Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-3991, Forwards Rev 4 to Fire Protection Review Rept + (08:46:41, 7 January 2025)
- PLA-4112, Responds to Request for Addl Info Re SGTS Performance for Loss of SFP Cooling Following Seismic Event,Per NRC + (08:46:44, 7 January 2025)
- ML18026A436 + (08:46:46, 7 January 2025)
- PLA-3949, Provides Revised Plan & Commitments for Completion of Tasks Necessary to Meet Guidelines of GL 89-10 & Justification for Deferral of Work on Valves Associated W/Msivlcs within GL 89-10 Program.Rev 1 to Calculation EC-VALV-0503 Encl + (08:46:47, 7 January 2025)
- PLA-4032, Forwards Responses to NRC Questions,Revised Pages to Emergency Plan,Revised Pages to Technical Basis & Proposed Eals,In Response to NRC 930609 Request for Addl Info on Rev to Emergency Plan Which Implemented NUMARC NESP-007 + (08:46:53, 7 January 2025)
- ML18026A432 + (08:46:56, 7 January 2025)
- ML18026A430 + (08:46:57, 7 January 2025)
- ML18026A428 + (08:46:59, 7 January 2025)
- PLA-3996, Forwards Discussion on Perspective on Licensing Basis of Spent Fuel Pool Cooling Sys for Plants + (08:47:00, 7 January 2025)
- 05000388/LER-1990-007, :on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be Redesigned + (08:47:04, 7 January 2025)
- PLA-3933, Responds to NRC Re Violations Noted in Insp Repts 50-287/92-23 & 50-388/92-23.C/As:surveillance Procedures Will Be Revised to Address Types of Fire Barrier Matl to Be Inspected to Provide Acceptance Criteria for Fire Barrier + (08:47:05, 7 January 2025)
- ML18026A424 + (08:47:08, 7 January 2025)
- 05000387/LER-1992-016, :on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be Revised + (08:47:10, 7 January 2025)
- PLA-3817, Forwards Presentation Matl from 920717 SALP Meeting Discussing Most Recent NRC Assessment of Util Performance + (08:47:12, 7 January 2025)
- ML18026A418 + (08:47:15, 7 January 2025)
- PLA-3745, Forwards Revised Response to NRC Station Blackout Safety Evaluation ,revising Diesel Generator Target Reliability to 0.975,based on NRC Position.Resolution of Cabinet Temp Concern Will Be Submitted by 920501 + (08:47:16, 7 January 2025)
- PLA-3732, Forwards Response to NRC 910730 Request for Addl Info Re Proposed Amend 137 to License NPF-14 & Proposed Amend 91 to License NPF-22 Re Elimination of Temp Leak Detection Isolation Function in RHR Room + (08:47:20, 7 January 2025)
- ML18026A415 + (08:47:28, 7 January 2025)
- PLA-3681, Forwards Set of Viewgraphs Describing Principal Activities of Nuclear Safety Assessment Group & Paper Presented at American Nuclear Society Reactor Operations Div Topical Meeting Last Aug in Bellevue,Wa + (08:47:29, 7 January 2025)
- PLA-3630, Responds to NRC Request for Addl Info Re Requested Rev to Tech Specs for Facility Ses Related to Rwcu/Hpci/Rcic Temp Based Steam Leak Detection Isolation Setpoints + (08:47:34, 7 January 2025)
- ML18026A408 + (08:47:37, 7 January 2025)
- ML18026A405 + (08:47:40, 7 January 2025)
- PLA-3516, Suppls 890612 & 1221 Responses to Enforcement Action 89-042 Re Exceeding Tech Spec Reactor Vessel Cooldown Rate Limit on 890112.Requests Formal NRC Review of Util Response + (08:47:41, 7 January 2025)
- ML18026A401 + (08:47:44, 7 January 2025)
- ML18026A399 + (08:47:45, 7 January 2025)
- ML18026A398 + (08:47:47, 7 January 2025)
- PLA-3445, Forwards Proposed Amend 87 to License NPF-22,changing Tech Specs to Support Cycle 5 Reload.Reload Summary Rept Also Encl + (08:47:51, 7 January 2025)
- ML18026A396 + (08:47:51, 7 January 2025)
- PLA-3438, Requests Waiver of Compliance from Tech Spec 3.8.1.1 to Evaluate Increase in Action from 72 H to 15 Days Re Ac Sources Based on 900829 Borescopic Insp of Emergency Diesel Generator + (08:47:57, 7 January 2025)
- ML18026A393 + (08:47:59, 7 January 2025)
- ML18026A389 + (08:48:01, 7 January 2025)
- PLA-1074, Summarizes 820301 Meeting W/Nrc to Discuss Design Control Program for Facilities.Description of Program & Slides Presented at Meeting Encl.Independent Piping Design Review Will Be Completed About 820601 + (08:48:02, 7 January 2025)
- ML18026A386 + (08:48:05, 7 January 2025)
- PLA-1039, Forwards Project Description for Independent Design Review of safety-related Piping Sys.Limits & Scope of Review & Means of Disseminating Basic Design Info Defined + (08:48:06, 7 January 2025)
- ML18026A384 + (08:48:09, 7 January 2025)
- PLA-1024, Forwards Sqrt Forms for Balance of Plant Equipment in Partial Response to Ser,Item 11 + (08:48:10, 7 January 2025)
- ML18026A381 + (08:48:12, 7 January 2025)
- ML18026A380 + (08:48:13, 7 January 2025)
- ML18026A379 + (08:48:14, 7 January 2025)
- ML18026A376 + (08:48:15, 7 January 2025)
- ML18026A375 + (08:48:16, 7 January 2025)
- ML18026A374 + (08:48:18, 7 January 2025)
- ML18026A373 + (08:48:19, 7 January 2025)
- ML18026A371 + (08:48:20, 7 January 2025)
- ML18026A370 + (08:48:21, 7 January 2025)
- ML18026A367 + (08:48:22, 7 January 2025)
- ML18026A366 + (08:48:23, 7 January 2025)
- ML18026A365 + (08:48:24, 7 January 2025)
- ML18026A364 + (08:48:25, 7 January 2025)
- ML18026A363 + (08:48:26, 7 January 2025)
- ML18026A362 + (08:48:27, 7 January 2025)
- ML18026A361 + (08:48:28, 7 January 2025)