Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206N172 + (05:13:25, 7 December 2024)
- ML20206N168 + (05:13:27, 7 December 2024)
- 05000302/LER-1986-012, :on 860731,discovered That Surveillance Procedure SP-312, Heat Balance Calculations, Not Performed.Caused by Personnel Error.Procedure Conducted. Personnel Counseled + (05:13:29, 7 December 2024)
- ML20206N166 + (05:13:30, 7 December 2024)
- ML20206N164 + (05:13:31, 7 December 2024)
- ML20206N160 + (05:13:31, 7 December 2024)
- ML20206N159 + (05:13:32, 7 December 2024)
- 05000338/LER-1986-007-03, :on 860729,diesel-driven Fire Pump Out of Svc Greater than 7 Days.Caused by Test Coordinating Error Which Produced Delay.Personnel Responsible Counseled to Prevent Recurrence + (05:13:33, 7 December 2024)
- ML20206N157 + (05:13:34, 7 December 2024)
- JAFP-87-0297, Forwards Rev 5 to Ja Fitzpatrick Nuclear Power Plant Offsite Dose Calculation Manual & Util Response to NRC Questions Re Commission Review of Manual,Per Hi Abelson 861002 Request + (05:13:35, 7 December 2024)
- BSEP-99-0062, Forwards Latest Revs of COLR & Suppl Reload Licensing Rept, for Bsep,Unit 2.Proprietary Rev 6,Suppl 2 to NEDC- 31624P & EMF-2168P,included.Proprietary Encls Withheld, Per 10CFR2.790 & 10CFR9.17 + (05:13:38, 7 December 2024)
- ML20206N150 + (05:13:38, 7 December 2024)
- ML20206N149 + (05:13:39, 7 December 2024)
- ML20206N147 + (05:13:40, 7 December 2024)
- ML20206N148 + (05:13:40, 7 December 2024)
- ML20206N144 + (05:13:41, 7 December 2024)
- ML20206N145 + (05:13:41, 7 December 2024)
- IR 05000293/1986015 + (05:17:31, 7 December 2024)
- ML20206N142 + (05:17:32, 7 December 2024)
- ML20206N140 + (05:17:33, 7 December 2024)
- ML20206N141 + (05:17:33, 7 December 2024)
- ML20206N136 + (05:17:34, 7 December 2024)
- ML20206N135 + (05:17:35, 7 December 2024)
- ML20206N131 + (05:17:38, 7 December 2024)
- 3F0599-16, Rev 0 to LAR 251 to License DPR-72,revising CR-3 ITS Administrative Controls Section 5.8, High Radiation Area. Util Requests NRC Approval by June 30,2000 + (05:17:39, 7 December 2024)
- 05000414/LER-1986-032, :on 860709,main Feedwater Isolation Occurred Due to hi-hi Level in Steam Generator C.Caused by Leaking Control Valves.Procedures Revised to Isolate Control Valves When Providing Flow W/Control Bypass Valves + (05:17:41, 7 December 2024)
- ML20206N128 + (05:17:42, 7 December 2024)
- ML20206N127 + (05:17:43, 7 December 2024)
- ML20206N125 + (05:17:43, 7 December 2024)
- 05000414/LER-1986-033-01, :on 860711,Phase a Containment Isolation Occurred,Closing Nonessential Containment Penetration Isolation Valves.Cause Not Determined.Valves Will Be Tested to Verify Proper Operation.Tech Specs Will Be Revised + (05:17:46, 7 December 2024)
- ML20206N123 + (05:17:47, 7 December 2024)
- IR 05000352/1999002 + (05:17:50, 7 December 2024)
- 05000373/LER-1986-032, :on 860722 & 0803,discovered That Two Reactor Vessel Low Level Switches Out of Tolerance.Cause Unknown. Level Switches Immediately Recalibr to Normal Setpoint Values.Comprehensive Action Plan Developed + (05:17:51, 7 December 2024)
- ML20206N111 + (05:17:53, 7 December 2024)
- ML20206N110 + (05:17:53, 7 December 2024)
- ML20206N109 + (05:17:54, 7 December 2024)
- B16717, Forwards Addendum 1,Rev 10 to FSAR in Form of Replacement Pages & Addendum 3 to Annual Rept,Including Info Covering Changes Not Included in 970228 Submittal.Addendum 1,Rev 10 to FSAR Filed in Category K + (05:17:55, 7 December 2024)
- ML20206N106 + (05:17:56, 7 December 2024)
- ML20206N105 + (05:17:57, 7 December 2024)
- 05000387/LER-1986-027, :on 860725,w/Unit 1 Operating at 100% Power & Unit 2 Operating at 79% Power,Limiting Condition for Operation 3.0.3 Entered to Perform Surveillance Testing.Tech Spec Change Requested to Clarify Action + (05:17:59, 7 December 2024)
- ML20206N098 + (05:18:00, 7 December 2024)
- 05000341/LER-1986-021, :on 860720,while in Cold Shutdown,Rwcu Inboard Isolation Valve Autoisolated Three Times.Caused by Blown Fuses & Broken Differential Temp Thermocouple Flange.Fuses Replaced + (05:18:03, 7 December 2024)
- ML20206N096 + (05:18:04, 7 December 2024)
- ML20206N091 + (05:18:08, 7 December 2024)
- ML20206N090 + (05:18:08, 7 December 2024)
- ML20206N089 + (05:18:09, 7 December 2024)
- TXX-4932, Responds to Violations Noted in Insp Repts 50-445/85-13 & 50-446/85-09.Corrective Actions:Insp Findings Evaluated & Nonconformance Repts Issued for Valid Deficiencies + (05:18:10, 7 December 2024)
- IR 05000333/1999003 + (05:18:14, 7 December 2024)
- ML20206N085 + (05:18:16, 7 December 2024)
- ML20206N082 + (05:18:16, 7 December 2024)
- 05000213/LER-1986-040, :on 860724,discovered That No 3-inch Diameter or Equivalent Opening Present in RCS Pressure Boundary During Low Temp Surveillance Test.Caused by Conflicting Tech Spec Test.Performance Interval Changed + (05:18:18, 7 December 2024)