r Ca March 31,1999L RESCHEDULED MEETING WITH NEl MEMORANDUM TO: Cynthia A. Carpenter, Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management J
Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager Thomas Bergman for/
Generic issues and Environmental Projects Branch l
Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI) f REGARDING RISK ASSESSMENT PROCESS FOR INDIVIDUAL INSPECTION FINDINGS IN RADIATION PROTECTION AREA DATE AND TIME:
Apdl 12,1M9 April 13,1999 10:30 a.m. - 4:30 p.m.
i LOCATION:
U.S. Nuclear Regulatory Commission i
One White Flint North j
11555 Rockvil!e Pike j
Rockville, Maryland 20852 j
l1 corr,0-12S4 Room 0-8B4
)
PURPOSE:
To continue discussion of stakeholder comments on performance indicators and draft non-conformance evaluation matrices in the occupational and public dose areas. These matrices will be used by the NRC to aid in estimating risk significance of inspection findings in the radiation protection area at operating nuclear power plants.
PARTICIPANTS:
NRC INDUSTRY i
T. Essig R. Andersen, NEl C. Hinson P. Genoa, NEl, et al.
S. Klementowicz R. Pedersen J. Wigginton, et al.
Project No. 689 Nb b cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other partics to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 1)Cg3 48344,9/20/94. Members of the public who wish to attend should contact Jim Wigginton at I
(301) 415-1059 (Lew2@nrc.aovt Distribution: See next page DOCUMENT: G:\\simi\\mtg0412.wpd
[
OFFICE PGEB (A)SC:PGEB NAME SMagruder:sw TBergman DATE 04/- /99 04/
/99
. 7. g 3 9 9904070374 990331 f[l6 3 b 8 #/
REVGPERONgtylC PDR L..
c-Y p arou o
y q
UNITED STATES S
NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 2055A001
%*****/
Y March 31, 1999 RESCHEDULED MEETING WITH NEl MEMORANDUM TO: Cynthia A. Carpenter, Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation FROM:
Stewart L. Magruder, Project Manager Thomas Bergman for/
Generic Issues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)
REGARDING RISK ASSESSMENT PROCESS FOR INDIVIDUAL INSPECTION FINDINGS IN RADIATION PROTECTION AREA DATE AND TIME:
Aprll 12,1000 April 13,1999 10:30 a.m. - 4:30 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 flocm,0-1204 Room 0-884 PURPOSE:
To continue discussion of stakeholder comments on performance indicators and draft non-conformance evaluation matrices in the j
occupational and public dose areas. These matrices will be used by the I
NRC to aid in estimating risk significance of inspection findings in the radiation protection area et operating nuclear power plants.
t PARTICIPANTS:
NRC INDUSTRY l
T. Essig R. Andersen, NEl J. Wigginton P. Genoa, NEl, et al.
C. Hinson S. Klementowicz R. Pedersen, et al.
Project No. 689 cc: See next page Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, interveners, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister l
48344,9/20/94. Members of the public who wish to attend should contact Jim Wigginton at (301) 415-1059 (JEW 2@nrc. gov).
!,, s-l I
l Nuclear Energy institute Project No. 689 cc:
Mr. Ralph Beedle Ms. Lynnette Hendricks, Director l
y Senior Vice President Plant Support.
and Chief Nuclear Officer Nuclear Energy Institute Nuclear Energy institute
-Suite 400 Suite 400 1776 i Street, NW 1776 l Street, NW Washington, DC 20006-3708 Washington, DC 20006-3708 Mr. Alex Marion, Director Mr. Charles B. Brinkman, Director Programs Washington Operatiores Nuclear Energy Institute ABB-Combustion Engineering, Inc.
Suite 400 12300 Twinbrook Parkway, Suite 330 1776 i Street, NW Rockville, Maryland 20852 Washington, DC 20006-3708 l
Mr. David Modeen, Director Engineering Nuclear Energy Institute Suite 400 1776 l Street, NW Washington, DC 20006-3708 Mr. Anthony Pietrangelo, Director Licensing Nuclear Energy Institute I
Suite 400 1776 i Street, NW Washington, DC 20006-3708 Mr. Nicholas J. Liparulo, Manager Nuclear Safety and Regulatory Activities Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, Pennsylvania 15230 Mr. Jim Davis, Director Operations Nuclear Energy Institute Suite 400 1776 i Street, NW Washington, DC 20006-3708 i
\\
i l
).
- j Distribution: Mtg. Notics w/NEl ra Radiation Protection Ass:ssment Dated March 31.1999 Hard Ccoy,
Central Files PUBLIC PGEB R/F OGC ACRS SMagruder JWigginton OWFN Receptionist EMail SCollins/RZimmerman BSheron WKane
{
FGillespie BBoger TEssig DMatthews AMadison FAkstulewicz SMagruder KBarr JNoggle Chinson I
G.Kuzo
)
R.Pedersen SKlementowicz MBranch GTracy, EDO PMNS OPA
- _ _ _ _ _ _ _ _.