UNITED STATES
'
8
NUCLEAR REGULATORY COMMISSION
o
g
- E
WASHINGTON, D. C. 20555
k.....,/
-
JUN 171986
Dacket No.:
50-412
Mr. J. J. Carey, Vice President
Duquesne Light Company
Nuclear Group
P. O. Box 4
Shippingport, PA 15077
Dear Mr. Carey:
Subject:
BEAVER VALLEY POWER STATION-UNIT NO. 2 (BV2) ENGINEERING ASSURANCE
PROGRAM (EAP) TECHNICAL AUDIT PREPARATION INSPECTION REPORT 50-412/
86-09
This letter conveys the results and conclusions of the inspection of review
plans for the Duquesne Light Company's (DLC) EA Technical Audit (Ref. EA-111
" Program for Completion of the Engineering Assurance In-Depth Technical Audits
of Beaver Valley 2 Project" dated April 23,1986).
The inspection was conducted
by the NRC's Office of Inspection and Enforcement and consultants.
The inspec-
tion took place at the offices of Stone and Webster Engineering Corporation
(SWEC), Boston, Massachusetts from April 28, 1986 to April 30, 1986.
The NRC's inspection of the EA Technical Audit preparation for BV2 was organized
into five disciplines:
mechanical systems, mechanical components, civil / structural,
electric power, and instruments and controls (I&C). In each of these disciplines,
the NRC inspectors concentrated on the preparations of SWEC review plans to
implement the proposed EA Technical Audit.
Where warranted, the NRC inspectors
reviewed the resumes and qualifications of the personnel of DLC/SWEC audit teams.
As a result of the inspection, the NRC inspection team concluded that, in most
cases, the preparations for the EA Technical audit were in accordance with the
proposed program plan and were in sufficient technical depth to achieve program
objectives.
The mechanical components and civil / structural disciplines had not
860623o507 860617
ADOCK 05000412
O
.
.
.
_
--
._
'
.
J. J. Carey
-2-
-
progressed to the point where a conclusion can be drawn.
Comments of the NRC
team are provided in the enclosed Inspection Report and its attachment.
Sincerely,
Ort inal e16u04 W
h. $$t>/ffu
Brian K. Grimes," Director
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure:
As stated
cc:
See attached page
Distribution:
C DC5. 016.s
~NRC PDR
Local PDR
QAB Reading
DQAVT Reading
JMTaylor, IE
RHVollmer, IE
BKGrimes, IE
HJMiller, IE
GTAnkrum, IE
EVImbro, IE
HBWang, IE
P. Tam, NRR
LSRubenstein, NRR
PKEapen, RI
LETripp, RI
Team Members
- SEE PREVIOUS PAGE FOR CONCURRENCE
'
f
- QAB:DQAVT:IE
- QAB:DQAVT:IE
- C:QAB:DQAVT:IE
D
AVT:JE
HBWang
EVImbro
GTAnkrum
JMiller
05/ /86
05/ /86
05/ /86
6//4/86
D:DQ
BKGr
06/[p '86
4
.
,m-----
- -
7
g
, - - _
'
,
J. J. Carey
-2-
progressed as far as the other desciplines.
Comments of the NRC team are provided
in the enclosed Inspection Report and its attachment.
/
S ncerely,
Brian K. Grimes, Director
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosure:
As stated
cc:
See attached page
Distribution:
DCS 016
NRC PDR
Local PDR
QAB Reading
DQAVT Reading
JMTaylor, IE
RHVollmer, IE
BKGrimes, IE
HJMiller, IE
GTAnkrum, IE
EVImbro, IE
HBWang, IE
P. Tam, NRR
LSRubenstein, NRR
PKEapen, RI
LETripp, RI
Team Members
QAB:0QAVT- E
Q B- QAVT:IE
C:QAE
AVT:IE
DD:DQAVT:IE
HBWang/8d
EVIm ro
GJAnt
HJMiller
05/,2
05/p 186
Gg
05/ /86
D:DQAVT:IE
BKGrimes
05/ /86
_
. .
._ .__
_ - _ _
_ _ _ _ _ _ _ _
. .
.
Mr. J. J. Carey
Duquesne Light Company
Beaver Valley 2 Power Station
.
CC*
Gerald Charnoff, Esq.
Mr. R. E. Martin, Manager
Jay E. Silberg, Esq.
Regulatory Affairs
Shaw, Pittman, Potts & Trowbridge
Duquesne Light Company
1800 M Street, N.W.
Beaver Valley Two Project
Washington, DC 20036
P. O. Box 328
Pittsburgh, Pennsylvania 15077
Mr. C. W. Ewing, Quality Assurance
Zori Ferkin
Manager
Assistant Counsel
Quality Assurance Department
Governor Energy Council
Duquesne Light Company
1625 N. Front Street
P. O. Box 186
Harrisburg, PA 15105
Shippingport, Pennsylvania 15077
Director, Pennsylvania Emergency
Management Agency
Room B-151
Transportation & Safety Building
Harrisburg, Pennsylvania 17120
Mr. T. J. Lex
Mr. Thomas Gerusky
Westinghouse Electric Corporation
Bureau of Radiation Protection
Power Systems
PA Department of Environmental
P. O. Box 355
Resources
Pittsburgh, Pennsylvania 15230
P. O. Box 2063
Harrisburg, Pennsylvania 17120
Mr. P. RaySircar
Stone & Webster Engineering Corporation
BVPS-2 Records Managenent Supervisor
P. O. Box 2325
Duquesne Light Company
Boston, Massachusetts 02107
Post Office Box 4
Shippingport, Pennsylvania
15077
Mr. W. Troskoski
-
!
U. S. NRC
John A. Lee, Esq.
P. O. 181
Duquesne Light Company
Shippingport, Pennsylvania 15077
10xford Centre
301 Grant Street
Mr. Thomas E. Murley, Regional Admin.
Pittsburgh, Pennsylvania 15?79
U. S. NRC, Region I
631 Park Avenue
King of Prussia, Pennsylvania 15229
l
.
i
I
!
,
!
!
'
<
- - _ .
-
. _ _
. - -
-- -
_
- _ _ _
._
- - ,