Forwards Engineering Assurance Program Technical Audit Preparation Insp Rept 50-412/86-09 on 860428-30.Audit in Accordance W/Proposed Program Plan.Mechanical Components & Civil/Structural Disciplines Inconclusive
ML20206E679
Person / Time
Site: Beaver Valley
Issue date: 06/17/1986
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20206E682 List:
References
TAC-62939, NUDOCS 8606230507
Download: ML20206E679 (4)


See also: IR 05000412/1986009

Text

'

'[

8

%'

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

g ;E WASHINGTON, D. C. 20555

-

k.....,/

JUN 171986

Dacket No.: 50-412

Mr. J. J. Carey, Vice President

Duquesne Light Company

Nuclear Group

P. O. Box 4

Shippingport, PA 15077

Dear Mr. Carey:

Subject: BEAVER VALLEY POWER STATION-UNIT NO. 2 (BV2) ENGINEERING ASSURANCE

PROGRAM (EAP) TECHNICAL AUDIT PREPARATION INSPECTION REPORT 50-412/

86-09

This letter conveys the results and conclusions of the inspection of review

plans for the Duquesne Light Company's (DLC) EA Technical Audit (Ref. EA-111

" Program for Completion of the Engineering Assurance In-Depth Technical Audits

of Beaver Valley 2 Project" dated April 23,1986). The inspection was conducted

by the NRC's Office of Inspection and Enforcement and consultants. The inspec-

tion took place at the offices of Stone and Webster Engineering Corporation

(SWEC), Boston, Massachusetts from April 28, 1986 to April 30, 1986.

The NRC's inspection of the EA Technical Audit preparation for BV2 was organized

into five disciplines: mechanical systems, mechanical components, civil / structural,

electric power, and instruments and controls (I&C). In each of these disciplines,

the NRC inspectors concentrated on the preparations of SWEC review plans to

implement the proposed EA Technical Audit. Where warranted, the NRC inspectors

reviewed the resumes and qualifications of the personnel of DLC/SWEC audit teams.

As a result of the inspection, the NRC inspection team concluded that, in most

cases, the preparations for the EA Technical audit were in accordance with the

proposed program plan and were in sufficient technical depth to achieve program

objectives. The mechanical components and civil / structural disciplines had not

860623o507 860617

PDR

O ADOCK 05000412

PDR

. . . _

--

l

._

'

.

J. J. Carey -2-

-

progressed to the point where a conclusion can be drawn. Comments of the NRC

team are provided in the enclosed Inspection Report and its attachment.

Sincerely,

Ort inal e16u04 W

h. $$t>/ffu

Brian K. Grimes," Director

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure: As stated

cc: See attached page

Distribution:

C DC5. 016.s

~NRC PDR

Local PDR

QAB Reading

DQAVT Reading

JMTaylor, IE

RHVollmer, IE

BKGrimes, IE

HJMiller, IE

GTAnkrum, IE

EVImbro, IE

HBWang, IE

P. Tam, NRR

LSRubenstein, NRR

PKEapen, RI

LETripp, RI

Team Members

  • SEE PREVIOUS PAGE FOR CONCURRENCE

'

  • QAB:DQAVT:IE

f

  • QAB:DQAVT:IE *C:QAB:DQAVT:IE D AVT:JE

HBWang EVImbro GTAnkrum JMiller

05/ /86 05/ /86 05/ /86 6//4/86

D:DQ

BKGr

06/[p '86

4

.


,m----- - -

g , - - _

'

,

J. J. Carey -2-

progressed as far as the other desciplines. Comments of the NRC team are provided

in the enclosed Inspection Report and its attachment.

/

S ncerely,

Brian K. Grimes, Director

Division of Quality Assurance, Vendor,

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure: As stated

cc: See attached page

Distribution:

DCS 016

NRC PDR

Local PDR

QAB Reading

DQAVT Reading

JMTaylor, IE

RHVollmer, IE

BKGrimes, IE

HJMiller, IE

GTAnkrum, IE

EVImbro, IE

HBWang, IE

P. Tam, NRR

LSRubenstein, NRR

PKEapen, RI

LETripp, RI

Team Members

QAB:0QAVT- E Q B- QAVT:IE C:QAE AVT:IE DD:DQAVT:IE

HBWang/8 d EVIm ro GJAnt HJMiller

05/,2 05/p 186 Gg 05/ /86

1

D:DQAVT:IE

BKGrimes

05/ /86

l

l

l

l

l

. . ._ .__ _ - _ _ _ _ _ _ _ _ _ _

_

.

. .

Mr. J. J. Carey

Duquesne Light Company Beaver Valley 2 Power Station

.

CC*

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager

Jay E. Silberg, Esq. Regulatory Affairs

Shaw, Pittman, Potts & Trowbridge Duquesne Light Company

1800 M Street, N.W. Beaver Valley Two Project

Washington, DC 20036 P. O. Box 328

Pittsburgh, Pennsylvania 15077

Mr. C. W. Ewing, Quality Assurance Zori Ferkin

Manager Assistant Counsel

Quality Assurance Department Governor Energy Council

Duquesne Light Company 1625 N. Front Street

P. O. Box 186 Harrisburg, PA 15105

Shippingport, Pennsylvania 15077

Director, Pennsylvania Emergency

Management Agency

Room B-151

Transportation & Safety Building

Harrisburg, Pennsylvania 17120

Mr. T. J. Lex Mr. Thomas Gerusky

Westinghouse Electric Corporation Bureau of Radiation Protection

Power Systems PA Department of Environmental

P. O. Box 355 Resources

Pittsburgh, Pennsylvania 15230 P. O. Box 2063

Harrisburg, Pennsylvania 17120

Mr. P. RaySircar

Stone & Webster Engineering Corporation BVPS-2 Records Managenent Supervisor

P. O. Box 2325 Duquesne Light Company

Boston, Massachusetts 02107 Post Office Box 4

Shippingport, Pennsylvania 15077

Mr. W. Troskoski -

!

U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company

Shippingport, Pennsylvania 15077 10xford Centre

301 Grant Street

Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15?79

U. S. NRC, Region I

631 Park Avenue

King of Prussia, Pennsylvania 15229

l

.

i

!

l

I

!

,  :

!

'

<  !

- - _ . - . _ _ . - - -- - _ - _ _ _ ._ - - ,