Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A078 + (11:17:58, 7 January 2025)
- EPID:L-2017-LLA-0410 + (11:17:59, 7 January 2025)
- ML18012A077 + (11:17:59, 7 January 2025)
- ML18012A063 + (11:18:01, 7 January 2025)
- ML18012A068 + (11:18:01, 7 January 2025)
- NL-18-0026, NEDO-33883, Revision 0, GNF Armor Lead Test Assembly for Edwin I. Hatch Nuclear Plant, Unit 1 + (11:18:02, 7 January 2025)
- ML18012A058 + (11:18:09, 7 January 2025)
- ML18012A057 + (11:18:10, 7 January 2025)
- ONS-2018-006, Summary of Changes to Emergency Plan + (11:18:11, 7 January 2025)
- ML18012A053 + (11:18:11, 7 January 2025)
- ML18012A050 + (11:18:12, 7 January 2025)
- ML18012A048 + (11:18:13, 7 January 2025)
- ML18012A049 + (11:18:13, 7 January 2025)
- ML18012A027 + (11:18:14, 7 January 2025)
- ML18012A025 + (11:18:15, 7 January 2025)
- ML18012A017 + (11:18:16, 7 January 2025)
- ML18012A012 + (11:18:17, 7 January 2025)
- ML18012A008 + (11:18:17, 7 January 2025)
- ML18012A007 + (11:18:18, 7 January 2025)
- ML18012A002 + (11:18:19, 7 January 2025)
- PMNS20180047, Nnnnnn + (11:18:19, 7 January 2025)
- ML18011B149 + (11:18:20, 7 January 2025)
- ML18011B148 + (11:18:20, 7 January 2025)
- 05000409/LER-1995-001, :on 950417,noted That HPSW to Containment Building Isolated.Caused by Momentary LOP Due to Operational Test of 1A Edg.Procedures for Test Being Modified to Include Instructions to Verify Value Being Open + (11:18:22, 7 January 2025)
- ML18011B136 + (11:18:23, 7 January 2025)
- TAC:L50905 + (11:18:24, 7 January 2025)
- ML18011B135 + (11:18:25, 7 January 2025)
- RAIO-0118-58142, LLC Response to NRC Request for Additional Information No. 313 (Erai No. 9312) on the NuScale Design Certification Application + (11:18:26, 7 January 2025)
- ML18011B131 + (11:18:28, 7 January 2025)
- ML18011B130 + (11:18:29, 7 January 2025)
- ML18011B128 + (11:18:30, 7 January 2025)
- HNP-96-016, Special Rept:On 951105,actuation of ECCS & Subsequent Injection of Water Into RCS Occurred.Unusual Event (UE) Declared Due to ECCS Actuation & UE Exited Based on Termination of SI & Stabilization of Plant in Mode-3 + (11:18:31, 7 January 2025)
- ML18011B126 + (11:18:33, 7 January 2025)
- ML18011B125 + (11:18:35, 7 January 2025)
- ML18011B124 + (11:18:36, 7 January 2025)
- ML18011B123 + (11:18:38, 7 January 2025)
- 05000400/LER-1995-016-01, :on 951228,unplanned Esf/Rps Actuation Occurred Due to Unexpected Opening of a RT Breaker During Testing. Caused by Inadequate Procedure.Revised Procedure & Trained Appropriate Personnel + (11:18:39, 7 January 2025)
- IR 05000400/1995017 + (11:18:40, 7 January 2025)
- TAC:M74418 + (11:18:42, 7 January 2025)
- ML18011B120 + (11:18:42, 7 January 2025)
- ML18011B118 + (11:18:43, 7 January 2025)
- IR 05000400/1995020 + (11:18:45, 7 January 2025)
- ML18011B115 + (11:18:46, 7 January 2025)
- ML18011B114 + (11:18:47, 7 January 2025)
- ML18011B113 + (11:18:48, 7 January 2025)
- ML18011B111 + (11:18:49, 7 January 2025)
- ML18011B110 + (11:18:50, 7 January 2025)
- TAC:M93342 + (11:18:50, 7 January 2025)
- 05000400/LER-1995-013, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/95-18.Corrective Actions:Reported Failure to Perform Offsite Power Availibility Verification within One H in LER 95-013 + (11:18:52, 7 January 2025)
- HNP-96-002, Forwards Inservice Inspection Summary, for Shnpp.Rept Covers Inspections Performed During Cycle 6 Operations Including Refueling Outage 6,in First Insp Interval + (11:18:53, 7 January 2025)
- ML18011B106 + (11:18:55, 7 January 2025)