rept for Sept 1995 for Harris Nuclear Plant.W 51012 ltr.

DISTRIBUTION 'CODE:

IE24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per-Tech Specs)

NOTES:Application for permit renewal filed.

05000400 I

RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS E~eE R

1 P

CB EXTERNAL LITCO BRYCE IJ H

NRC PDR COPIES LTTR ENCL 1

1 10 10 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DISP/PIPS RGN2 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

D' N

NOTE,,TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL

DESK, ROOM OWFN 5D8 (415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

Carolina Power &light Company PO Box 165 New Hill NC 27562 William R. Robinson Vice President Harris Nuclear Plant OCT 12 1995 SERIAL: HNP-95-092 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR PO iVER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power Ec Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1995.

Sincerely, SGR Enclosure c:

Mr. S. D. Ebneter (NRC-RII)

Mr. S. A. Elrod (NRC-SHNPP)

Mr. N. B. Le (NRR) f 9510180021 950930

(

PDR ADOCK 05000400 R.... P.DR, State Road1134 New'Hill Nl tei it9362-2502 Fax 919362.2095

~

e 4

Enclosure to Serial HNP-95-092 Sheet 1 of 4 CP&L CO.

RUH DATE 10/05/95 RUN TIME 12:46:29 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE 1

RPD36.000 OPERATIHG STATUS

1. UNIT NAME:

HARRIS UNIT 1

DOCKET NO. 050.400 COMPLETED BY SHEILA ROGERS TELEPHOHE (919)362-2573 I

NOTES 2.

REPORTING PERIOD:

SEPTEMBER 95 t

3.

LICENSED THERMAL POWER (HWT):

2775 4

NAMEPLATE RATING (GROSS MWE)'50 9 I

5.

DESIGN ELECTRICAL RATING (NET MWE):

900.0 I

6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I

7.

MAX DEPENDABLE CAPACITY (NET MWE):

860.0 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEHS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10.

REASONS FOR RESTRICTION IF AHY:

l I

I I

I THIS MONTH YR TO DATE CUHUL ATIVE 11.

HOURS IN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE

15. UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEN.

(MWH) 17.

GROSS ELEC ~

ENERGY GEN (MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UHIT AVAILABILITYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC NEI')

22.

UNIT CAP.

FACTOR (USING DER NET)

23. UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 720.00 24.50

.00 24.00

.00 41958.00 14160.00 4070.00 3.33 3.33

.66

.63

.00 (TYPE, DATE, 6551.00 5855.50

.00 5855.00

.00 15697859.76 5185528.00 4851147.00 89.38 89.38 86.11 82.28

.00 AND DURATION OF EACH):

73776.00 61405.35

.00 60829.07

.00 162513150.84 54109054.00 50441801.00 82.45 82.45 79.50 75.97 2.64 Unit Mas shutdoMn on September 2,

1995 for refueling outage number 6.

Planned duration of outage is 40 days.

25.

IF SHUTDOWN AT END OF REPORT

PERIOD, ESTIMATED DATE OF START UP: October 10, 1995.
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

b

Enclosure to Serial HNP-95-092 Sheet 2 of 4 CP&L CO.

PLANT PERFORMANCE DATA SYSTEM RUN DATE 10/05/95 APPENDIX 8 - AVERAGE DAILY POWER LEVEL RUN TIME 12:46:29 HARRIS UNIT 1

PAGE 1

RPD39.000 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS'ELEPHONE (919)362-2573 SEPTEMBER 1995 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 16 536

-34

-32

-30

-15

-9

-12

-12

-12

-12

-10

-9

-10 17 18 19 20 21 22 23 24 25 26 27 28 29 30

-10

-10

-10

-10

-10

-10

-10

-10

-7

-8

-6

-12

-13

E T

UNITSHUTDOWNS ANDPOWER REDUCTION REPORT MONTH UNITNAME:

Harris DATE:

to/os/95 COhIPLETED BY: S. G. Rogers TELEPHONE:

(919) 362-2573 NUMBFR DATE TYPE DURATION HOURS RFASON METHODOF SHUITINGDOWN RF.ACTOR LICENSEE EVENT RFPORT//

SYSTEM CODE 4 COhlPONENT CODE 5 CAUSE AND CORRECTIVE ACTIONTO PREVENT RECURRENCE 954104 950801 0.0 N/A Unit is coasting down for RFO//6.

Coastdown duc to high capacity factors during previous

cycle, attempts to maximize fuel economy and previous cstablishcd outage schcdulc.

I F: Forced S: Schcdulcd 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction

&Operator Training 8e License Examination F-Adnuntstrat tvc G43perational Error (Explain)

H4)ther (Explain) 3 hlethod:

I-Manual 2-Manual Scram 3-Automatic Scram 4~ntinucd 5-Rcduccd Load 64)ther 4

Exhibit G-Instructions for Preparation ofData Entry Sheets for Licensee Event Report (LER) File (NUREG4)161) 5 Exhibit I - Same Source tn tn trI W tn e 8 0 e v. e rr tu 0 k

to 4l I

05 tn I

Alo 0 Io

UNITSHVfDOWNS ANDPOWER RFDUCTION REPORT MONTH UNITNAME:

Harris DATE:

to/o5/>5 COMPLETED BY: S. G. Rogers TELEPHONE:

(919) 362-2573 NUMBER 95405 DATF.

950902 TYPF.

DURATION HOURS 696.0 REASON METHODOF SHUITINGDOWN RFACTOR LICENSEE EVENT REPORT//

N/A SYSTEM CODE4 COMPONENT CODF. 5 CAUSE AND CORRECTIVE ACTIONTO PREVENT RECURRENCE Unit was shutdown on 09/02/95 for RFO6. Planned duration ofoutage is 40 da>s.

.I F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C.Refueling D-Regulatory Restriction F Operator Training dt, Liccnsc Examination F-Administrate G~tional Error (Explain)

H4)ther (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4~tinued 5-Reduced Ibad 6~cr 4

Exhibit G-Instructions for Preparation ofData Entry Sheets for Licensee Event Rcport (LER) File (NUREG41 161) 5 Exhibit I - Same Source