NOTICE OF VIOLATION Carolina Power 5 Light Company Shearon Harris Unit 1
Docket No.:
50-400 License No.:
NPF-63 During an NRC inspection conducted on November 12 December 9,
- 1995, a
violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
NUREG-1600, the violation is listed below:
10 CFR 50.73(a)(2)(i)(B) refers to 30-day Licensee Event Reports and requires that the licensee shall report any operation or condition prohibited by the plant's Technical Specifications.
This requirement is further implemented by the licensee's administrative procedure AP-617, Revision 2/I, Reportability Determination, Attachment l.
Contrary to the above, as of December 7,
1995, the licensee had not reported a condition prohibited by Technical Specifications which occurred on October 9, 1995.
The condition involved the failure to perform an offsite power availability verification within one hour of an emergency diesel generator being declared inoperable.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, Carolina Power and Light Company is hereby required to submit a written statement or explanation to the U. S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of. the letter transmitting this Notice of Violation (Notice).
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response.
If an adequate reply is not received within the time specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.
Where good cause is shown, consideration will be given to extending the response time; Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction.
However, if you find it necessary to include such information, you should clearly indicate the specific information that you desire not to be Enclosure 1
960ii900i2 '760105 PDR ADOCK 05000400 8
Notice of Violation placed in the
- PDR, and provide the legal basis to support your request for withholding the information from the public.
Dated at Atlanta, Georgia this Sthday of January 1996 Enclosure 1