Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A478 + (11:10:54, 7 January 2025)
- HNP-97-013, Forwards Ltr Re Commitment Made to NRC for CPL Implementation for GL 96-01 Requirements at HNP Dated on 960416 + (11:10:55, 7 January 2025)
- ML18012A477 + (11:10:55, 7 January 2025)
- HNP-97-006, Forwards Revised Request for Relief from ISI Requirements for ASME Code Case N-522 + (11:10:57, 7 January 2025)
- HNP-97-012, Submits Requested Preliminary Reactor & Senior Reactor Operator License Applications + (11:10:59, 7 January 2025)
- HNP-97-003, Forwards Rev 29 to Shearon Harris Nuclear Power Plant Emergency Plan Including Changes to (PLP-201) + (11:11:01, 7 January 2025)
- HNP-97-004, Submits Revised Request for Addl Info Re ASME Boiler & Pressure Vessel Code,Section XI ISI Program Relief Request for Regenerative Heat Exchanger + (11:11:02, 7 January 2025)
- HNP-97-008, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-10.Corrective Actions:Submitted Proposed Amend to TS 3/4.7.5 Re Ultimate Heat Sink,Reviewed Other Active TS Interpretations & Revised Procedure AP-107 + (11:11:04, 7 January 2025)
- PNO-II-97-002, on 970122,maint Technician Discovered Cut Wire Among Wire Bundle.Wire Cut W/Insulation Stripped Back & Wire Ends Twisted Together.Harris Security Notified & Determined Tampering & Vandalism Could Not Be Ruled Out + (11:11:14, 7 January 2025)
- 05000400/LER-1996-025, :on 961218,determined Missed Surveillance Test on PORV Block Valve 1RC-115.Caused by Personnel Error.Tested 1RC-115 & Counseled Personnel Involve + (11:11:16, 7 January 2025)
- HNP-97-001, Monthly Operating Rept for Dec 1996 for Shearon Harris Nuclear Power Plant + (11:11:17, 7 January 2025)
- ML18012A464 + (11:11:19, 7 January 2025)
- HNP-96-209, Application for Amend to License NPF-63,requesting Rev to TS 4.8.1.1.2.h.2 Re Test Tanks & Nonisolable Piping at Test Pressure + (11:11:20, 7 January 2025)
- ML18012A461 + (11:11:23, 7 January 2025)
- ML18012A460 + (11:11:24, 7 January 2025)
- ML18012A457 + (11:11:26, 7 January 2025)
- ML18012A454 + (11:11:27, 7 January 2025)
- ML18012A453 + (11:11:28, 7 January 2025)
- IR 05000254/2017007 + (11:11:35, 7 January 2025)
- HNP-96-206, Application for Amend to License NPF-63,requesting Rev to Chemistry Data (Nickel Content) in TS 3/4.4.9 Re Pressure/ Temp Limits + (11:11:36, 7 January 2025)
- 05000400/LER-1996-022, :on 961122,wiring Discrepancy Was Found in Auxiliary Building Ventilation Sys Circuitry.Caused by Personnel Error.Training on This Event Will Also Be Performed for Appropriate Maintenance + (11:11:38, 7 January 2025)
- 05000400/LER-1996-024, :on 961121,identified Common Mode Failure in RAB Electrical Equipment Protection Rooms Ventilation Sys. Caused by Inadequate Initial Sys Design.Will Install Plant Mod to Resolve AH-16 Single Failure + (11:11:40, 7 January 2025)
- ML18012A444 + (11:11:42, 7 January 2025)
- HNP-96-205, Monthly Operating Rept for Nov 1996 for Shearon Harris Nuclear Power Plant + (11:11:43, 7 January 2025)
- ML18012A442 + (11:11:45, 7 January 2025)
- ML18012A440 + (11:11:46, 7 January 2025)
- ML18012A439 + (11:11:47, 7 January 2025)
- 05000400/LER-1996-021, :on 961107,inadequate post-maint Testing Following Repairs on Containment Isolation Valve 1SP-208 Identified.Caused by Misinterpretation of ASME Code. Procedures Revised + (11:11:48, 7 January 2025)
- HNP-96-200, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-09.Corrective Actions:Co Responsible for Inadvertent Filling & Resultant Dilution of Rwst,Was Counseled on Use of Error Prevention Techniques + (11:11:49, 7 January 2025)
- ML18012A436 + (11:11:52, 7 January 2025)
- IR 05000400/1996007 + (11:11:54, 7 January 2025)
- HNP-96-197, Submits 60 Day Response to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (11:11:55, 7 January 2025)
- HNP-96-196, Monthly Operating Rept for Oct 1996 for Shearon Harris Nuclear Power Plant + (11:11:56, 7 January 2025)
- ML18012A428 + (11:11:58, 7 January 2025)
- ML18012A426 + (11:11:59, 7 January 2025)
- ML18012A424 + (11:12:00, 7 January 2025)
- ML18012A423 + (11:12:01, 7 January 2025)
- HNP-96-190, NPDES Noncompliance Notification:On 960930,exceeded Daily Max Limit & Monthly Average Limit of BOD5 During Reporting Period.Caused by Reduction in Chlorine Contact Time.Reviewed Operational Procedures + (11:12:03, 7 January 2025)
- ML18012A422 + (11:12:03, 7 January 2025)
- HNP-96-186, Responds to NRC GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions, for Plant + (11:12:08, 7 January 2025)
- ML18012A416 + (11:12:10, 7 January 2025)
- HNP-96-172, Application for Amend to License NPF-63,revising TSs Re Ultimate Heat Sink Level & Temp + (11:12:11, 7 January 2025)
- HNP-96-189, Forwards Projected End of Cycle Burnup Data for Cycle 8 in Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (11:12:12, 7 January 2025)
- HNP-96-192, Forwards Table Showing Alert Level Changes Re Loose Parts Monitoring Sys,Per Reg Guide 1.133 + (11:12:14, 7 January 2025)
- ML18012A411 + (11:12:16, 7 January 2025)
- HNP-96-181, Ro:On 960916,fish Kill Occurred in Harris Lake.Caused by Heavy Precipitation That Accompanied Hurricane Fran.Will Perform Monitoring of Dissolved Oxygen Concentrations to Document Return of Sufficient Oxygen to Aquatic Life + (11:12:17, 7 January 2025)
- HNP-96-179, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-07.C/As:CO Responsible for Monitoring Wrong Gauge During Performance of OST-1214 Was Counselled on Use of self-checking Techniques + (11:12:19, 7 January 2025)
- HNP-96-184, Submits Info Explaining How NRC Questions Applied to Licensee Re ECCS Changes as Discussed in Meeting W/Spc & Affected Utils on 961016 + (11:12:30, 7 January 2025)
- 05000400/LER-1996-017, :on 960805,failure to Perform Surveillance Testing Required by TS Noted.Caused by Personnel Error. Surveillance Testing Scheduling Process Has Been Developed & Implemented on Trial Basis + (11:12:33, 7 January 2025)
- HNP-96-182, Submits Response to GL 96-04, Boraflex Degradation in Spent Fuel Storage Racks + (11:12:35, 7 January 2025)
- ML18012A404 + (11:12:35, 7 January 2025)