Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102A381 + (05:54:54, 6 January 2025)
- ML18102A378 + (05:54:55, 6 January 2025)
- 05000311/LER-1996-002-02, :on 960701,waste Gas Decay Tank Oxygen Concentration Exceeded TSs Limit.Caused by Poor Wording & Interpretation of Tss.Oxygen Concentration Levels Restored. Request to Resolve TS 3.11.2.5 Submitted to NRC on 960815 + (05:54:56, 6 January 2025)
- ML18102A372 + (05:54:58, 6 January 2025)
- ML18102A370 + (05:54:58, 6 January 2025)
- ML18102A369 + (05:54:59, 6 January 2025)
- ML18102A366 + (05:55:00, 6 January 2025)
- ML18102A367 + (05:55:00, 6 January 2025)
- ML18102A365 + (05:55:04, 6 January 2025)
- ML18102A363 + (05:55:05, 6 January 2025)
- ML18102A362 + (05:55:07, 6 January 2025)
- ML18102A361 + (05:55:07, 6 January 2025)
- ML18102A359 + (05:55:09, 6 January 2025)
- 05000311/LER-1996-008-02, :on 960729,battery Chargers Were Declared Inoperable Due to Mfg Discrepancies.Unit 2 Battery Chargers Will Be Reworked to Design Specifications by 960915 + (05:55:10, 6 January 2025)
- ML18102A356 + (05:55:11, 6 January 2025)
- 05000272/LER-1996-017-01, :on 960725,surveillance Was Missed for Plant Vent.Caused by Personnel Error.Lco Compensatory Action Was Immediately Completed Upon Discovery of Missed TS Requirement + (05:55:13, 6 January 2025)
- ML18102A354 + (05:55:14, 6 January 2025)
- ML18102A351 + (05:55:15, 6 January 2025)
- ML18102A349 + (05:55:16, 6 January 2025)
- ML18102A347 + (05:55:17, 6 January 2025)
- ML18102A346 + (05:55:18, 6 January 2025)
- ML18102A344 + (05:55:19, 6 January 2025)
- ML18102A343 + (05:55:20, 6 January 2025)
- 05000272/LER-1996-019-01, :on 960729,misclassification of Blow Down Sample Valves Noted.Caused by Flawed Engineering Evaluation. Review of Other Salem Piping Penetrations Performed + (05:55:22, 6 January 2025)
- ML18102A340 + (05:55:23, 6 January 2025)
- 05000272/LER-1996-015-01, :on 960722,inadequate Cfcu Heat Removal Capability Identified.Caused by Failure to Effectively Chlorinate Service Water.Cfcu Monitoring Program Developed & Procedures & Training Revised + (05:55:25, 6 January 2025)
- ML18102A338 + (05:55:26, 6 January 2025)
- SCH96-114, New Jersey Pollutant Discharge Elimination Sys Discharge Monitoring Repts for Sgs + (05:55:27, 6 January 2025)
- ML18102A336 + (05:55:29, 6 January 2025)
- 05000272/LER-1996-012-01, :on 960723,potential Loss of Residual Capability Identified.Caused by Inadequate Valve Design.Rhr Flow Control Valves Replaced + (05:55:31, 6 January 2025)
- ML18102A333 + (05:55:32, 6 January 2025)
- ML18102A334 + (05:55:32, 6 January 2025)
- ML18102A332 + (05:55:33, 6 January 2025)
- 05000311/LER-1996-009-02, :on 960808,determined Current Shift Schedules Deviates from License Condition 2.C(24)(a).Caused by Inadequate Review of License Requirements.Will Continue to Operate on 12-hour Schedule + (05:55:34, 6 January 2025)
- ML18102A329 + (05:55:36, 6 January 2025)
- ML18102A327 + (05:55:36, 6 January 2025)
- 05000272/LER-1996-018-01, :on 960719,potential Performance Impact on ECCS Identified Involving non-safety Related Refueling Water Storage Tank Piping.Caused by Design Discrepancy.Design Reviewed & Revised + (05:55:57, 6 January 2025)
- 05000272/LER-1996-016-01, :on 960719,missed Surveillance for RHR Pump Dynamic Head Prior to Entering Mode 4.Caused by Inadequate Procedural Control for Verification of Change Requirements + (05:56:33, 6 January 2025)
- ML18102A323 + (05:56:37, 6 January 2025)
- ML18102A320 + (05:56:40, 6 January 2025)
- ML18102A319 + (05:56:42, 6 January 2025)
- ML18102A318 + (05:56:44, 6 January 2025)
- IR 05000272/1996001 + (05:56:46, 6 January 2025)
- ML18102A316 + (05:56:48, 6 January 2025)
- ML18102A314 + (05:56:50, 6 January 2025)
- ML18102A313 + (05:56:51, 6 January 2025)
- ML18102A312 + (05:56:54, 6 January 2025)
- 05000272/LER-1996-005-03, :on 960325,TS Surveillance Requirement Implementation Deficiencies Identified.Caused by Lack of Adequate Controls & Understanding of Development Weakness. Procedures Revised + (05:57:09, 6 January 2025)
- 05000311/LER-1996-007-02, :on 960716,containment Penetration Conductor Overcurrent Circuit Breakers Had Not Been Demonstrated Operable Per Ts.Caused by Failure to Assure That Info Was Incorporated Into Sr.Procedures Reviewed + (05:57:15, 6 January 2025)
- 05000272/LER-1996-014-02, :on 960717,potential Hydrogen Embrittlement on 4kV Breaker Parts Identified.Caused by Cracked Roll Pin,Due to Lack of Knowledge of Plating Induced Hydrogen Embrittlement.Cause Evaluation Being Conducted + (05:57:22, 6 January 2025)
- 05000272/LER-1996-014, Corrected LER 96-014-00:on 960717,potential Hydrogen Embrittlement on 4kV Breaker Parts Identified.Root Cause Investigation Being Conducted.All NLI Refurbished Breakers Removed Except 2B4D from Vital Loads + (05:57:29, 6 January 2025)