ML18011B110
| ML18011B110 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/22/1996 |
| From: | Le N NRC (Affiliation Not Assigned) |
| To: | Robinson W CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18011B112 | List: |
| References | |
| TAC-M93342, NUDOCS 9601240253 | |
| Download: ML18011B110 (4) | |
Text
rtQg Januis/ty 22, t
Mr.
W.
R. Robinson, Vice President Shearon Harris Nuclear Power Plant Carolina Power 8 Light Company Post Office Box 165 - Mail Code:
Zone 1
New Hill, North Carolina 27562-0165
SUBJECT:
REACTOR BUILDING EMERGENCY EXHAUST SYSTEM SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. M93342)
Dear Mr. Robinson:
By letter dated September 23,
- 1995, as amended October 10,
- 1995, you proposed changes to the Shearon Harris Final Safety Analysis Report (FSAR) as a result of your determination that an unreviewed safety question existed.
The unreviewed safety question related to the discovery that portions of the emergency core cooling system (ECCS) piping are located outside the boundary of any safety-related filtration system at the Harris Nuclear Power Plant, Unit 1.
To resolve this issue, you reanalyzed and revised the dose assessments to account for untreated leakage from the ECCS system during the recirculation phase following a loss-of-coolant accident (LOCA).
To ensure the assumptions postulated in your revised dose assessment, you institute an administrative limit on external leakage that would occur in ECCS components outside the emergency exhaust system boundary and revised your FSAR.
The staff has reviewed those portions of the proposed FSAR changes related to your proposed administrative controls and postulated leak rates assumed in the revised dose assessment associated with post-LOCA accident analysis.
Based on our review, we concluded that the revised design basis and proposed FSAR changes are acceptable.
The bases for our conclusions are provided in the attached Safety Evaluation.
Sincerely, tong~ oned By)
Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
Safety Evaluation cc w/enclosure:
See next page DOCUMENT NAME:
G:iHARRIStI,HAR93342.LTR Distribution Mock'..
Fg 1 e~
ACRS PUBLIC PDII-1 RF SVarga JZwolinski OGC To receive a copy of this document, indicate in the box: "C" ~ Copy without attachment/enclosure "E" ~ Copy with attachment/enclosure "N" ~ No copy OFFICE NAME DATE PD21: LA EDunnin ton Ol/gg/96 PD21: PM NLe Ol/y5/96 PERB:BC CMille 01/
/96 SPLB:BCk'/ J CMcCracke 01/
/96 P
1 DMatt ews 01 96 OFFICIAL RECORD COPY 9h01.240253 960122 PDR ADOCK 05000400 P
0
'la r f
i a
l
-C I
E t
1
'I
'4
Mr. W.
R. Robinson Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant Unit 1
CC:
Mr. R.
E. Jones General Counsel Legal Department Carolina Power 5 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602.
Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Karen E.
Long Assistant Attorhey General State of North Carolina Post Office Box 629
- Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649
- Columbia, South Carolina 29211 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St.,
N.W. Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Director Division of Radiation Protection N.C. Department of Environmental Division of Radiation Protection Commerce 5 Natural Resources Post Office Box 27687
- Raleigh, North Carolina 27611-7687 Mr. J.
Cowan Manager Nuclear Services and Environmental Support Department Carolina Power 8 Light Company Post Office Box 1551 - Mail OHS7
- Raleigh, North Carolina 27602 Mr. J.
W. Donahue Plant Manager Harris Plant Carolina Power 5 Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1
New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC Post Office Box 29520
- Raleigh, North Carolina 27626 Chairman of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 T. D. Walt
- Manager, Regulatory Affairs Carolina Power 5 Light Company Shearon Harris Nuclear Power Plant P. 0.
Box 165, Mail Zone 1
New Hill, North Carolina 27562-0165 Mr. Vernon Malone, Chairman Board of County Commissioners of Wake County P. 0.
Box 550
- Raleigh, North Carolina 27602
's.
Uva Holland, Chairman Board of County Commissioners of Chatham County P. 0.
Box 87 Pittsboro, North Carolina 27312 Mr. Milton Shymlock U.S. Nuclear Regulatory Comm.
101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323-0199
0