ML18011B123

From kanterella
Jump to navigation Jump to search
Summarizes 960111 Meeting W/Util Re Status of self- Assessments & Ongoing Actions Re Svc Water.Meeting Attendees & Licensee Handouts Encl
ML18011B123
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/17/1996
From: Fredrickson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robinson W
CAROLINA POWER & LIGHT CO.
References
NUDOCS 9602010168
Download: ML18011B123 (22)


Text

JANUARY 17, 1996 Carolina Power 8 Light Company ATTN:

Mr. W. R. Robinson Vice President

- Harris Plant Shearon Harris Nuclear Power Plant P. 0.

Box 165, Mail Code:

Zone 1

New Hill, NC 27562-0165

SUBJECT:

MEETING

SUMMARY

SHEARON HARRIS NUCLEAR PLANT SERVICE WATER SELF-ASSESSMENT RESULTS P

Dear Mr. Robinson:

This refers to the meeting conducted at your request at our Region II Office on January 11, 1996.

The purpose of the meeting was to discuss the status of your self-assessments and ongoing actions concerning service water.

It is our opinion that this meeting was beneficial to us in aiding our understanding of your ongoing engineering programs.

In accordance with section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this matter, please contact us.

Sincerely, ORIGINAL SIGNED BY PAUL FREDRICKSON

Enclosures:

1. Meeting Attendees
2. Licensee Handout cc w/encls:

J.

Cowan, Manager Operations

& Environmental Support MS OHS7 Carolina Power

& Light Company P. 0.

Box 1551

Raleigh, NC 27602 9602010l68 9601l7 PDR ADQCK 05000400 P

PDR (cc w/encls cont'd - See page 2)

Paul E. Fredrickson, Chief Special Inspection Branch Division of Reactor Safety

CP&L (cc w/encls cont'd)

J.

W. Donahue Plant Manager

- Harris Plant Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P. 0.

Box 165, MC:

Zone 1

New Hill, NC 27562-0165 T.

D. Walt, Manager Regulatory Affairs Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant P. 0.

Box 165, Mail Zone 1

New Hill, NC 27562-0165 R.

E. Jones General Counsel

- Legal Department Carolina Power

& Light Company P. 0.

Box 1551

Raleigh, NC 27602 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental Commerce

& Natural Resources P. 0.

Box 27687

Raleigh, NC 27611-7687 Karen E.

Long Assistant Attorney General State of North Carolina P. 0.

Box 629

Raleigh, NC 27602 Public Service Commission State of South Carolina P. 0.

Box 11649

Columbia, SC 29211 Chairman of the North Carolina Utilities Commission P. 0.

Box 29510

Raleigh, NC 27626-0510 Robert P. Gruber Executive Director Public Staff NCUC P. 0.

Box 29520

Raleigh, NC 27626 (cc w/encls cont'd

- See page 3)

CP&L (cc w/encls cont'd)

Uva Holland, Chairman Board of County Commissioners of Chatham County P. 0.

Box 87 Pittsboro, NC 27312 Distribution w encls:

N. Shymlock, RII N. Le, NRR G. A. Hallstrom, RII Document Control Desk NRC Resident Inspector U. S. Nuclear Regulatory Commission

'421 Shearon Harris Road New Hill, NC 27562-9998 OFFICE RII:DRS RII:DRP RII:DR I:DRS SIGNATURE I7ICPC C NAME KELLO G DATE 01 /

SS 01 /I / 88 FRE ICK ON 01/i

/SS GIB 01/

/Se 01/

/SS 01/

/SS YES NO COPY)

YES YES NO YES 0

OFFICIAL RECORD PY DOCUHEHT HAHE:

S:iDRSKSIBiHTGSUH.HAR YES NO YES NO

MEETING ATTENDEES I

Carolina Power and Light G. Rolfson,

Manager, Harris Engineering Section T. Walt, Manager, Performance Evaluation and Regulatory Affairs D. Alexander, Supervisor, Licensing C. Brown, Supervisor, Support Systems D. Hawley, Senior Engineer W. HcGoun, Project Engineer Nuclear Regulatory Commission A. Gibson, Director, Division of Reactor Safety (DRS)

J.

Brady, Project Engineer, Division of Reactor Projects (DRP)

C. Casto, Breach Chief, DRS H. Christensen, Branch Chief, DRS P. Fredrickson, Branch Chief, DRS H. Shymlock, Branch Chief, DRP P. Kellogg, Project Hanager, DRS T. Lee, Project Manager, Office of Nuclear Reactor Regulation D. Roberts, Resident Inspector, DRP By Telephone ENCLOSURE I

Harris Nuclear Plant Technical Presentation Service Water Systems CP&L January 11, 1996 ENCLOSURE 2

Service Water Systems Pur ose Discuss assessments and ongoing actions for the Harris Nuclear Plant Service Water systems.

COL

Service Water Systems Agenda

~ Assessments Conducted

~ Results and Actions

~ Summary

Service Water Systems Assessments Conducted e Conducted two assessments (Fall 1994)

~ Assessed implementation of GL 89-13 program including a knowledgeable industry consultant

~ Performed Service Water System Operational Performance Inspection (SWSQPI) utilizing utilitylindustryteam of nine individuals in accordance with NRC Tl 2515/118

Service Water Systems o Programmatic Issues

+ Program documentation

+ Test/inspection procedures

+ Program implementation

~ Technical Issues

+ Single failure reviews

+ Ultimate heat sink

+ ESW flow

Service Water Systems Programmatic Issues Issue:

~ Program Documentation Actions:

~ Created living program document to identify scope, responsibility, and controls activities

~ Defined

> esponsibilities for site staff, including program manager CPS.L

Service Water Systems Programmatic Issues Issue

~ Test/Inspection Procedures Actions

~ Revised test/inspection procedures

+ Improved inspection guidance

+ Strengthened acceptance criteria

+ Added guidance for actions ifacceptance criteria not met

~ Training

Issue Service Water Systems Programmatic Issues e Program Implementation Actions

~ Reviewed committed program scope e Completed heat exchanger inspections e Initiated pipe inspections o Reassessed chlorination commitment

Service Water Systems Technical Issues Issue

~ Incomplete single failure reviews of Essential Services Chilled Water (ESCW} and Component Cooling Water (GCW)

Actions o Completed single failure reviews COL

Issue Service Water Systems Technical Issues

~ Ultimate Heat Sink (UHS}

Actions

~ Design basis clarified

+ Architect/Engineer {A/E)Analysis performed analysis

+ Determined maximum allowable UHS temperature to be S4'

{has never been exceeded}

+ Established plant controls

~ Confirmed licensing basis requirements for both auxiliary and main reservoirs CP&.L

Service Water Systems Technical Issues Issue

~ Emergency Service Water (ESW} flow Actions

~ Reviewed ESW thermal and hydraulic design calculations

~ Revised ESW flowtest acceptance criteria based on design calculations

~ ESW tested for new acceptance criteria

~ Determined minimum allowable main reservoir level to be 215 feet

~ Established plant controls COL

Service Water Systems Self-SWSGPI Identified Weaknesses Issue

~ Analyses not initiated for some ESW inspection results Actions

~ Evaluated and determined that specific examples were satisfactory I Revised procedures to provide method of documenting inspections and results to ensure appropriate investigation and resolution CPS.L

Service Water Systems Self-SWSOPI Identified Weaknesses Issue

~ Some calculations revised without complete understanding of the Design Basis Actions

~ Reviewed and revising calculations as necessary; results acceptable

~ Recalculated heat loads for margin refinement

~ Continue other engineering improvement initiatives CPSaL

Service Water Systems Self-SWSOPI Identified Weaknesses Issue o Procedural guidance for operators Actions

~ Completed operations procedure revisions CPtaL

Service Water Systems Self-SWSGPI Identified Weaknesses Issue

~ Surveillance test program implementation Actions

~ Added four valves to IST program o Began assessment of surveillance testing required to satisfy Technical Specifications

- to be completed in Summer 1996 CARL

Service Water Systems Self-SWSOPI Identified Weaknesses Issue

~ Interface between design and other plant groups Actions

~ Addressing identified problems I Implemented "plant engineer" concept

~ Continue other engineering improvement initiatives CPS.L

Service Water Systems Self-SWSOPI Identified Strengths

~ Overall design of the ESW, CCW, and ESCW System

~ Original design calculations and specifications are thorough

~ Ongoing rigorous assessment of and proposed improvements to the GL 89-13 program

~ Material condition and housekeeping

Service Water Systems 8ummar

~ Improved management of program

~ Increased knowledge of system limitations

~ Enhanced monitoringlability to detect degradation

~ Reviewing Technical Specification sUrveillance program

~ Developing recommendations for margin improvement COL