Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205G815 + (21:08:15, 7 December 2024)
- ML20205G813 + (21:08:16, 7 December 2024)
- ML20205G812 + (21:08:16, 7 December 2024)
- ML20205G811 + (21:08:17, 7 December 2024)
- ML20205G809 + (21:08:17, 7 December 2024)
- ML20205G808 + (21:08:18, 7 December 2024)
- ST-HL-AE-2010, Forwards Revised FSAR Chapters 6.2 & 15.6,reflecting ECCS Reanalysis.Reanalysis Utilizes Approved Westinghouse Bart Program & Incorporates as-built Plant Data & Other Assumptions Not Used in Earlier Analysis + (21:08:19, 7 December 2024)
- ML20205G805 + (21:08:20, 7 December 2024)
- NLS8600263, Documents Action Taken Re Equipment Operational Analysis for Limitorque Motor Operators,Per Util .Remaining Insps Will Be Completed During 1986 Refueling Outage + (21:08:20, 7 December 2024)
- ML20205G800 + (21:08:23, 7 December 2024)
- ML20205G796 + (21:08:24, 7 December 2024)
- NOC-AE-000367, Application for Amends to Licenses NPF-76 & NPF-80, Relocating TS 3/4.3.3.4, Meteorological Instrumentation & Associated Bases Description to STP Trm,Per NUREG-1431 + (21:08:24, 7 December 2024)
- ML20205G793 + (21:08:25, 7 December 2024)
- ML20205G792 + (21:08:26, 7 December 2024)
- ML20205G790 + (21:08:26, 7 December 2024)
- ML20205G789 + (21:08:27, 7 December 2024)
- ULNRC-03998, Forwards Required Financial Info Re Decommissioning Callaway Nuclear Plant,Per 10CFR50.75 + (21:08:28, 7 December 2024)
- ML20205G787 + (21:08:29, 7 December 2024)
- ML20205G786 + (21:08:29, 7 December 2024)
- ML20205G785 + (21:08:30, 7 December 2024)
- ML20205G780 + (21:08:31, 7 December 2024)
- ML20205G781 + (21:08:31, 7 December 2024)
- ML20205G777 + (21:08:32, 7 December 2024)
- ML20205G779 + (21:08:32, 7 December 2024)
- ML20205G776 + (21:08:33, 7 December 2024)
- IR 05000315/1987004 + (21:08:48, 7 December 2024)
- ML20205G767 + (21:08:49, 7 December 2024)
- ML20205G771 + (21:08:49, 7 December 2024)
- ML20205G765 + (21:08:50, 7 December 2024)
- ML20205G761 + (21:08:51, 7 December 2024)
- ML20205G764 + (21:08:51, 7 December 2024)
- ML20205G760 + (21:08:52, 7 December 2024)
- ML20205G759 + (21:08:53, 7 December 2024)
- RC-99-0078, Submits Summary of Present Levels of Property Insurance & Cash Flow Statement for VC Summer Nuclear Station,Per 10CFR50.54(w)(3) & 10CFR140.21(e) + (21:08:53, 7 December 2024)
- ML20205G756 + (21:08:54, 7 December 2024)
- 05000249/LER-1987-002-09, :on 870225,while Unit Operating at 87% Power, HPCI Sys Discovered Inoperable.Caused by Oil Pressure Regulation Valve Failure.Similar Event Occurred on 870313. Limits of PS4 Reset to 60 Psig Increasing + (21:08:58, 7 December 2024)
- ULNRC-04000, Forwards Rept Re Present Level of Insurance & Sources of Insurance Applicable to Callaway Plant,Per 10CFR50.54(w) + (21:08:59, 7 December 2024)
- ML20205G750 + (21:09:00, 7 December 2024)
- ML20205G748 + (21:09:01, 7 December 2024)
- ML20205G745 + (21:09:06, 7 December 2024)
- ML20205G743 + (21:09:07, 7 December 2024)
- ML20205G739 + (21:09:08, 7 December 2024)
- ML20205G736 + (21:09:08, 7 December 2024)
- ML20205G735 + (21:09:09, 7 December 2024)
- PNO-V-87-024, on 870322,both Main Feedwater Pumps Lost Suction Pressure & Tripped.Plant Operator Manually Tripped Reactor Upon Losing All Feedwater Flow.Reactor Vessel Level Restored & Heat Manually Removed.Investigation Pending + (21:09:11, 7 December 2024)
- ML20205G731 + (21:09:12, 7 December 2024)
- 05000237/LER-1987-007-02, :on 870227,drywell Structural Steel Radial Beam Discovered Outside Design Requirements.Caused by Reinstallation Deficiency.Beam Repair Completed on 870314, Per Engineering Change Notice D875-09 + (21:09:14, 7 December 2024)
- ML20205G727 + (21:09:15, 7 December 2024)
- ML20205G725 + (21:09:16, 7 December 2024)
- ML20205G724 + (21:09:16, 7 December 2024)
- ML20205G722 + (21:09:23, 7 December 2024)