Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000296/LER-1980-003, Forwards LER 80-003/03L-0 + (09:18:23, 7 January 2025)
- ML18024B353 + (09:18:24, 7 January 2025)
- ML18024B350 + (09:18:26, 7 January 2025)
- ML18024B352 + (09:18:26, 7 January 2025)
- ML18024B349 + (09:18:27, 7 January 2025)
- ML18024B343 + (09:18:28, 7 January 2025)
- ML18024B345 + (09:18:28, 7 January 2025)
- 05000296/LER-1980-002-03, /03L-0:on 800117,while Performing Surveillance Instruction 4.5.B.1.d,residual Heat Removal Sys Flow Control Valve FCV.74-73 Tripped in mid-position.Caused by Valve Stem Lubricant Losing Lubricity,Causing Force on Motor + (09:18:30, 7 January 2025)
- 05000296/LER-1980-002, Forwards LER 80-002/03L-0 + (09:18:32, 7 January 2025)
- ML18024B339 + (09:18:34, 7 January 2025)
- ML18024B338 + (09:18:35, 7 January 2025)
- IR 05000259/1979030 + (09:18:47, 7 January 2025)
- ML18024B328 + (09:18:48, 7 January 2025)
- ML18024B326 + (09:18:49, 7 January 2025)
- ML18024B325 + (09:18:50, 7 January 2025)
- ML18024B324 + (09:18:51, 7 January 2025)
- 05000296/LER-1979-021, Supplemental LER 79-021/01T-1:on 791208,following Return to Svc After Refueling Outage,Primary Containment Pressure Would Not Stabilize.Caused by Leaking Due to Unevenly Tightened Bolts.New Controls & Hatch Lock to Be Used + (09:18:53, 7 January 2025)
- ML18024B322 + (09:18:57, 7 January 2025)
- PNO-II-79-050, on 791230,electrical Grounds Experienced in Underground 4-kV Cables Supplying Backup Power from Cooling Tower Transformers to Shutdown Board.Unit Shut Down to Evaluate & Correct Problem + (09:18:59, 7 January 2025)
- ML18024B318 + (09:19:00, 7 January 2025)
- ML18024B317 + (09:19:01, 7 January 2025)
- ML18024B315 + (09:19:02, 7 January 2025)
- PNO-II-79-040, on 791208,during Approach to Full Power Following Refueling Outage,Nitrogen Leak from Primary Containment Occurred.Caused by Three Loose Bolts on Equipment Hatch.Problem Corrected,Including Retesting + (09:19:08, 7 January 2025)
- ML18024B311 + (09:19:08, 7 January 2025)
- ML18024B309 + (09:19:09, 7 January 2025)
- ML18024B308 + (09:19:10, 7 January 2025)
- ML18024B306 + (09:19:12, 7 January 2025)
- IR 05000259/1979041 + (09:19:15, 7 January 2025)
- ML18024B303 + (09:19:17, 7 January 2025)
- ML18024B302 + (09:19:18, 7 January 2025)
- ML18024B301 + (09:19:18, 7 January 2025)
- ML18024B297 + (09:19:20, 7 January 2025)
- ML18024B299 + (09:19:20, 7 January 2025)
- ML18024B295 + (09:19:21, 7 January 2025)
- IR 05000259/1979045 + (09:19:24, 7 January 2025)
- ML18024B292 + (09:19:30, 7 January 2025)
- 05000296/LER-1980-001-03, /03L-0:on 791230,w/Unit 3 in Shutdown,Bus Tie Board Was de-energized for Startup.Caused by Feeder Cable Failure.Work in Progress to Bypass Bad Cable Sections + (09:19:33, 7 January 2025)
- 05000296/LER-1980-001, Forwards LER 80-001/03L-0 + (09:19:37, 7 January 2025)
- 05000260/LER-1980-001-03, /03L-0:on 791229,during Normal Operation,While Performing SI 4.2.B-1,switch 1 on Reactor Water Level LITS-3-58D Failed to Operate.Caused by Rendom Failure of Switch in Yarway Model 4418CE.Switch Replaced + (09:19:40, 7 January 2025)
- 05000260/LER-1980-001, Forwards LER 80-001/03L-0 + (09:19:42, 7 January 2025)
- ML18024B284 + (09:19:44, 7 January 2025)
- 05000260/LER-1979-026-03, /03L-0:on 791223,during Startup & Followup PCIS mods,drywell-to-torus Differential Pressure Indicator Not Operating.Caused by Blown Fuse.Fuse Replaced.No Recurrence Control Action Planned + (09:19:46, 7 January 2025)
- 05000260/LER-1979-026, Forwards LER 79-026/03L-0 + (09:19:48, 7 January 2025)
- ML18024B273 + (09:19:49, 7 January 2025)
- 05000260/LER-1980-002-03, /03L-0:on 791222,w/unit in Cold Shutdown,Found That Flow Control Valve 2-FCV-68-79 on Recirculation Sys Would Not Operate.Caused by Motor Pinion Gear Being Installed Backwards.Installment Procedures Will Be Revised + (09:19:51, 7 January 2025)
- 05000260/LER-1980-002, Forwards LER 80-002/03L-0 + (09:19:53, 7 January 2025)
- ML18024B267 + (09:19:56, 7 January 2025)
- ML18024B266 + (09:19:57, 7 January 2025)
- ML18024B265 + (09:19:58, 7 January 2025)
- ML18024B263 + (09:19:59, 7 January 2025)
- 05000296/LER-1979-028-03, /03L-0:on 791218,while Performing SI,PS-3-74A & B & PS-68-95 (Reactor Pressure) Did Not Actuate at Correct Setpont.Caused by Drifting of Barton Model 288 & Barksdale B2T-M12SS.Switches Readjusted + (09:20:00, 7 January 2025)