Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205G986 + (21:06:42, 7 December 2024)
- ML20205G985 + (21:06:42, 7 December 2024)
- ML20205G984 + (21:06:43, 7 December 2024)
- ML20205G981 + (21:06:44, 7 December 2024)
- ML20205G980 + (21:06:44, 7 December 2024)
- IR 05000353/1987001 + (21:06:45, 7 December 2024)
- ML20205G979 + (21:06:45, 7 December 2024)
- ML20205G974 + (21:06:46, 7 December 2024)
- IR 05000244/1987006 + (21:06:48, 7 December 2024)
- ML20205G966 + (21:06:49, 7 December 2024)
- ST-HL-AE-2002, Forwards Relief Request RR-ENG-06 for Relief from ASME Section XI Requirement for Surface Exam of Pressurizer Support Attachment Weld within Support Skirt Due to Access Considerations + (21:06:49, 7 December 2024)
- ML20205G963 + (21:06:51, 7 December 2024)
- ML20205G961 + (21:06:51, 7 December 2024)
- ML20205G957 + (21:06:52, 7 December 2024)
- ML20205G956 + (21:06:52, 7 December 2024)
- ML20205G955 + (21:06:53, 7 December 2024)
- ML20205G953 + (21:06:54, 7 December 2024)
- ST-HL-AE-2015, Responds to NRC Request for Info on Fault Current Values Used in Wyle Labs Test Rept Re Facility Reg Guide 1.75 Tests.Power,Control or Lighting Circuits & Control Circuitry Fault Current Levels Used in Tests + (21:06:54, 7 December 2024)
- ML20205G950 + (21:06:55, 7 December 2024)
- 05000263/LER-1987-007, :on 870227,Group IV Isolation Occurred During HPCI Testing.Caused by Design Deficiency in Flow Control Sys & Inadequate Surveillance Test Procedure.Hpci Operations Manual & Operabilty Test Procedure Revised + (21:06:57, 7 December 2024)
- ML20205G947 + (21:06:58, 7 December 2024)
- ML20205G946 + (21:07:00, 7 December 2024)
- LIC-99-0029, Forwards Response to 990226 RAI for GL 97-05, SG Tube Insp Techniques + (21:07:01, 7 December 2024)
- IR 05000412/1985022 + (21:07:02, 7 December 2024)
- ML20205G939 + (21:07:03, 7 December 2024)
- 05000305/LER-1987-002, :on 870224,reactor Tripped When Source Range Nuclear Flux Detectors 1 & 2 Erroneously Reached Nominal Reactor Trip Setpoint of 1.0E05 Counts/S.Caused by Seepage of Borated Refueling Water Into Instrument + (21:07:05, 7 December 2024)
- ML20205G933 + (21:07:06, 7 December 2024)
- ML20205G934 + (21:07:06, 7 December 2024)
- ML20205G930 + (21:07:08, 7 December 2024)
- ML20205G932 + (21:07:08, 7 December 2024)
- ML20205G929 + (21:07:09, 7 December 2024)
- ML20205G928 + (21:07:09, 7 December 2024)
- ML20205G926 + (21:07:10, 7 December 2024)
- ML20205G924 + (21:07:11, 7 December 2024)
- ML20205G923 + (21:07:11, 7 December 2024)
- ML20205G919 + (21:07:12, 7 December 2024)
- ML20205G921 + (21:07:12, 7 December 2024)
- ML20205G916 + (21:07:14, 7 December 2024)
- ML20205G918 + (21:07:14, 7 December 2024)
- ML20205G912 + (21:07:15, 7 December 2024)
- IR 05000413/1985044 + (21:07:16, 7 December 2024)
- BECO-85-186, Requests Change to Previous Commitment to Complete Breakwater Survey Following Major Storm.Complete Survey Unnecessary Expense Unless Initial Walkdown Indicates Need. Annual Breakwater Survey Will Continue to Be Performed + (21:07:17, 7 December 2024)
- ML20205G903 + (21:07:19, 7 December 2024)
- ML20205G902 + (21:07:19, 7 December 2024)
- ML20205G900 + (21:07:20, 7 December 2024)
- ML20205G897 + (21:07:23, 7 December 2024)
- ML20205G896 + (21:07:23, 7 December 2024)
- HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual + (21:07:24, 7 December 2024)
- ML20205G894 + (21:07:24, 7 December 2024)
- IR 05000322/1985037 + (21:07:27, 7 December 2024)
- ML20205G884 + (21:07:28, 7 December 2024)
- ML20205G887 + (21:07:28, 7 December 2024)