Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206E711 + (06:38:45, 7 December 2024)
- ML20206E709 + (06:38:47, 7 December 2024)
- ML20206E708 + (06:38:47, 7 December 2024)
- ML20206E707 + (06:38:48, 7 December 2024)
- ML20206E705 + (06:38:50, 7 December 2024)
- 05000322/LER-1988-016, :on 881011,fluctuation in Sys Voltage Occurred & Numerous ESF Actuated Due to External Source.Caused by Circumstances Beyond Control of Plant.No Corrective Actions Warranted & LER Will Become Required Reading + (06:38:51, 7 December 2024)
- ML20206E701 + (06:38:53, 7 December 2024)
- ML20206E702 + (06:38:53, 7 December 2024)
- ML20206E698 + (06:38:54, 7 December 2024)
- ML20206E696 + (06:38:55, 7 December 2024)
- ST-HL-AE-2843, First Interim Part 21 & Deficiency Rept Re Elastomer Diaphragms Contained in Comsip Delphi Containment Hydrogen Analyzers.Initially Reported on 881012.Unit 1 Regulator Replaced.Next Rept Will Be Submitted by 881216 + (06:38:56, 7 December 2024)
- ML20206E695 + (06:38:56, 7 December 2024)
- ML20206E691 + (06:38:57, 7 December 2024)
- ML20206E692 + (06:38:57, 7 December 2024)
- ML20206E688 + (06:38:58, 7 December 2024)
- ML20206E687 + (06:38:59, 7 December 2024)
- ML20206E686 + (06:38:59, 7 December 2024)
- IR 05000412/1986009 + (06:39:00, 7 December 2024)
- ML20206E685 + (06:39:00, 7 December 2024)
- ML20206E683 + (06:39:01, 7 December 2024)
- ML20206E681 + (06:39:02, 7 December 2024)
- ML20206E679 + (06:39:04, 7 December 2024)
- ML20206E677 + (06:39:05, 7 December 2024)
- ML20206E676 + (06:39:06, 7 December 2024)
- ML20206E675 + (06:39:07, 7 December 2024)
- ML20206E674 + (06:39:07, 7 December 2024)
- ML20206E671 + (06:39:08, 7 December 2024)
- ML20206E670 + (06:39:08, 7 December 2024)
- B13076, Informs That Provisions for Implementation of Recommendation 5,that Reactor Be Manually Scrammed If at Any Time During Operation in Regions A,B or C,Core Thermal Hydraulic Instability Occurs,Will Be in Place Prior to Startup + (06:39:10, 7 December 2024)
- ML20206E669 + (06:39:10, 7 December 2024)
- 05000461/LER-1987-010, :on 870308,main Control Room Ventilation Sys Train a Shifted to High Chlorine Mode on Signal from Chlorine Detector OXE-VC018B.Caused by Discolored Chlorine Sensitive Tape.Maint Work Request Written + (06:39:12, 7 December 2024)
- ML20206E666 + (06:39:13, 7 December 2024)
- ML20206E664 + (06:39:14, 7 December 2024)
- ML20206E661 + (06:39:14, 7 December 2024)
- ML20206E660 + (06:39:15, 7 December 2024)
- ML20206E659 + (06:39:16, 7 December 2024)
- ML20206E658 + (06:39:17, 7 December 2024)
- ML20206E656 + (06:39:17, 7 December 2024)
- ML20206E655 + (06:39:18, 7 December 2024)
- RBG-25-577, Forwards J Samuels to R Wood Re Present Levels of Nuclear Property Coverage for Facility,Per 10CFR50.54(w)(4) + (06:39:19, 7 December 2024)
- ML20206E652 + (06:39:19, 7 December 2024)
- ML20206E651 + (06:39:20, 7 December 2024)
- B13074, Forwards Addl Info Per 881019 Request for Insp Practices & Inservice Insp Program Re Reactor Bldg Closed Cooling Water (RBCCW) Sys.Info on Util Intent to Discontiue Local Leak Rate Testing on 12 Valves Located in RBCCW Sys Also Encl + (06:39:21, 7 December 2024)
- ML20206E650 + (06:39:21, 7 December 2024)
- ML20206E647 + (06:39:22, 7 December 2024)
- ML20206E648 + (06:39:22, 7 December 2024)
- ML20206E646 + (06:39:23, 7 December 2024)
- ML20206E644 + (06:39:24, 7 December 2024)
- 05000374/LER-1988-012-09, :on 881014,reactor Manually Scrammed Following Loss of Trip of Reactor Recirculation Pumps from Fast Speed to Off During Performance of Instrument Surveillance.Caused by Procedural Error.Procedure Will Be Revised + (06:39:25, 7 December 2024)
- ML20206E638 + (06:39:27, 7 December 2024)
- ML20206E637 + (06:39:28, 7 December 2024)
- B12487, Advises That Error Contained in Insp Repts 50-245/86-25, 50-336/86-30 & 50-423/86-37.Section 2.4 Should Be Revised to State That Nuclear Review Board Does Not in All Cases Complete Reviews Prior to Sys Being Declared Operational + (06:39:29, 7 December 2024)