Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18011B125 + (11:18:35, 7 January 2025)
- ML18011B124 + (11:18:36, 7 January 2025)
- ML18011B123 + (11:18:38, 7 January 2025)
- 05000400/LER-1995-016-01, :on 951228,unplanned Esf/Rps Actuation Occurred Due to Unexpected Opening of a RT Breaker During Testing. Caused by Inadequate Procedure.Revised Procedure & Trained Appropriate Personnel + (11:18:39, 7 January 2025)
- IR 05000400/1995017 + (11:18:40, 7 January 2025)
- TAC:M74418 + (11:18:42, 7 January 2025)
- ML18011B120 + (11:18:42, 7 January 2025)
- ML18011B118 + (11:18:43, 7 January 2025)
- IR 05000400/1995020 + (11:18:45, 7 January 2025)
- ML18011B115 + (11:18:46, 7 January 2025)
- ML18011B114 + (11:18:47, 7 January 2025)
- ML18011B113 + (11:18:48, 7 January 2025)
- ML18011B111 + (11:18:49, 7 January 2025)
- ML18011B110 + (11:18:50, 7 January 2025)
- TAC:M93342 + (11:18:50, 7 January 2025)
- 05000400/LER-1995-013, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/95-18.Corrective Actions:Reported Failure to Perform Offsite Power Availibility Verification within One H in LER 95-013 + (11:18:52, 7 January 2025)
- HNP-96-002, Forwards Inservice Inspection Summary, for Shnpp.Rept Covers Inspections Performed During Cycle 6 Operations Including Refueling Outage 6,in First Insp Interval + (11:18:53, 7 January 2025)
- ML18011B106 + (11:18:55, 7 January 2025)
- IR 05000400/1995015 + (11:18:56, 7 January 2025)
- ML18011B104 + (11:18:57, 7 January 2025)
- ML18011B103 + (11:18:58, 7 January 2025)
- ML18011B101 + (11:18:59, 7 January 2025)
- 05000400/LER-1995-014-01, :on 940424,RHR Sys Components Removed from Service as Directed During Testing,While Required for Operability.Caused by Procedure Inadequacies.Test Will Be Revised to Correct Procedure by 960215 + (11:19:00, 7 January 2025)
- ML18011B099 + (11:19:02, 7 January 2025)
- 05000400/LER-1995-013-01, :on 951009,Tech Spec Violation Due to Not Performing off-site Verification.Caused by Cognitive Personnel Error.Individuals Counseled + (11:19:06, 7 January 2025)
- HNP-96-001, Monthly Operating Rept for Dec 1995 for Shnpp + (11:19:07, 7 January 2025)
- HNP-95-126, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/95-17.Corrective Actions:Completed Engineering Svc Request & Installed Permanent Switch Position + (11:19:09, 7 January 2025)
- HNP-95-127, Revises Commitments Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (11:19:11, 7 January 2025)
- ML18011B090 + (11:19:14, 7 January 2025)
- ML18011B088 + (11:19:15, 7 January 2025)
- ML18011B086 + (11:19:17, 7 January 2025)
- ML18011B085 + (11:19:18, 7 January 2025)
- HNP-95-118, Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant + (11:19:19, 7 January 2025)
- ML18011B083 + (11:19:19, 7 January 2025)
- HNP-95-093, Notifies of Intent to Convert Current TS for Plant to Improved STS Using NUREG-1431,STS Westinghouse Plants + (11:19:21, 7 January 2025)
- HNP-95-108, Forwards Revised Semi-Annual Effluent Release Rept for Period of Jul-Dec 1994. Attachment to Ltr Provides Revised Pages W/Corrected Values + (11:19:23, 7 January 2025)
- ML18011B080 + (11:19:23, 7 January 2025)
- 05000400/LER-1995-012-01, :on 951110,containment pre-entry Purge Valve 1CP-1 Drifted Open During Mode-1 Power Operation.Caused by Inadequate Means to Ensure That Air Operated Valves Sealed Closed.Aligned Instrument Air Sys + (11:19:26, 7 January 2025)
- HNP-95-077, Provides Addl Info Re Removal of Some MOVs from GL 89-10 Program & Provides Change in HNP GL 89-10 Program Commitment Re Periodic Verification + (11:19:27, 7 January 2025)
- 05000400/LER-1995-011-01, :on 951105-06,reactor Trip/Si Signal Generated & Unplanned ESF Actuation Occurred During Troubleshooting. Reactor Trip Caused by Equipment Failure.Component Replaced + (11:19:29, 7 January 2025)
- IR 05000400/1995016 + (11:19:32, 7 January 2025)
- ML18011B072 + (11:19:33, 7 January 2025)
- HNP-95-116, Responds to NRC Re Violations Noted in Insp Rept 50-400/95-15.Corrective Actions:Revised Post Maint Inspection Procedure to Enhance Process for Administering Equipment Inoperable Records + (11:19:34, 7 January 2025)
- 05000400/LER-1995-006, :on 950824,ECCS Sys Piping Was Not Fully Contained within RAB Emergency Exhaust Sys Boundary Resulted in Condition Outside Design Basis.Periodically Inspected Affected Piping for Leakage + (11:19:36, 7 January 2025)
- ML18011B069 + (11:19:44, 7 January 2025)
- TAC:M94101 + (11:19:45, 7 January 2025)
- ML18011B067 + (11:19:45, 7 January 2025)
- HNP-95-107, Requests Approval to Use Amse Code Case N-416-1 + (11:19:46, 7 January 2025)
- HNP-95-100, Responds to GL 93-04 Re Rod Control Sys Current Order Timing Mod Installation & Testing Completion + (11:19:48, 7 January 2025)
- ML18011B064 + (11:19:48, 7 January 2025)
- HNP-95-101, Responds to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (11:19:50, 7 January 2025)