Text
Dec~ 11,
1995
Carolina
Power
8 Light Company
ATTN: Hr.
W.
R. Robinson
Vice President
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165
Hail Code:
Zone
1
New Hill, NC 27562-0165
SUBJECT:
NRC INSPECTION REPORT
NO. 50-400/95-17
Dear Hr. Robinson:
This refers to the inspection
conducted
by on October
7 - November
11,
1995,
at the Harris facility.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted safely
and in
accordance
with NRC requirements.
At the conclusion of the inspection,
the
findings were discussed
with those
members of your staff identified in the
enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
the
NRC has determined that
violations of NRC requirements
occurred.
These violations are cited in the
enclosed
Notice of Violation (Notice)
and the circumstances
surrounding
them
are described
in detail in the subject inspection report.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions taken
and any additional
actions you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
addresses
the required response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules'of Practice,"
a copy of
this letter, its enclosures,
and your response will be placed in the
NRC
Public Document
Room (PDR).
To the extent possible,
your response
should not
include any personal
privacy, proprietary, or safeguards
information so that
it can
be placed in the
PDR without redaction.
~ ~n
d up~-.)()
95i2i80422 95i2ii
ADOCK 05000400
8
(
~F0/
CPtmLL
The responses
directed
by this letter and the enclosed
Notice are not subject
to the
<earance
procedures
of the Office of Management
nd Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No.96-511.
Sincerely,
Docket No.:
50-400
License No.:
(Original signed by M. Ghyzilock)
Milton B. Shymlock, Chief
Reactor Projects
Branch
4
Division of Reactor Projects
Enclosures
1.
2.
- NRC Inspection
Report
cc w/encls:
J.
Cowan,
Manager
Nuclear Services
8 Environmental
Support Department,
MS OHS7
Carolina
Power
8 Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
J.
W. Donahue
Plant Manager
Harris Plant
Carolina
Power 5 Light Company
Shearon Harris Nuclear
Power Plant
P. 0.
Box 165,
MC:
Zone
1
New Hill, NC
27562-0165
T. D. Walt, Manager
Regulatory Affairs
Carolina
Power
8 Light Company
Shearon
Harris Nuclear
Power Plant
P. 0.
Box 165, Mail Zone
1
New Hill, NC
27562-0165
R.
E. Jones
General
Counsel
Legal Department
Carolina
Power
& Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
(cc w/encls cont'd - See
page
2)
CPRL
(cc w/encls cont'd)
Oayne
H. Brown, Directo"
Division of Radiation Protection
N. C. Department of Environmental
Commerce
8 Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
Karen
E.
Long
Assistant Attorney General
State of North Carolina
P. 0.
Box 629
Raleigh,
NC
27602
Public Service
Commission
State of South Carolina
P. 0.
Box 11649
Columbia,
SC
29211
Chairman of the North Carolina
Utilities Commission
P. 0.
Box 29510
Raleigh,
NC
27626-0510
Robert
P. Gruber
Executive Director
Public Staff NCUC
P. 0.
Box 29520
Raleigh,
NC
27626
Uva Holland, Chairman
Board of County Commissioners
of Chatham
County
P. 0.
Box 87
Pittsboro,
NC
27312
cl
H. Shymloc'., RII
N. Le,
G. A. Hallstrom, RII
PUBLIC
NRC Resident
Inspector
U. S. Nuclear Regulatory
Commission
5421 Shearon Harris
Road
New Hill, NC
27562-9998
See
revious concurrences
attached
OFFICE
All:DRS
'IGNATURE
Rll:DRP
All:DRP ~
NAME
PFNlontJ
JZeRar
DATE
12/
/96
12 /
/96
12/
/96
12/
/96
COPYI
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD
COPY
DOCINENT NANEl
6:XRARRISKIRCURR%95-1/
12/
/96
YES
NO
12/
/96
YES
NO
OEC-1l-yg: idPN
l YaL
s
U
e
A
9~9 362 860
~ ~ l~
@VAN
FAX TRANSNlYTAL.
Aotllqetei
edpoyse b gg
. Shymloc , RI
N. Le,
6. A. Ha)lstrom, RII
PUHLLG
Hkt: Resident
Inspector
U. 8, tiuc'fear Regulatory Comaission
542I Shearon Harris Road
New Hi'l1, NC
27562-9998
NSH 2
101
6
RAL.
sos tw
W40hP
bATP.
JXakor
0
octo
~xi
c s
c IP'<ss
2/
ta
12 I
ill
32/
0
1
1
CO Y
8
Ks
A:
" l',0
~
-
DRPRII
Fax:4043515789
Dec
11 '95
15:24
P. 01/01
CPEiL
1
'str
'
v
H. Shyllj oc,
N. Le,
G. A. Ha11strom,
RII,
PUBLIC
NRC Ras)dent
Inspector
U. S. Nuclear Regulatory
Cosmtss1on
5421 Shearon
Harrke iRoad
New H1ll, NC
2786Rq9998
I
I:
t
c
~
~
OlthCE
ttl4
A%
ItlhltlQ
i
hilt MP
Rll:DRP
YES
j
8
n
YES
XO
gt
At ltAQS ll.O
t
85
FRON
NRC SRI sROBINSON
12/I I/95 16:44
P
~
I
TOTAL P.
1
~ ~
F
Distribution w encls:
H. Shymlock, RII
N. Le,
G. A. Hallstrom, RII
PUBLIC
NRC Resident
Inspector
U. S. Nuclear Regulatory
Commission
5421 Shearon
Harris
Road
New Hill, NC
27562-9998
RII:DRP
RII:DRP
OFFICE
Rll:DRS
SIGNATURE
DReberte
JZeiler
NAME
DATE
12/P I 95
12/
I 95
YES
NO
12 /
I 95
YES
NO
COPY7
YES
N
OFFICIAL RECORD
COPY
DOCDIIEIIT.HAIIE: A:KIN95-17.DF7
12/
/95
YES
NO
12/
/95
YES
NO
12/
I 95
YES
NO