Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18012A823 + (11:06:31, 7 January 2025)
- IR 05000400/1997001 + (11:06:32, 7 January 2025)
- IR 05000400/1997005 + (11:06:34, 7 January 2025)
- ML18012A819 + (11:06:36, 7 January 2025)
- IR 05000400/1997003 + (11:06:37, 7 January 2025)
- ML18012A817 + (11:06:38, 7 January 2025)
- ML18012A813 + (11:06:39, 7 January 2025)
- ML18012A812 + (11:06:40, 7 January 2025)
- HNP-97-100, Application for Amend to License NPF-63,amending TS 6.0, Administrative Controls, TS 6.2.2.e & TS 6.2.2.f + (11:06:46, 7 January 2025)
- 05000400/LER-1997-013, :on 970508,entry Into Mode-6 Without Operable Components,Resulting in TS 3.0.4 Violation Occurred.Caused by Personnel Error.Personnel Involved Counseled + (11:06:50, 7 January 2025)
- ML18012A806 + (11:06:56, 7 January 2025)
- ML18012A805 + (11:06:57, 7 January 2025)
- ML18012A803 + (11:06:58, 7 January 2025)
- 05000400/LER-1997-012, :on 970505,determined That Previous Auxiliary Control Panel Had Not Verified Operability of Interposing Relays.Caused by Misinterpretation of Tss.Reviewed Other Remote Shutdown Panel Transfer Circuitry + (11:07:01, 7 January 2025)
- ML18012A799 + (11:07:02, 7 January 2025)
- HNP-97-114, Forwards Revised TS Pp B3/4 5-1,B 3/4 5-1a & B 3/4 5-2 Bases,Which Incorporates Changes from Amend 71,as Well as 970310 Proposed Changes + (11:07:03, 7 January 2025)
- ML18012A796 + (11:07:05, 7 January 2025)
- 05000400/LER-1996-023, :on 961114,design Deficiency in EDG Protection Circuitry Was Identified.Caused by Inadequate Original Plant Design.Surveillance Test Procedures OST-1013 & OST-1073 Revised + (11:07:07, 7 January 2025)
- ML18012A794 + (11:07:08, 7 January 2025)
- 05000400/LER-1997-005, Responds to NRC Re Violations Noted in Insp Rept 50-400/97-03.Corrective Actions:Submitted LER 97-005-00 on 970317 & Reviewed Violation W/Individuals Involved to Ensure Understanding Re Identification of Reportable Conditions + (11:07:10, 7 January 2025)
- HNP-97-049, Informs That,Based on Test Results,Cp&L Will Not Modify Eight Gate Valves as Stated in Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (11:07:11, 7 January 2025)
- ML18012A791 + (11:07:13, 7 January 2025)
- ML18012A790 + (11:07:15, 7 January 2025)
- 05000400/LER-1997-011, :on 970422,inappropriate TS Interpretation Resulted in Violations of ECCS Accumulator TS & Entry Into TS 3.0.3.Caused by Procedural Inadequacy.Tsi 88-001 Cancelled 970508 & Procedures Revised + (11:07:16, 7 January 2025)
- HNP-97-113, Suppl to Response to Violations Noted in Insp Rept 50-400/97-01.Corrective Actions:Procedure Has Been Placed on Administrative Hold to Ensure It Is Not Performed Until Further Enhancements Made,Since EST-702 Not Expected + (11:07:17, 7 January 2025)
- 05000400/LER-1997-010, :on 970418,design Deficiency Determined Re Reactor Coolant Pump Motor Oil Collection Sys.Caused by RCP Ocs Design Detail.Rcp Ocs Enclosures for Each of Three Installed RCP Motors Have Been Modified + (11:07:20, 7 January 2025)
- HNP-97-068, Application for Amend to License NPF-63,informing That TS 4.6.2.3 a.2 Requires Verification at Least Once Per 31 Days of Cw Flow Rate of Greater than or Equal to 1425 Gpm to Each Containment Fan Cooler + (11:07:24, 7 January 2025)
- ML18012A786 + (11:07:24, 7 January 2025)
- HNP-97-105, Provides Revised Resolution Status for Plant Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (11:07:26, 7 January 2025)
- HNP-97-107, Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant + (11:07:28, 7 January 2025)
- HNP-97-103, Responds to RAI Re Cask Handling Operation & Assumptions Used in Cask Drop Analysis & Dose Assessment + (11:07:30, 7 January 2025)
- HNP-97-108, Submits Special Rept,Per TS 4.4.5.5.a for Plant.Rept Identifies Number of SG Tubes Plugged as Result of Recent SG Tube ISI Conducted During Refueling Outage Number 7 + (11:07:32, 7 January 2025)
- HNP-97-109, Communicates Change in Util Plans Re Implementation of GL 88-17 Requirements for Plant.Procedures Will Be Revised & Operations Personnel Will Be Briefed on Evolution Prior to Conducting Vacuum Fill,Should Util Decide to Use Vacuum + (11:07:34, 7 January 2025)
- TAC:M92246 + (11:07:36, 7 January 2025)
- HNP-97-097, Annual Radiological Environ Operating Rept for 1996. W/ + (11:07:37, 7 January 2025)
- ML18012A778 + (11:07:37, 7 January 2025)
- 05000400/LER-1997-009, :on 970407,fuse Was Removed from CR Ventilation Isolation Signal Power Supply Circuitry Due to Personnel Error.Individuals Involved Were Counseled + (11:07:40, 7 January 2025)
- 05000400/LER-1997-008, :on 970404,safety-related AHU Not Declared Inoperable During Maintenance on Associated Temperature Switches Resulting in Violation of Ts.Caused by Incorrect Interpretation.Operations Night Order Issued + (11:07:42, 7 January 2025)
- HNP-97-102, Forwards Proprietary Info Re Notification of Change in Senior Reactor Operator Status.Encl Withheld Per 10CFR2.790(a)(6) + (11:07:43, 7 January 2025)
- ML18012A771 + (11:07:45, 7 January 2025)
- HNP-97-101, Forwards Rev 0 to Harris Nuclear Plant Cycle 8 Colr. Rev Incorporates Changes Necessary as Result of Cycle 8 Core Changes & to Remove Cycle 7 Temporary Relaxation of Min Required of Detector Thimbles in Micds + (11:07:46, 7 January 2025)
- ML18012A762 + (11:07:48, 7 January 2025)
- IR 05000400/1996006 + (11:07:49, 7 January 2025)
- ML18012A760 + (11:07:51, 7 January 2025)
- ML18012A759 + (11:07:52, 7 January 2025)
- ML18012A757 + (11:07:53, 7 January 2025)
- ML18012A756 + (11:07:54, 7 January 2025)
- HNP-97-095, Provides Addl Info Concerning Mod Testing & Completed Failure Modes & Effects Analysis Re EDG Protection Circuitry + (11:07:55, 7 January 2025)
- ML18012A754 + (11:08:01, 7 January 2025)
- ML18012A752 + (11:08:02, 7 January 2025)
- ML18012A750 + (11:08:03, 7 January 2025)
- ML18012A748 + (11:08:04, 7 January 2025)